Department Of Labor And Employment has published Bids Are Invited For Fire Equipment Boq Pipes Mild Steel Pipes And Accessories , Heavy Duty Industrial Pvc Pipe And Accessories , 2 Zone Fire Alarm Panel , Fire Alarm Hooter , Gun Metal 2 Way Fire Brigade , Pressure Guage , Butterfly Valve , Ci Wafer. Submission Date for this Tender is 17-10-2022. Packaging Tubes and Label Tenders in Surat Gujarat. Bidders can get complete Tender details and download the document.
Sl. No. | Item Title | Item Description |
1 | PIPESMild Steel Pipes and accessories | Mild Steel Pipes Confirming to IS-1239 Part – I Class – C, Heavy duty with double coat corrosion protection zinc coating paint on the pipe line.size 80 NB (As per NBC) |
2 | Heavy duty industrial PVC Pipe and accessories | Heavy duty industrial PVC Pipes (Formally designated as type-I, Grade I)with ISI marked, with bends, T, Elbows, Auto stop valve, with ISI marked fittings (PVC Cell classification 12454-B of ASTIM-D1784) size 1 inch (As per NBC) |
3 | 2 ZONE FIRE ALARM PANEL | ISI (As per NBC) |
4 | FIRE ALARM HOOTER | HOOTER (As per NBC) |
5 | Gun Metal 2 Way FIRE BRIGADE | Gun Metal 2 Way FIRE BRIGADE Inlet Heavy dutysize 63MM (As per NBC) |
6 | Pressure guage | Heavy Duty Pressure guage SS Body heavy duty glycerine filled bottom Conn. (3/8 BSP)4 inch dia X 17.5Kg. (As per NBC) |
7 | Butterfly Valve | Heavy Duty Cast Iron Butterfly Valve With DI Disc & Nitrite Rubber Lining With ISI Mark. Size- 3 Inch (As per NBC) |
8 | CI Wafer type NRV | Heavy Duty CI Wafer type NRV Valson Make. Size- 3 Inch(As per NBC) |
9 | Brass Ball Valve | Heavy Duty Brass Ball Valve with brass ball and teflon ring Size-1 Inch (As per NBC) |
10 | MANUAL CALL POINT SYSTEM | MANUAL CALL POINT SYSTEM (As per NBC) |
11 | Panel | Heavy Duty Pump Starter , Electrical wiring of Pump & Panel , Connectionwith Labour charges and provide shade for protection from weather (As per NBC) |
12 | Pressure switch | Pressure switch for automatic operation of the pump.(As per NBC) |
13 | Fire Pump | 7.5 HP Fire Pump for 7.5 HP 3 Phase open well horizontal mono block pump set suitable for 450 LPM at 13.5 Mtr. To 32 Mtr. Head suitable for delivery pipe Cat.II with fitting charges.(As per NBC)provide shade for protection from weather |
14 | Hose Reel 30 meter and accessories | Hose Reel 30 meter supply, fixing, testing And commissioning of 20 mm bore and 30 meter long hose (high pressure rubber braided hose pipe as per IS-444) and hose reel suitable for 10 Kg per sq cm operating pressure for first aid fire fighting conforming to IS-884, with 180 deg full swing drum, fixing brackets, 5mm dia shut off Stainless steel nozzle, connecting directly from the riser through 40mm dia. MS (Class B) pipe with sockets, elbows, nipples, 40x20 mm reducer, 20 dia pipe, 20 mm dia hand lever operated isolating ball valve etc., including providing operating instructions near hose reel. The system shall be complete in all respects as per drawings and directions of Engineer-in-charge (As per NBC) |
15 | ALL ASSESSORIES REQUIRED FOR INSTALLATION,FIXING AND COMMISSION OF HOSE REEL AND FIRE PUMP SYSTEM | FIXING AND COMMISSION OF HOSE REEL AND FIRE PUMP SYSTEM (ACEESSORIES LIKE ELBOW,CORE CUTTING SWITCH, CABLES, ALL TYPES OF VALVES, NRV, REDUCERS ETC.) |
16 | INSTALLATION AND COMMISSIONING CHARGES OF TOTAL FIRE SYSTEM | Erection & Commissioning As per NBC with electrical wiring connection Foundation, civil workwith require materialsand labour charges for 1) Fire Pump 2) Electrical Pannel 3) M.S.Pipe fitting including flanges, cutting, bewelling welding, brnding, threading, painting with red oxide and red anemel4) Hose Reel and Hose assembly 5) UPVC pipe connection etc. |
17 | INSTALLATION AND COMMISSIONINGOF ALREADY INSTALLFIRE EXTENGUISHER | FIXED and already installed 15 fire extinguishers refilling and commissioning and checking or replacing |
18 | INSTALLATION AND COMMISSIONINGOF NEW FIRE EXTENGUISHER | NEW fire extinguishers (6- Co2 and 6 - ABC) |
19 | INSTALLATION AND COMMISSIONINGOF NEW FIRE EXTENGUISHER | fire extinguishers refilling and commissioning (Water Type-1,ABC-4,Co2-6,Self-activated-12) |
20 | PROCEDURE FOR FIRE NOC | APPLICABLE ALL CHARGES AND DOCUMENTATION CONSULTING |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail