Power Government Departments Closing in 0 days TDR #34301213

Annual Environment Monitoring Job At Sgtpp For A Period Of 24 Months A- 1 Emission Through Stack / Stacks Monitoring:Collection Of No. Of Samples For Emission Through Stack / Stacks From Different Passes Of The Operating Unit / Units Of The Power Station

Issued by Government Departments · sagardighi, West Bengal
Tender Value
4.20 Lakhs
Estimated cost
Bid Submission
05 Nov 2022
0 days left
EMD
8405
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
sagardighi → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Annual Environment Monitoring Job At Sgtpp For A Period Of 24 Months A- 1 Emission Through Stack / Stacks Monitoring:Collection Of No. Of Samples For Emission Through Stack / Stacks From Different Passes Of The Operating Unit / Units Of The Power Station Conducting Analysis And Submitting Report For Pm, So2, Nox, Mercury Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months. 2 Ambient Air Monitoring : Collection No. Of Sample For Ambient Air From 03 ( Three ) Different Identified Locations Prevailing At The Power Station Conductinganalyzing And Submitting Report Containing Relevant Parameters Including Pm-2.5, Pm-10, So2, No2 O3, Pb, Co, Nh3, C6h6, As, Ni, Bap, Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months 3 Boiler Blow Down Monitoring : Collection Of No. Of Samples For Analyzing Liquid Effluent Water From Boiler Blow Down At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Cu ( Total ) , Fe ( Total ) &Tss ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months 4 Cooling Tower Blow Down Monitoring : Collection Of No. Of Samples For Analyzing Liquid Effluent Waterfrom Cooling Tower Blow Down At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Cr ( Total ) , Zn, Free Available Chlorine And Phosphate. ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 5 Effluent Water From Ash Pond Overflow : Effluent Water From Ash Pond Overflowcollection Of No. Of Sample For Analyzing Liquid Effluent Water From Ash Pond Overflow Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Ph, &Tss ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 6 Effluent Water From Power House Common D : Collection Of No. Of Samples For Analyzing Liquid Effluent Water From Power House Common Disposal Sump At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Ph, Tds, Tss, Bod, Cod, ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 7 Drinking Water From Power House And Town : Collection Of No. Of Sample Not Exceeding 2 ( Two ) Location For Analyzing Drinking Water From Power House And Township And Submitting Report Etc. Parameters To Be Tested Are: Fluoride, Nitrate, Total Coliform, Fecal Coliform & E. Coli., During 24 ( Twenty Four ) Calendar Months 8 Fugitive Air For 4 ( Four ) Separate Locat : Collection Of Number Of Samples For Fugitive Air For 4 ( Four ) Separate Locations Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb, During During 24 ( Twenty Four ) Calendar Months 9 Effluent Water From Outfall Locations : Collection Of Number Of Samples Of Effluent Water From Outfall Locations Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months 10 Monitoring Of Noise Level : Monitoring Of Noise Level At Location Not Exceeding 4 ( Four ) Samples In Number Analyzing And Submitting Report Etc. As Per Guideline Of Moef&Cc, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months. 11 Ash From Silo, Ash Pond & Bottom Ash : Collection Of Samples Not Exceeding 3 ( Three ) Of Ash From Silo, Ash Pond & Bottom Ash Analyzing And Submitting Report Etc. Ail As Per Guideline / Stipulation Of Moef&Cc, Goi / Cea / Wbpcb Showing Different Parameters I.E Cadmium, Arsenic, Hexavalent Chromium, Thalium, Nickel, Lead, Zinc, Selenium, Mercury During 24 ( Twenty Four ) Calendar Months. 12 Borewell Of Outfall Locations Of Ash Pon : Collection Of Number Of Samples From Borewell Of Outfall Locations Of Ash Pond Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb.Parameters To Be Tested Are: Odour, Turbidity, Ph, Conductivity, Tds, Tss, Cod, Bod, O&G, Al, Mb As, B, Ca, Cl, Cu, F, Rfc, Fe, Mg 13 Plant Discharge Effluent Water From Out : Collection Of Number Of Plant Discharge Effluent Water From Outfall Locations Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb. Parameters To Be Tested Are: Odour , Turbidity, Ph, Conductivity, Tds, Tss, Cod, Bod, O&G, Al, Mb As, B, Ca, Cl, Cu, F, Rfc, Fe, Mg, Hardness, Zn, Cd, Cn, Hg, As, Total Cr, Pb During 24 ( Twenty Four ) Calendar Months. 14 Intake Water From River Bhagirathi 15 Environment Statement : Preparation Of Environment Statement As Per Guideline / Stipulationof Moef&Cc, Goi / Wbpcb Comprising All Above & Necessary Particulars During 24 ( Twenty Four ) Calendar Months. 16 Analysis Of Liquid Waste Water From Town: Analysis Of Liquid Waste Water From Township Disposal For Analyzing Following Parameters : Tss, Ph, O&G

BOQ

Name of the job : Annual Environment Monitoring Job at SgTPP for a period of 24 (twenty four) months
Sl. No. Item Description
1Emission through stack/stacks monitoring:Collection of no. of samples for emission through stack/stacks from different passes of the operating unit/units of the Power Station conducting analysis and submitting report for PM,SO2, NOx,Mercury etc. all as per guideline/stipulation of CEA,MOEF, GOI/WBPCB, during 24 (Twenty four) calendar months.
2Ambient air monitoring : Collection no. of sample for ambient air from 03 (three) different identified locations prevailing at the Power Station conductinganalyzing and submitting report containing relevant parameters including PM-2.5, PM-10,SO2, NO2 O3, Pb, CO, NH3,C6H6, As, Ni, BaP, etc. all as per guideline/stipulation of CEA, MOEF, GOI/WBPCB,during 24 (Twenty four) calendar months
3Boiler Blow Down monitoring : Collection of no. of samples for analyzing liquid effluent water from Boiler Blow Down at outfall locations and submitting report etc. all as per guideline/stipulation of CEA, MOEF, GOI/WBPCB. Parameters to be tested are: oil & grease, Cu (total), Fe (total)&TSS (All in mg/lit.), during 24 (Twenty four) calendar months
4Cooling Tower Blow Down monitoring : Collection of no. of samples for analyzing liquid effluent waterfrom Cooling Tower Blow Down at outfall locations and submitting report etc. all as per guideline/stipulation of CEA,MOEF, GOI/WBPCB. Parameters to be tested are: Cr (total), Zn, free available chlorine and Phosphate. (All in mg/lit.), during 24 (Twenty four) calendar months.
5Effluent water from Ash Pond Overflow : Effluent water from Ash Pond OverflowCollection of no. of sample for analyzing liquid effluent water from Ash Pond Overflow submitting report etc. all as per guideline/stipulation of CEA, MOEF, GOI/WBPCB. Parameters to be tested are: Oil & Grease, pH, &TSS (All in mg/lit.), during 24 (Twenty four) calendar months.
6Effluent water from Power House Common D : Collection of no. of samples for analyzing liquid effluent water from Power House Common Disposal Sump at outfall locations and submitting report etc. all as per guideline/stipulation of CEA, MOEF, GOI/WBPCB. Parameters to be tested are: Oil & Grease, pH, TDS, TSS, BOD, COD, (All in mg/lit.), during 24 (Twenty four) calendar months.
7Drinking water from Power House and Town : Collection of no. of sample not exceeding 2 (two) location for analyzing drinking water from Power House and Township and submitting report etc. Parameters to be tested are: Fluoride,Nitrate, Total coliform, Fecal coliform & E. Coli., during 24(Twenty four)calendar months
8Fugitive air for 4 (four) separate locat : Collection of number of samples for fugitive air for 4 (four) separate locations analyzing and submitting report etc. all as per guideline / stipulation of MoEF&CC, GOI/WBPCB,during during 24 (Twenty four) calendar months
9Effluent water from outfall locations : Collection of number of samples of effluent water from outfall locations number not exceeding 2 (two) analyzing and submitting report etc. all as per guideline / stipulation of MoEF&CC, GOI/WBPCB, during 24 (Twenty four) calendar months
10Monitoring of noise level : Monitoring of noise level at location not exceeding 4 (four) samples in number analyzing and submitting report etc. as per guideline of MoEF&CC, GOI/ WBPCB, during 24 (Twenty four)calendar months.
11Ash from silo, Ash Pond & bottom ash : Collection of samples not exceeding 3 (three) of ash from silo,Ash Pond & bottom ash analyzing and submitting report etc. ail as per guideline/stipulation of MoEF&CC, GOI/CEA/ WBPCB showing different parameters i.e Cadmium, Arsenic, Hexavalent Chromium, Thalium, Nickel, Lead, Zinc, Selenium, Mercury during 24 (Twenty four)calendar months.
12Borewell of outfall locations of Ash Pon : Collection of number of samples from borewell of outfall locations of Ash Pond number not exceeding 2 (two) analyzing and submitting report etc. all as per guideline / stipulation of MoEF&CC, GOI/WBPCB.Parameters to be tested are: Odour,Turbidity,pH,Conductivity,TDS,TSS,COD,BOD,O&G,Al,MB AS,B,Ca,Cl,Cu,F,RFC,Fe,Mg
13Plant discharge effluent water from out : Collection of number of plant discharge effluent water from outfall locations number not exceeding 2 (two) analyzing and submitting report etc. all as per guideline / stipulation of MoEF&CC,GOI/WBPCB. Parameters to be tested are: Odour , Turbidity, pH, Conductivity, TDS,TSS,COD,BOD,O&G,Al,MB AS,B,Ca,Cl, Cu,F,RFC,Fe, Mg, Hardness, Zn, Cd, CN, Hg, As, Total Cr,Pb during 24 (Twenty four) calendar months.
14Intake water from river Bhagirathi
15Environment Statement : Preparation of Environment Statement as per guideline/stipulationof MOEF&CC,GOI/WBPCB comprising all above & necessary particulars during 24(twenty four) calendar months.
16Analysis of Liquid waste water from Town: Analysis of Liquid waste water from Township Disposal for analyzing following Parameters : TSS, pH, O&G

AI Tender Summary

OUR REF NO 34301213
AUTHORITY Government Departments
TENDER VALUE 4.20 Lakhs
LAST DATE 05-11-2022
Authority
Authority Name West Bengal Power Development Corporation Limited
Work Description Annual Environment Monitoring Job At Sgtpp For A Period Of 24 Months A- 1 Emission Through Stack / Stacks Monitoring:Collection Of No. Of Samples For Emission Through Stack / Stacks From Different Passes Of The Operating Unit / Units Of The Power Station Conducting Analysis And Submitting Report For Pm, So2, Nox, Mercury Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months. 2 Ambient Air Monitoring : Collection No. Of Sample For Ambient Air From 03 ( Three ) Different Identified Locations Prevailing At The Power Station Conductinganalyzing And Submitting Report Containing Relevant Parameters Including Pm-2.5, Pm-10, So2, No2 O3, Pb, Co, Nh3, C6h6, As, Ni, Bap, Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months 3 Boiler Blow Down Monitoring : Collection Of No. Of Samples For Analyzing Liquid Effluent Water From Boiler Blow Down At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Cu ( Total ) , Fe ( Total ) &Tss ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months 4 Cooling Tower Blow Down Monitoring : Collection Of No. Of Samples For Analyzing Liquid Effluent Waterfrom Cooling Tower Blow Down At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Cr ( Total ) , Zn, Free Available Chlorine And Phosphate. ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 5 Effluent Water From Ash Pond Overflow : Effluent Water From Ash Pond Overflowcollection Of No. Of Sample For Analyzing Liquid Effluent Water From Ash Pond Overflow Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Ph, &Tss ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 6 Effluent Water From Power House Common D : Collection Of No. Of Samples For Analyzing Liquid Effluent Water From Power House Common Disposal Sump At Outfall Locations And Submitting Report Etc. All As Per Guideline / Stipulation Of Cea, Moef, Goi / Wbpcb. Parameters To Be Tested Are: Oil & Grease, Ph, Tds, Tss, Bod, Cod, ( All In Mg / Lit. ) , During 24 ( Twenty Four ) Calendar Months. 7 Drinking Water From Power House And Town : Collection Of No. Of Sample Not Exceeding 2 ( Two ) Location For Analyzing Drinking Water From Power House And Township And Submitting Report Etc. Parameters To Be Tested Are: Fluoride, Nitrate, Total Coliform, Fecal Coliform & E. Coli., During 24 ( Twenty Four ) Calendar Months 8 Fugitive Air For 4 ( Four ) Separate Locat : Collection Of Number Of Samples For Fugitive Air For 4 ( Four ) Separate Locations Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb, During During 24 ( Twenty Four ) Calendar Months 9 Effluent Water From Outfall Locations : Collection Of Number Of Samples Of Effluent Water From Outfall Locations Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months 10 Monitoring Of Noise Level : Monitoring Of Noise Level At Location Not Exceeding 4 ( Four ) Samples In Number Analyzing And Submitting Report Etc. As Per Guideline Of Moef&Cc, Goi / Wbpcb, During 24 ( Twenty Four ) Calendar Months. 11 Ash From Silo, Ash Pond & Bottom Ash : Collection Of Samples Not Exceeding 3 ( Three ) Of Ash From Silo, Ash Pond & Bottom Ash Analyzing And Submitting Report Etc. Ail As Per Guideline / Stipulation Of Moef&Cc, Goi / Cea / Wbpcb Showing Different Parameters I.E Cadmium, Arsenic, Hexavalent Chromium, Thalium, Nickel, Lead, Zinc, Selenium, Mercury During 24 ( Twenty Four ) Calendar Months. 12 Borewell Of Outfall Locations Of Ash Pon : Collection Of Number Of Samples From Borewell Of Outfall Locations Of Ash Pond Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb.Parameters To Be Tested Are: Odour, Turbidity, Ph, Conductivity, Tds, Tss, Cod, Bod, O&G, Al, Mb As, B, Ca, Cl, Cu, F, Rfc, Fe, Mg 13 Plant Discharge Effluent Water From Out : Collection Of Number Of Plant Discharge Effluent Water From Outfall Locations Number Not Exceeding 2 ( Two ) Analyzing And Submitting Report Etc. All As Per Guideline / Stipulation Of Moef&Cc, Goi / Wbpcb. Parameters To Be Tested Are: Odour , Turbidity, Ph, Conductivity, Tds, Tss, Cod, Bod, O&G, Al, Mb As, B, Ca, Cl, Cu, F, Rfc, Fe, Mg, Hardness, Zn, Cd, Cn, Hg, As, Total Cr, Pb During 24 ( Twenty Four ) Calendar Months. 14 Intake Water From River Bhagirathi 15 Environment Statement : Preparation Of Environment Statement As Per Guideline / Stipulationof Moef&Cc, Goi / Wbpcb Comprising All Above & Necessary Particulars During 24 ( Twenty Four ) Calendar Months. 16 Analysis Of Liquid Waste Water From Town: Analysis Of Liquid Waste Water From Township Disposal For Analyzing Following Parameters : Tss, Ph, O&G
Basic Detail
Tender No WBPDCL/SGTPP/NIT/E2004/22-23
Bidding Type Tender
Location
City sagardighi
State West Bengal
Key Dates
Publish Date 11 Oct 2022
Submission Date 05 Nov 2022
Open Date 09 Nov 2022
Finance
Tender Value 4.20 Lakhs
Tender Fee Ref. Documents
EMD 8405
Exemption Not Available
Document List
a099149b-89aa-4bf0-8391-e04cfc3e92f6.html
BangGuaranteeForm.pdf
BOQ_814143.xls
FinalTenderDoccompressed.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 11, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 05, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Nov 09, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

a099149b-89aa-4bf0-8391-e04cfc3e92f6.html

pdf

BangGuaranteeForm.pdf

xls

BOQ_814143.xls

pdf

FinalTenderDoccompressed.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender