Establishment E-Library In Existing Building Of Panchayat Ghar . Village.-Khai Shergarh -S / E Of45 Wattledstreet Light Fitting ( Philips / Bajaj / Crompton / Wipro / Ge / Havells ) Make Including Making Necessary Connetion 3 S / E Of36 Watt Led 6
Tender Overview
Project Description
Establishment E-Library In Existing Building Of Panchayat Ghar . Village.-Khai Shergarh -S / E Of45 Wattledstreet Light Fitting ( Philips / Bajaj / Crompton / Wipro / Ge / Havells ) Make Including Making Necessary Connetion 3 S / E Of36 Watt Led 600 X 600 Mm Surface Pannel Light Fitting ( Philips / Bajaj / Crompton / Wipro / Ge / Havells ) Make Including All Patty Material Required To Complete The Job In All Respect 4 S / E Of 2 Ton Split Ac Daikin / O General / Mitsubishi ) Including Cost Of M.S Stand, Stablizer And 9 Ft Copper Pipe. 5 S / E Of 20 Watt Led Street Light Fitting ( Philips / Bajaj / Crompton / Wipro / Ge / Havells ) Make Including All Patty Material Required To Complete The Job In All Respect
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 08-Oct-2022 | Date Extend | Date | 14-Oct-2022 |
| 2 | 14-Oct-2022 | Dateextend | Date | 21-Oct-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | NS Itmes |
| 2 | S/E of45 wattLEDstreet light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells)make including making necessary connetion |
| 3 | S/E of36 watt LED 600 x 600 mm surface pannel light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells) make including all patty material required to complete the job in all respect |
| 4 | S/E of 2 ton split AC Daikin/ O general/ Mitsubishi) including cost of M.S stand, Stablizer and 9 ft copper pipe. |
| 5 | S/E of 20 watt LED street light fitting (Philips/ Bajaj/ Crompton/ Wipro/ GE/ Havells) make including all patty material required to complete the job in all respect |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender