Uttarakhand Power Corporation Limited-UPCL has published Work For Releasing Of Ht And Lt New Service Connections In 33 / 11 Kv S / S Manpur And Pakkakot Under Edsd, Kashipur ( Town ) Under The Head Nsc ( Capital Plan ) .- 1 Decentralized Material 2 Supply Of Aluminum Crimping Lugs Of Size 25. Submission Date for this Tender is 22-11-2022. Road Work Tenders in kashipur Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 21-Oct-2022 | EXTENTION OF DATE | Date | 09-11-2022 |
2 | 09-Nov-2022 | DATE EXTENTION | Date | 22-11-2022 |
Sl. No. | Item Description |
1 | Decentralized Material |
2 | Supply of Aluminum Crimping Lugs of size 25 Sq.mm. |
3 | Supply of Aluminum Crimping Lugs of size 70 Sq.mm. |
4 | Supply of Aluminum Crimping Lugs of size 95 Sq.mm. |
5 | Supply of Aluminum Crimping Lugs of size 120 Sq.mm. |
6 | Supply of LT Clamp with N&B PCC Pole 8.5Mtr. Long (MS flat 50X6mm & 18m dia hole for 16x65mm nut & bolt as per RESPO Specification) |
7 | Supply of Stay Clamp with N&B PCC Pole 8.5Mtr.Long (MS flat 50X6mm & 18m dia hole for 16x65mm nut & bolt as per RESPO Specification) |
8 | Supply of Stay Clamp with N&B ST Pole SP-33 (MS flat 65X8mm) |
9 | Supply of Stay Clamp with N&B ST Pole SP-55 (MS flat 65X8mm) |
10 | Supply of LT Shackle Insulator with one nonut bolt 150x16mm made of best quality pore line and without defeets ISI standard as per UPCL specification. |
11 | Supply of Stay Insulator 90X65 mm. |
12 | Supply of Holding Clamp with N&B PCC Pole 8.5Mtr Long (MS flat 50X6mm & 18m dia hole for 16x65mm nut & bolt as per RESPO Specification) |
13 | Supply of all type PP & Clamp with nut & bolt ( as per RESPO Specification) |
14 | Supply of F-Clamp for 11KV PCC pole Line made of flat 65X6mm with N&B. |
15 | Supply of Dead End clamps with I-Hook. (As per Specification & Drawing of UPCL) |
16 | Supply of Suspension clamps with I-Hook. (As per Specification & Drawing of UPCL) |
17 | Holding Clamp for Dead End Clamp suitable for AB Cable (As per Specification & Drawing of UPCL) |
18 | Holding Clamp for Suspension Clamp suitable for AB Cable (As per Specification & Drawing of UPCL) |
19 | Supply of LT Insulated Pearcing Connector 120/95 to 120/95 mm. (For Line to Line) (As per Specification & Drawing of UPCL) |
20 | Supply of LT Insulated Pearcing Connector 120/95 to 25/15 mm. (For Line to Line) (As per Specification & Drawing of UPCL) |
21 | Supply of LT Insulated Pearcing Connector 25/15 to 25/15 mm. (For Line to Line) (As per Specification & Drawing of UPCL) |
22 | Supply of L.T. Bare Neutral Connectors PG clamp 95sq mm to 25 sq mm. (For Line to Line) (As per Specification & Drawing of UPCL) |
23 | Labour Charges |
24 | Cartage of ST pole and PCC Poles from store centre to construction site with loading, unloading at both points. (loading, unloading pluse carriage per pole) and proper stacking, Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends & Cartage of the following capacity transformers from store center to construction site with loading and unloading at both points. (Loading, unloading plus carriage of T/F)( 0-20 KM) |
25 | SP-21/23 |
26 | SP-33 |
27 | SP-55 |
28 | SP-72 |
29 | PCCPoles |
30 | Other material in weight |
31 | 25 KVA |
32 | 63 KVA |
33 | 100 KVA |
34 | 11KV VCB(I/c,O/g) bus cupler,Pannels |
35 | 33KV VCB,feeder Pannels(O/d),T/f Control pannel |
36 | 33/11 CT/PT /Isolator |
37 | Headload cartage of following Poles from road to site (Rates are per pole / KM ) & Headload cartage of Small material. Rates are per Km/Quintal including loadingand Unloading & Headload cartage/ manual shifting / lifting with crane/hydraof the following transformers along with loading/Unloading at both points (the rates are per transformer/Km). |
38 | SP-21/23 |
39 | SP-33 |
40 | SP-55 |
41 | SP-72 |
42 | PCCPoles |
43 | Small line material |
44 | 25 KVA Transformer 11/0.4KV |
45 | 63 KVA Transformer 11/0.4KV |
46 | 100 KVA Transformer 11/0.4KV |
47 | Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
48 | Erection of following Singlesupport polein proper level and alignmentas per RESSPO construction Manual. |
49 | SP-21 |
50 | PCC Pole |
51 | SP-23 |
52 | SP-33 |
53 | SP-55 |
54 | SP-72 |
55 | Erection of following Double support pole in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual. |
56 | PCCPole |
57 | SP-23 |
58 | SP-33 |
59 | SP-55 |
60 | SP-72 |
61 | Erection of following Four pole support in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual. |
62 | SP-23 |
63 | SP-33 (11KV/33KV) |
64 | SP-55 (11KV/33KV) |
65 | SP-72 (11KV/33KV) |
66 | Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. |
67 | Muffing of poles of size 45cm above ground level with CC ratio 1:4:8 (1 cement :4 graded stone 10mm nominal size : 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual. |
68 | Fabrication of M.S. Channel Angle iron after cutting in requiredsizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing. |
69 | Fixing of special type bracket |
70 | Fixing of D-type bracket in LT line |
71 | Fixing of triangular type bracket in 11 KVline |
72 | Fixing of triangular type bracket in 33 KVline |
73 | Excavation of earth for Stay pit of size 0.6x0.6x1.2mtrin all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work |
74 | Fixing , tightening and nozzaling of Stay with pole and stay rod on required tension as per drawing / RESSPO manual. |
75 | LT stay |
76 | 11 KV line |
77 | 33 KV line |
78 | Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size: 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual. |
79 | Earthing of LT/11 KV/ 33 KV support with M.S. Earth rod of 2.5 meter long by hammering of M.S. Rod to proper depth and connectingG.I. wire as per construction manual & Head of the earth rod should be 30cm below the ground level. |
80 | Laying, Spreading, Stringing and sagging of 11 KV / 33 KV line in 3 phase (3 Phase 4 wire) of the following wire as phase wire with G.I. earth wire complete including fixing of all accessories in 3 Nos. conductor in parallel with binding and jumpering as per profile and profile and sagging chart. |
81 | Weasel |
82 | ACSR Rabbit |
83 | Raccoon (L.L. 11 KV / 33 KV) |
84 | Dog (L.L. 11 KV / 33 KV) |
85 | Panther (33 KV line) |
86 | Laying, Spreading, Stringing and sagging of L.T. Lines of the following wire as phase wire with G.I. earth wire complete with binding and jumpering as per RESSPO Specn. |
87 | ACSR Weasel Conductor |
88 | 3 phase 5 wire length |
89 | 3 phase 4 wire length |
90 | 2 phase 3 wire length |
91 | 1 phase 2 wire length |
92 | ACSR Rabbit Conductor |
93 | 3 phase 5 wire length |
94 | 3 phase 4 wire length |
95 | 2 phase 3 wire length |
96 | 1 phase 2 wire length |
97 | ACSR Raccoon Conductor |
98 | 3 phase 5 wire length |
99 | 3 phase 4 wire length |
100 | 2 phase 3 wire length |
101 | 1 phase 2 wire length |
102 | ACSR Dog Conductor |
103 | 3 phase 5 wire length |
104 | 3 phase 4 wire length |
105 | 2 phase 3 wire length |
106 | 1 phase 2 wire length |
107 | Guarding of Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guarding channel/ angle as per RESSPO manual. L.T./11KV /33KV |
108 | L.T./11KV Line. |
109 | 33KV Line. |
110 | Laying and erection of L.T. PVC Cable including crimping of lugs of size 1x70,120, 150 Sq.mm. |
111 | Mounting & Fixing of TPMOon double pole structures including making of connections complete work |
112 | Mounting & Fixing of Fuse sets on double pole structures including making of connections complete work |
113 | Mounting and Fixing of Lightning arrestor set (3 Nos.) on double pole structure including making allconnections by G.I. strip size 35x6 mm to earth point complete work (excluding cost of G.I.Strip) |
114 | Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level. |
115 | ST Pole SP-55 |
116 | ST Pole SP-33 |
117 | ST Pole SP-23/21 |
118 | ST Pole SP-10 |
119 | ST Pole SP-72 |
120 | connection of existing service connections by Loop jumpering on main line through catenary wire 12 SWG and eye rag bolt at consumer premisse including supply of catenary wire and eye rag bolt in size 150x12 mm as per RESSPO schedule. |
121 | Jointing and Fixing of cable jointing Kits indoor /outdoor cable boxes. |
122 | 11 KV XLPEheat shrinkable |
123 | 33 KV XLPEheat shrinkable |
124 | Straight through 11 KV XLPE |
125 | Straight through 33 KV XLPE |
126 | Dismantling of TPMO /fuse set on double pole structure. |
127 | Dismantling of existing Transformeretc. including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections including cartage back from site to JE store |
128 | 100 KVA |
129 | 63 KVA |
130 | 25 KVA |
131 | Installation / mounting of new Tranformer on doublepole structure and fixing of channel / angle etc. and making all connections of Ht and LT side and its complete commissioning. |
132 | 100 KVA |
133 | 63 KVA |
134 | 25 KVA |
135 | Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line. |
136 | T-off Connection Complete 11 KV |
137 | T-off Connection Complete 33 KV |
138 | Providing and fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11""x7"" size (Including cost of all material) |
139 | Laying ofLT serviceCable From Pole to consumer end meter alongwith supporting GI wire |
140 | Digging of trench of size 0.60x0.15 x 0.9 mtr. and laying of undergroundLT cable with makingof brick housing and filling of sand including filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast |
141 | Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground11 KV XLPE cable with makingof brick housing and filling of sand including filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast |
142 | Digging of trench of size 0.60x0.15 x 1.5 mtr. and laying of underground33 KV XLPE cable with makingof brick housing and filling of sand including filling of earth with ramming. & repairing of road includingcost of cement sand and stone blast |
143 | Re- alignement of TPMO on existing Double polewith digging of pit and fixing of TPMO on the double pole with smooth operating including making of gung and jumper with binding kit. |
144 | Making of section pole for existing LT/HT/33KV line complete in all respect. |
145 | Installation of 33/11 KV Metering cubical in the Metering room with groutingand making all connection |
146 | Fixing of GI pipe complete. |
147 | Fixing of RCC cable route marker Including cost material |
148 | Laying, sagging & binding of AB cable LT line complete. |
149 | LT AB Cable 3x120+1x95 sq mm |
150 | LT AB Cable 3x95+1x70 sq mm |
151 | LT AB Cable 3x25/15+1x25 sq mm |
152 | Laying, sagging & binding of AB cable HT line complete. |
153 | Loading, unloading & carriage of LT PRMC from Store to pit site & Installation on the double pole with the help of Nut Bolt & Clamp and making to pass LT cable from T/F to PRMC. |
154 | Construction of Metering room for Metering Cubical at S/s endIncluding cost ofbuilding /materialand it also include the cost of gate etc.Of 10 feet height |
155 | Layingof LT CableinHalf circleHume pipe of Dia 150 mm including cost of hume pipe in depth 0.9 meter |
156 | Layingof 11 KVCableinHalf circleHume pipe of Dia 150 mm including cost of hume pipe in depth 1.5 meter |
157 | Layingof 33 KV CableinHalf circleHume pipe of Dia 150 mm including cost of hume pipe in depth 1.5 meter |
158 | Mannual shifting /Pulling from existing site to plinth/ nearby place distance upto 200 mtrs. |
159 | Control Realy Panel for Single T/F/ Single Feeder |
160 | 11 KV VCB FDR 350 MVA / 500 MVA, 400/200/5A/110 V AC |
161 | 33 KV VACCUMECIRCUIT Breaker |
162 | 33 KV outdoor CT/PT |
163 | 33 KV Isolator Line/Bus |
164 | 33 KV CT-PT combined Unit off sizes |
165 | 11 KV CT-PT combined Unit off sizes |
166 | Fabrication & erection Bus Isolator / Line Isolator / LA / CT / PT/ Fuse set |
167 | Fabrication charges |
168 | Excavation of earth for erection of structure (2x1.1x0.3x0.3) |
169 | Grouting of structure in CC 1:3:6 in size (2x1.1x0.3x0.3) mtr. |
170 | Erection charges of structure |
171 | Installation of 33 KV CT with all connections |
172 | Erection of 11 KV VCB (O/G or B/C orI/C ) Panel in all respect, making connection, testing etcin all respect aterection site |
173 | Erection of 33 KV control panel( feeder /transformer )in all respect, making connection complete including testing and commissioning. |
174 | Erection of 33 KV VACCUM CIRCUIT Breaker in all respect, making connection including testing and commissioning. |
175 | Painting of Isolator / LA/CT/Structure complete |
176 | Fixing of Stay Clamps for PCC Pole. |
177 | Fixing of Special type Holding clamps for J/Eye Hook. |
178 | Laying of 11KV Cable in 1.5 mtr depth with suitable trencheless technology including laying in trench with providing & fixing of HDPE pipe PE 80 PN 6 & having dia 160 mm confermingto IS 4984/1995 & having thickness 9.1 to 10.3mm. |
179 | Laying of 33 KV Cable in 1.5 mtr depth with suitable trencheless technology including laying in trench with providing & fixing of HDPE pipe PE 80PN6 & having dia 160confermingto IS 4984/1995 & having thickness 9.1 to 10.3mm. |
180 | Replacement of 3 nos. 11 KV CT inside the 11 KV metering cubicle including cleaning of metering cubicle |
181 | Replacement of 3 nos. 33 KV CT inside the 33KV metering cubicle including cleaning of metering cubicle |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail