|
| 1 | Retaining Walls/ Breast Walls |
| 2 | Construction of retaining walls/breast walls in cement mortar 1:5 as per drawing and Technical specification Clause 1604.(i) Earthwork in excavation for structures BY MANUAL MEANS Ordinary Soil |
| 3 | ii. Stone Masonry in cement mortar 1:5 |
| 4 | (vii) Back filling behind retaining wall/breast wall |
| 5 | Providing 12 mm thick cement plastering in cement mortar 1: 2, 1: 3 and 1: 4 including cleaning the surface, curing and carriage of all materials within 200 m complete as per Technical Specification. iii. Proportion 1:4 |
| 6 | Loading and Unloading of Lime, Aggregates, Stone Boulder, Brick Aggregates, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work etc.By Manual Means. A.Stones(i) Loading of Lime, Aggregates, Stone boulder, Brick Aggregates, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m |
| 7 | (iii) Unloading of Lime, Aggregates, Stone boulder, Brick Aggregates, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m. |
| 8 | B. Sand(ii) Loading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 m |
| 9 | (iv) Unloading of Earth, Sand, Moorum, Manure, Flyash by manual means including a lead upto 30 m |
| 10 | i) Haulage of materials by tipper excluding cost of loading and unloading and stacking. A. Stones Case I SurfaceRoad:i) Haulage of materials by tipper excluding cost of loading and unloading and stacking |
| 11 | Case II.Unsurface Road i) Haulage of materials by tipper excluding cost of loading and unloading and stacking. |
| 12 | B. Sand Case I SurfaceRoad:i) Haulage of materials by tipper excluding cost of loading and unloading and stacking |
| 13 | Case II.Unsurface Road i) Haulage of materials by tipper excluding cost of loading and unloading and stacking. |