| 1 | Rates for Augmentation of “SIRI” Water Supply Scheme Under Jal Jeevan Mission In Block DUNDA of District Uttarkashi |
| 2 | ConstructingofSCPC drain masonryi/c all types of material, labour, T&P etc. complete |
| 3 | supply and fixing of theSteel Itake Chamberincluding cartage of materials,labours ,T.&P. etc. complete. |
| 4 | Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of verticalpipes and specials, assuming bearing capacity as 8MT/M2 .10.00 KL |
| 5 | 15.00 KL |
| 6 | 50.00 KL |
| 7 | Supply and fixing ofBucket type chlorinator of 25 Liter capacity at top of all service reservoirs. |
| 8 | Dismantling of bridle c.c path inside the village and streat including disposal as per requirement in direction of engneer-in-charge |
| 9 | Providing of all materials, carting from site store to site of work, laying & jointing of G.I. Medium screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.G.I. Medium quality15mm dia |
| 10 | 20mm dia |
| 11 | 25mm dia |
| 12 | 32mm dia |
| 13 | 40mm dia |
| 14 | 50mm dia |
| 15 | Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m but excluding the cost of earth work15mm dia |
| 16 | 20mm dia |
| 17 | 25mm dia |
| 18 | 32mm dia |
| 19 | 40mm dia |
| 20 | 50mm dia |
| 21 | Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90% pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rockSoil mixed with boulder and bajri |
| 22 | Soft rock |
| 23 | Relaying of dismantled G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. complete.15mm dia |
| 24 | 20mm dia |
| 25 | 25mm dia |
| 26 | 32mm dia |
| 27 | 40mm dia |
| 28 | 50mm dia. |
| 29 | Supply and fixing of the following fittings including cartage of materials,labours ,T.&P. etc. completeGate valves/Sluice valves (Class-I)as per I S 788/199732mm dia |
| 30 | 40mm dia |
| 31 | 50mm dia |
| 32 | Supply of all materials,labours ,T.&P. etc.and construct Wheel valve chamber as per type designcomplete |
| 33 | Excavation in ordinary soil mixed with shingle, boulder requiring special T&P like pickaxe, crowbar etc. for foundation including lift upto 1.5 m. and Lead upto 30 m. Including refilling, watering, ramming of excavated earth into the trenches or space between the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth upto a distance of 60 m. from trenches nearby sources, along the pipe line and around the C.W.R. |
| 34 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level1:4:8(1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). |
| 35 | RR stone masonary with 1:6 cement and sand mortar nearby sources and along the pipe line for proper completion of work. |
| 36 | RR stone masonary laid in dry for proper completion of work along the pipe line. |