Construction Maintenance And Handing Over To Maintenance Body Of Uprauli Solar Pumping Water Supply Scheme Of Block Kalsi
Tender Value
66 Lakhs
Estimated cost
Bid Submission
20 Oct 2022
0 days left
EMD
1.32 Lakhs
Bank guarantee accepted
Document Fee
4720
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kalsi → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Maintenance And Handing Over To Maintenance Body Of Uprauli Solar Pumping Water Supply Scheme Of Block Kalsi
BOQ
| Sl. No. | Item Description |
| 1 | Supply of all materials, labour T & P etc. and equipments to construction of Spring Collecting Intake Chamber Cum Roughening Filter of 0.60Mx0.60Mx0.75M size double chamber as per type design. |
| 2 | Checking of Survey, Design the Supply Main and Distribution System of G.I. (Medium Quality) pipes by screw socketed joint conforming to IS:1239(Part-1) supply of pipes, carting, laying & jointing in the trenches to the specified depth including other appurtenant works such as fixing of air valve, sluice valve, reflux valve at suitable points including making of scouring arrangement at suitable locations by fixing of tee connection & gate valve etc. complete and also testing & commissioning of laid pipeline including supply and carting of all materials, labour, T&P etc. complete of following sizes. |
| 3 | 65 mm |
| 4 | 50 mm |
| 5 | 40 mm |
| 6 | 32 mm |
| 7 | 25 mm |
| 8 | 20 mm |
| 9 | 15 mm (For Connection) |
| 10 | Providing of all materials, Supply and Carting , lowering into trenches with true to alignment, Laying of MS ERWPipes grade Yst 210, Jointingby electric welding process with proper grade ofeletrodes suitable for jointing of water supply pipe lines (Ador,L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete. (40 mm dia,4mm thick) |
| 11 | 65mm dia , 4.40 mm thick |
| 12 | Excavation of earth for Pipe Line trenches of supply main in the following strata requiring the use of special T&P such as Pick Axes, Sabbals etc. or by controlled blasting or by crow bars with a lift up to 1.5 m and lead up to 30 m including refilling, watering and ramming of excavated earth into the trenches and removal and disposal of surplus earth to the suitable place from the trenches including supply of all materials, labour, T&P etc. complete & also it is estimated that 75% trenches will be in soil mixed with shingle, bazri, boulder and rest of 25% will be in medium rock. |
| 13 | Soil mixed with boulder with bazri |
| 14 | Medium Rock |
| 15 | Design and Drawing, Excavation, testing bearing capacity of soil and construction of R.C.C. (1:1.5:3) semi sunk circular service water reservoir withfixing of bucket type chlorinator at topof following capacity and other appurtenant works including supply of necessary scaffolding, shuttering and other accessories along with construction of valve chambers, fixing of inlet and outlet pipes, making bye pass arrangement,M.S.Ladder(inside & outside)& M.S. Manhole as per approved design of R.C.C. tank in latest IS codes including colour washing of approved class apex paintalong with carting and supply of all materials, labour, T&P etc. complete. |
| 16 | 5.00KL |
| 17 | 27.50KL |
| 18 | 35.00KL |
| 19 | Supply of all materials, labour T & P etc. and equipments to construction of RCC Chlorinating Chamber(Bucket Type) complete as per type design includinginstallation of25.00Litre capacity bucket typeChlorinator. |
| 20 | Supply and fixing of following size of Wheel / Sluice Valve for Rising Main / Supply Main as per BS or as per IS 778:1997 including cartage of materials (as per design). |
| 21 | 65 mm |
| 22 | 32 mm |
| 23 | 25 mm |
| 24 | Construction of following Valve chamber in stone masonary/ R.C.C. 1:1.5:3 along with fixing of manhole cover on top including supply of all materials, labour, T&P etc. complete required for proper completion of work. |
| 25 | Sluice/ Wheel Valve Chamber (Size 0.60 m x0.60 m x 0.75 m) |
| 26 | Supply of all materials, Labour, T&p, etc. to provide Function Households Tap Connections to all households including making connections and cartage of materials |
| 27 | Provision for Cutting of road surface for laying of pipe line including supply of all material, labour, T&P etc. complete .average width 70 cm. |
| 28 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of surplus dismantled materials upto a lead of 60 m, stacking serviceable and unserviceable materials separately |
| 29 | Re Instatement/making in good the Dismantled Road including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour, T&p, etc. required(As per PWD Specification) |
| 30 | Protection works for Site Development, Source work, Supply/ Feeder Main, Clear Water Reservoir, Staff Quarter,Service Reservoir etc. as per site conditions wherever necessary as follows |
| 31 | P.C.C 1:4:8 with cement and sand , 40mm stone grit including supply all material, labour T&P etc.complete. |
| 32 | P.C.C 1:2:4 with cement and sand , 40mm stone grit including supply all material, labour T&P etc.complete. |
| 33 | R.C.C 1:1.5:3 with cement and sand , 20mm stone grit including necessary shutering , supply of all material, labour T&P etc.complete. |
| 34 | Supply of all materials, Labour, T&p, etc. to provide M.S.TMT bar including bending, binding ,cuttingand cartage etc all complete. |
| 35 | Random Rubble stone masonary in 1:6 cement and sand mortar including supply of all materials, labour, T&P etc. complete. |
| 36 | Random Rubble stone masonry laid dry including supply of all materials, labour, T&P etc. complete. |
AI Tender Summary
Tender Timeline
Oct 01, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedOct 20, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 21, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer