|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming thebottom, bailing out water as required complete. (a) Depth of excavation not exceding 15000 mm |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. Abutment, wing wall and floor |
| 4 | Cement concrete with 30 mm down graded shingles excluding shuttering.N.B. Variety, In ground floor, (a) 1:3:6 proportion abutmnt, wing wall floor etc. |
| 5 | Ordinary Cement concrete (mix1:1.5:3) with graded stone chips (20mm nominal size) excluding shutteringand reinforcement if any, in groundfloor as per relevant IS codes.(i) River Bazree |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. |
| 7 | Reinforcement for reinforced concrete work in all sorts of structuresincluding distribution bars, stirrups, binders etc initial straightening andremoval of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawingand direction.(a) for works in foundation and upto roof of ground floor/upto 4 meter other than SAIL/TATA/RINL @ 1.25% of item no 4 |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortarincluding rounding off or chamfering corners as directed andraking out joints including throating, nosing and drip course,scaffolding/staging where necessary (Ground floor).[Excludingcost of chipping over concrete surface] abutment wall, floor, wing wall, wheel guard |
| 9 | Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 10 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)With carried earth arranged by the contractor within a radius of 1 km. including cost of carriedearth. |
| 11 | Providing and fixing concrete sign board as per iRC specificaton direction of the Engineer-In-Charge |
| 12 | GST and LWC add |