|
| 1 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Prefilling Machine suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 2 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Filling Machine suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 3 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Electronic Check Sacle with CVT suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 4 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Dip type Test Bath suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 5 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Lowering platform suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 6 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Cylinder trolley suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 7 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER\"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Roller Conveyor Section suitable for 47.5 kg net weight LPG Cylinder filling facility. |
| 8 | Transportation Charges |
| 9 | Third Party Inspection Charges |
| 10 | GST @ 18% |