| 1 | Labour engazed for site clearance |
| 2 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l. |
| 3 | Eartworkin excavation in foundationtrenches in ordinary soil( vide classification of soil item A+B) and disposalof excavated earthas obtained to a distance upto 50 M includingall lifts ,leveling ,rammingthe foundation treches ,removingroots of trees,shurbs all complete as perapproved design ,building specificationand direction ofE/I . |
| 4 | Providing coarse clean sand filling in foundation treches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and liftsincluding cost of all materials , labour ,royalityand taxes all completeas per building specificificationand direction of E/I ( |
| 5 | Providingdesignation75 B one bricks flat solingjoints filled with local sand including cost of watering taxes royaity all completeas per buildingspecification and directionof E/I |
| 6 | Providing and layingin position 1:1.5:3(1 cement :1.5 coarse sand (zone-3 ) :3graded stone aggregate 20mmnominal size ) grade ofRcc ,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level . |
| 7 | Providing 12mm cement plaster (1:3 )and 1.5 mm cement punningwith clean coarse sandof F.M 1.5includingscreening,curringwith all lead and lift of water ,scaffoldingtaxes and royality all completeas per building specificationand direction of E/I. |
| 8 | Providing and layingin position 1:3:6 (1 cement :3 coarse sand (zone-3 ) :6graded stone aggregate 40 mmnominal size ) grade ofPcc ,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level . |
| 9 | Providing and layingin position 1:1.5:3 (1 cement :1.5 coarse sand (zone-3 ) :3graded stone aggregate 20 mmnominal size ) grade ofPcc ,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level . |
| 10 | Providing and layingin position 1:1.5:3(1 cement :1.5 coarse sand (zone-3 ) :3graded stone aggregate 20mmnominal size ) grade ofRcc ,excludingthe cost ofcentering ,shuttering ,finishing and reinforcement -all work upto plinth level . |
| 11 | ProvidingTOR steel reinforcement of 8 mm and 10mmdia rods s per approved design and dra wingexcludingcarrige of bars to work site ,cutting ,bending and bindingwith annealedwirewith cost of wire ,removal of rust ,placing the rods in position all complete as perbuilding specification and direction of E/I8 mm dia bars TMT Fe 500 (onlyvalidfor Tata (Tiscon ), SAIL,JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL ) ) |
| 12 | 10 mm dia bars TMT coilFe 500 (onlyvalidfor Tata (Tiscon ), SAIL,JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL ) ) |
| 13 | centeringshutteringincluding strutting ,prpping and removal of for foundation ,footing,base of cloumn ,etc for mass concrete |
| 14 | Cement(lead3km ) |
| 15 | Sand( lead 5 km ) |
| 16 | Stone chips (lead 30 km ) |
| 17 | Bricks(lead 8 km) |
| 18 | Stone Metal(lead 30 km ) |
| 19 | Steel(lead 3km ) |
| 20 | ADD GST |
| 21 | ADD LABOUR CESS |