|
| 1 | Brick work in second class bricks (9x4 3/8 x 2 3/4...ick walls upto basement (upto 1m high above G.L.). |
| 2 | Construction of Inspection chamber of size 60x60x6...ements to lift for cleaning purpose,etc.,complete. |
| 3 | Stainless Steel Handrail 900mm high Providing an...lead, lift,etc. as directed by Engineer in-charge. |
| 4 | Boring using power rig 125mm dia upto hard formati...t time etc. complete as directed during execution. |
| 5 | Supplying and lowering PVC pipe 125mm dia slotted casing pipe of 6kg/sq.cm. ISI Std. |
| 6 | Conducting yield test using v notch and with suita...ay as directed during execution for the bore well. |
| 7 | Supplying and lowering PVC pipe 125mm dia plain casing pipe of 6kg/sq.cm. ISI Std. |
| 8 | Supplying and Jointing 40mm dia P.V.C pipe.includi...erfixing with necessary scaffolding etc. complete. |
| 9 | Supplying and Jointing 25mm dia PVC pipe.including...r fixing with necessary scaffolding etc. complete. |
| 10 | Supplying and Jointing 20mm dia PVC pipe.including... fixing with necessary scaffolding etc. complete.. |
| 11 | 2.0 HP Submersible Pump |
| 12 | Wiring with 2 x 1.5 sqmm (22 / 0.3) PVC insulated ...light point / fan point (For electronic Regulator) |
| 13 | Supply and run of 2 of 6sqmm (84/0.3) PVC insulate...good of the concealed portion with suitable colour |
| 14 | Supplying and fixing 25mm dia PVC ball valve. |
| 15 | Painting the OLD plastered walls with two coats of...tion and the durability period should be 5 years. |
| 16 | Supply & stacking of red earth at site to the depa...tacking and inclusive of all taxes etc., complete. |
| 17 | Supply of well decomposed Farm yard Manure in a po... highly nutrient and which supports plant growth. |
| 18 | Mixing charges of Red soil, sand and manure unifor...ration of soil mixture (excluding material cost) |
| 19 | Truffing of Korean grass / mexican grass includ...ated earth etc as directed by the site in-charge. |
| 20 | Supplying and Planting of Dypsis lutescens (Arec...vated earth etc as directed by the site in-charge. |
| 21 | Planting of Lilly foliage shrub variety of heig...vated earth etc as directed by the site in-charge. |
| 22 | Planting of Dracena mahatma ornamental foliage sh...ated earth etc as directed by the site in-charge. |
| 23 | Planting of Duranta new gold Plant ornamental fol...ated earth etc as directed by the site in-charge. |
| 24 | Planting of Ficus starlight ornamental foliage Sp...vated earth etc as directed by the site in-charge. |
| 25 | Planting of Pandanus ornamental foliage shrub var...vated earth etc as directed by the site in-charge. |
| 26 | Planting of Dracena chlorama ornamental foliage s...vated earth etc as directed by the site in-charge. |
| 27 | Planting of Heliconium foliage shrub variety of ...vated earth etc as directed by the site in-charge. |
| 28 | Planting of Shade grass including loading and un...ated earth etc as directed by the site in-charge. |
| 29 | Planting of Nerium oleander dwarf foliage shrub va...vated earth etc as directed by the site in-charge. |
| 30 | Planting of Acalypha varieties ornamental foliag...vated earth etc as directed by the site in-charge |
| 31 | S/F Hose Pipe 50 Meter |
| 32 | Repairs Grill Work |