Environment and Forests Government Departments Closing in 0 days TDR #34200086

Construction Of Forester Quarter At Nalda Section Of Barbil Range

Issued by Government Departments · barbil, Odisha
Tender Value
Ref. Documents
Estimated cost
Bid Submission
17 Oct 2022
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
barbil → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Forester Quarter At Nalda Section Of Barbil Range

BOQ

Name of Work: CONSTRUCTION WORK OF FORESTER QUARTER AT NALDA SECTION OF BARBIL RANGE
Sl. No. Item Description
1Earth workin excavation of foundation in hard soil or gravelly soil including dressing and leveling the bedand disposal of the excavated materials within initial leads and lifts as per direction of E.I.C.
2Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes,T&P etc complete.
3Cement Concrete (1:3:6) using 40mmsize hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C.
4Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Foundation and plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
5R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete. A. Footing Base
6B. Column Shaft (G. Floor)
7C. Plinth Beam (G. Floor)
8D. Lintel (G. Floor)
9E. Chajja (G. Floor)
10F. Roof Beam (G. Floor)
11G. Roof Slab (G. Floor)
12H. Shelves (G. Floor)
13Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete.
14Brick work with Fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:6) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
15Brick work withFly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:4) in Super Structure including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of Engg-in -charge.
1612mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
1716mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
186 mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slury treatment , watering, curing cost, carriage, royalty, and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C.
19Fixing tiles (Vetrified tiles 600mm x 600mm) in floors treads or steps and landing on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 sand) jointed with neatcement slury mixed with pigment to match the shades of the tiles includingrubing and polishing with cost,coveyance of all materials etc. complete.
20Dressed seasoned sal wood (50mm. to 150mm. & upto 2.75m. long.) work framed and fixed (wrought and put up) in trusses, purlins, frames of doors, windows, ventilators and beams
2132mm piasal wood or local Teak wood panelled shutters moulded panels with all labour, iron fittings, and wooden hinged cleats etc fitted and fixed complete in all respect. But excluding the cost of iron fittings
22Supplying of M.S. Door, Window with grills, Grills, collapsible gates made out of M.S. Angle frame, M.S. Flat, Sheetetc of approved section & design, electrically welded properly with all necessary locking arrengement, and 1 coat red oxide primer including cost of all materials, labour T&P, carriage of materials to site etc. complete.
23Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge.
24Painting two coats with approved enamel paints of approved colour, shade over a coat ofprimer including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge.
25Finishing wall surface with Cement based wall putty (water based) of approved make and finished smooth & even surface to receive painting including cost of scaffolding etc. with cost of all materials, labour T&P etc. complete.
26Wall painting 2 coats with plastic emulsion paint over a coat of primer of approved shade on new work to give an even shade including cost of paint etc complete.
27Finishingto the exposed surfacesof wallwith weathercoat of anyapproved shadeon newwork 2 coats over a coat of wallprimer to give aneven shadeincludingcost of weathercoat all costof all laboursand T&Petc. complete .
2825mm thick CC 1:2:2 with 6mm size CB chips for grading concret over roof slab etc. complete.

AI Tender Summary

OUR REF NO 34200086
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 17-10-2022
Authority
Authority Name Forest And Environment Department
Work Description Construction Of Forester Quarter At Nalda Section Of Barbil Range
Basic Detail
Tender No FE_CC-DFO_T_KJR-01_2022-23
Bidding Type Tender
Location
City barbil
State Odisha
Key Dates
Publish Date 01 Oct 2022
Submission Date 17 Oct 2022
Open Date 18 Oct 2022
Finance
Tender Value Ref. Documents
Tender Fee 6000
EMD Ref. Documents
Exemption Not Available
Document List
c9f01cd7-0afe-4374-9bb8-c54513346ac1.html
BOQ_412266.xls
dtcnnalda.pdf
Tendernotice_1.pdf
TENDER_NOTICE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 17, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 18, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

c9f01cd7-0afe-4374-9bb8-c54513346ac1.html

xls

BOQ_412266.xls

pdf

dtcnnalda.pdf

pdf

Tendernotice_1.pdf

pdf

TENDER_NOTICE.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders