Operation And Comprehensive Annual Maintenance Contract Of Substation No 3 , 4 And Residential Complex At Aiims Patna -Operation Of 2 X 2.5 Mva Transformer Substation I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Ca
Tender Overview
Project Description
Operation And Comprehensive Annual Maintenance Contract Of Substation No 3 , 4 And Residential Complex At Aiims Patna -Operation Of 2 X 2.5 Mva Transformer Substation I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Cable ( Including Cable Jointing & End Termination ) , Bus Duct, Plug In Box, Rising Main Etc As Reqd By Providing Necessary Engineer, Supervisor, Electrician , Helper Etc As Reqd.Site Engineer ( For Residential Campus Substation 3, 4 &4A ) 2 Operation Of 2 X 2.5 Mva Transformer Substation I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Cable ( Including Cable Jointing & End Termination ) , Bus Duct, Plug In Bix, Rising Main Etc As Reqd By Providing Necessary Engineer, Supervisor, Electrician , Helper Etc As Reqd.Electrician ( For Substation 3, 4 &4A ) 3 Operation Of 2 X 2.5 Mva Transformer Substation I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Cable ( Including Cable Jointing & End Termination ) , Bus Duct, Plug In Bix, Rising Main Etc As Reqd By Providing Necessary Engineer, Supervisor, Electrician , Helper Etc As Reqd.Semi Skilled Electrician ( For Substation 3, 4 &4 A ) 4 Comprehensive Maintenance Of 2X 2500 Kva Transformer Sub Station I / Croutine / Preventive / Breakdown Maintenance Of Follwing Equipments With Components, Equipments, T & P I / C Manpower / Labours / Electrician Etyc Involved In Maintenance Apart From Item No ( 1 ) Above For Substation ( 3 & 4 ) A ) 2.5 Mva Transformer ( 11 / 0.4Kv ) -2Nosb ) 11Kv Ht Breaker- 4Nosc ) 550Kvar Capacitor Panel -2Nos D ) Lt Panel ( Capacitor I / P & O / P, Lt Distribution Panel ) - 1 No E ) Bus Duct- Lump Sump F ) Ht / Lt Cable Network- ( Including Cable Jointing & End Termination ) G ) Rising Main ( Hospital Complex I.E Ipd, Trauma And Apmr ) -2000Mtrs ( Approximate ) H ) Plug In Box-200 Nos 5 Comprehensive Maintenance Of 2X 300 Kva Ups I / C Routine Maintenance Etc As Reqd ( Cost Of Replacement Of Battery Is Not The Part Of Amc ) For Substation ( 3 & 4 ) 6 Comprehensive Maintenance Of1250 Kva Transformer Sub Station I / Croutine / Preventive Maintenance Of Follwing Equipments With Components, Equipments, T & P I / C Manpower / Labours / Electrician Etc Involved In Maintenance Apart From Item No ( 1 ) Above For Substation ( 4A ) A ) 1250 Kva Transformer ( 11 / 0.4Kv ) -1Nob ) 11Kv Ht Breaker- 3Nosc ) 250Kvar Capacitor Panel -1Nos D ) Lt Panel ( Capacitor I / P & O / P, Lt Distribution Panel-2 ) - 1 No E ) Bus Duct- Lump Sump F ) Ht / Lt Cable Network- ( Including Cable Jointing & End Termination ) G ) Rising Main ( Hospital Complex I.E Opd ) -500Mtrs ( Approximate ) H ) Plug In Box-40 Nos 7 Operation Of 2X 750 Kva Transformer Sub-Station I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Cable ( Including Cable Jointing & End Termination ) , Bus Duct, Plug In Box, Rising Main Etc As Reqdby Providing Necessary Engineer, Electrician, Helper Etc As Reqd ( The Superviser Taken At Sr No 1 Above Will Supervised Both Substation ) Electrician ( For Residential Complex Substation ) 8 Operation Of 2X 750 Kva Transformer Sub-Station I / C All Accessories Like Ht Panel, Lt Panel, Capacitor Panel, Ups, Ht / Lt Cable ( Including Cable Jointing & End Termination ) , Bus Duct, Plug In Box, Rising Main Etc As Reqdby Providing Necessary Engineer, Electrician, Helper Etc As Reqd ( The Superviser Taken At Sr No 1 Above Will Supervised Both Substation ) Semi Skilled Electrician ( For Residential Complex Substation ) 9 Comprehensive Maintenance Of 2X750kva Transformer Sub Station I / Croutine / Preventive Maintenance Of Follwing Equipments With Components, Equipments, T & P I / C Manpower / Labours / Electrician Etyc Involved In Maintenance Apart From Item No ( 1 ) Above A ) 750 Kva Transformer ( 11 / 04Kv ) -2Nos B ) 750Kva Dea Set ( Only For Operation If Reqd ) C ) 11Kv Ht Breaker -3Nosd ) Capacitor Panel-2Nose ) Lt Panel ( Capacitor I / P & O / P, Lt Distribution Panel- 1No F ) Ht / Lt Cable Network ( Including Cable Jointing & End Termination )
BOQ
| Sl. No. | Item Description |
| 1 | Operation of 2 x 2.5 MVA transformer substation i/c all accessories like HT Panel, LT Panel, Capacitor panel, UPS, HT/LT Cable (including cable jointing & end termination), Bus duct, plug in box, rising main etc as reqd by providing necessary Engineer, supervisor, electrician , helper etc as reqd.Site Engineer (For residential campus substation 3, 4 &4A ) |
| 2 | Operation of 2 x 2.5 MVA transformer substation i/c all accessories like HT Panel, LT Panel, Capacitor panel, UPS, HT/LT Cable (including cable jointing & end termination), Bus duct, plug in bix, rising main etc as reqd by providing necessary Engineer, supervisor, electrician , helper etc as reqd.Electrician (For substation 3, 4 &4A) |
| 3 | Operation of 2 x 2.5 MVA transformer substation i/c all accessories like HT Panel, LT Panel, Capacitor panel, UPS, HT/LT Cable (including cable jointing & end termination), Bus duct, plug in bix, rising main etc as reqd by providing necessary Engineer, supervisor, electrician , helper etc as reqd.Semi skilled Electrician (For substation 3,4 &4 A) |
| 4 | Comprehensive maintenance of 2x 2500 KVA transformer sub station i/croutine/ preventive / breakdown maintenance of follwing equipments with components, equipments, T & P i/c manpower/ labours/electrician etyc involved in maintenance apart from item no ( 1 )above For Substation (3 & 4) a) 2.5 MVA transformer (11/0.4KV)-2nosb) 11KV HT Breaker- 4nosc) 550KVAR Capacitor panel -2nos d) LT Panel (Capacitor I/P & O/P, LT Distribution panel)- 1 no e) Bus Duct- Lump sump f) HT/LT cable network-( including cable jointing & end termination)g)Rising Main (Hospital complex i.e IPD,Trauma and APMR)-2000mtrs (Approximate)h) Plug in Box-200 nos |
| 5 | Comprehensive maintenance of 2x 300 KVA UPS i/c routine maintenance etc as reqd ( Cost of Replacement of battery is not the part of AMC) For Substation (3 & 4) |
| 6 | Comprehensive maintenance of1250 KVA transformer sub station i/croutine/preventive maintenance of follwing equipments with components, equipments, T & P i/c manpower/labours/electrician etc involved in maintenance apart from item no ( 1 )above For Substation (4A)a) 1250 KVA transformer (11/0.4KV)-1nob) 11KV HT Breaker- 3nosc) 250KVAR Capacitor panel -1nos d) LT Panel (Capacitor I/P & O/P, LT Distribution panel-2)- 1 no e) Bus Duct- Lump sump f) HT/LT cable network-( including cable jointing & end termination)g)Rising Main (Hospital complex i.e OPD )-500mtrs (approximate) h) Plug in Box-40 nos |
| 7 | Operation of 2x 750 KVA transformer sub-station i/c all accessories like HT Panel, LT Panel, capacitor panel, UPS, HT/LT cable (including cable jointing & end termination), Bus duct, plug in box, rising main etc as reqdby providing necessary Engineer, Electrician, helper etc as reqd (The superviser taken at sr no 1 above will supervised both substation)Electrician (For residential complex substation) |
| 8 | Operation of 2x 750 KVA transformer sub-station i/c all accessories like HT Panel, LT Panel, capacitor panel, UPS, HT/LT cable (including cable jointing & end termination), Bus duct, plug in box, rising main etc as reqdby providing necessary Engineer, Electrician, helper etc as reqd (The superviser taken at sr no 1 above will supervised both substation)Semi skilled Electrician (For residential complex substation) |
| 9 | Comprehensive maintenance of 2x750KVA transformer sub station i/croutine/preventive maintenance of follwing equipments with components, equipments, T & P i/c manpower/labours/electrician etyc involved in maintenance apart from item no ( 1 )above a) 750 KVA Transformer(11/04KV)-2nos b) 750KVA DEA set (only for operation if reqd)c) 11KV HT Breaker -3nosd) Capacitor Panel-2nose) LT Panel(Capacitor I/P & O/P, LT Distribution panel- 1no f) HT /LT Cable network (including cable jointing & end termination) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender