Work Diversion Of 220Kv Sarnath-Sahupuri Sc Line Between Tower No. 33 To 37 Due To Infringing In R.O.W. Of Nhai (Ring Road Phase-Ii) Under Etd-Ghazipur, varanasi-Uttar Pradesh

Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Work Diversion Of 220Kv Sarnath-Sahupuri Sc Line Between Tower No. 33 To 37 Due To Infringing In R.O.W. Of Nhai (Ring Road Phase-Ii) Under Etd-Ghazipur. Submission Date for this Tender is 06-10-2022. Transmission Line Tenders in varanasi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

34159884
Work Diversion Of 220Kv Sarnath-Sahupuri Sc Line Between Tower No. 33 To 37 Due To Infringing In R.O.W. Of Nhai (Ring Road Phase-Ii) Under Etd-Ghazipur
Open Tender
Indian
Uttar Pradesh
varanasi
06-10-2022

Tender Details

Work Diversion Of 220Kv Sarnath-Sahupuri Sc Line Between Tower No. 33 To 37 Due To Infringing In R.O.W. Of Nhai (Ring Road Phase-Ii) Under Etd-Ghazipur

Key Value

Document Fees
INR 5664 /-
EMD
INR 48000.0 /-
Tender Value
INR 47.38 Lakhs /-

BOQ Items

Name of Work:DIVERSION OF 1.40 KM. 220 KV SARNATH-SAHUPURI S/C LINE BETWEEN TOWER NO. 33 TO 37 DUE TO INFRINGING IN R.O.W. OF NHAI (RING ROAD PHASE-II) UNDER ETD-GHAZIPUR
Sl. No. Item Description
1PART-(A) SUPPLY
2Accessories for Tower
3Number plate
4Danger plate
5Phase plate (Set of three)
6Materials for pipe type earthing
7Accessories for ACSR Moose Conductor
8Twin Spacer Vibration Damper
9Mid span compresson joint
10Repair sleeve
11Accessories for Hardware & insulator
12Single tension fitting of Zebra conductor with complete set.
13Double tension fitting of Zebra conductor with comlete set.
14160 KN Composit polymer rubber insulator for 220 KV line.
15OPGW
1624 Fiber (DWSM) OPGW Fiber Optic Cable
17Supply & Installation of Hardware set for 24 Fiber OPGW
18Joint box (24 Fiber)
19PART-(B)WORK
20Detail survey & profilling
21Check survey & peg marking
22Cost of excavation of 220 KV tower foundation pits including all earth work, back filling, leveling etc.
23Setting of Stub including all foundation work but excluding the cost of concreting and excavation for following 220 KV D/C tower.
24C-TYPE
25Cost of concreting for all type of 220 KV D/C tower foundation including cost of cement, dewatering, shoring and shuttering, curing but excluding cost of reinforcement bars Twith 1:2:4 concrete.
26RCC
27Erection of superstructure of 220 KV C-type tower and their extention wherever required including all works above ground level excluding hoisting of insulator, hardware & accessories but including fitting of danger plate, phase plate, and bird guard, fixing & punching. (The contractor will be Iprovide 02 No"s erection gang at least on site )
28Tack welding of all the bolts up to height one section of the tower or 5 meter from the ground level whicheveris higher with three tacks at 120 separation of minimum 10mm thickness with 10mm/12mm electrode and application of zinc alluminium paints on the affected surface including cost of all materials.
29Laying, stringing, tensioninig, clamping, jointing etc of ACSR Zebra conductor including making jumper, hoisting of insulator, fitting of all necessary hardware and accessories i.e. fitting of armour rods, vibration dampers etc. on all three phases of 220 KV SC lines.(The contractor will be provide 02 No"s stringing gang at least on site.)
30Laying Stringing tensioning clamping, jointing etc. of ground wires /OPGW including fitting of all necessary hardware and accessories for complete route Km. for 220 KV line
31One No Optical fibre (OPGW) Stringing of OPGW shalll also be inclusive of installation of joint Boxes, Jointing & Splicing work its entire associated work
32Ground work including earth work etc for pipe type earthing including cost of coke and salt.
33Installation of reinforcement bars in RCC foundationincluding cost of steel reinforcement bars with cutting, bending, placing, binding etc.
34De-stringing or all three phase conductor, de-hoisting of insulator, rolling of dismantaled conductor and all associated work.
35De-stringing of 24 core OPGW, rolling of dismentaled OPGWand all associated work.
36Dismentaling, counting, stacking of existing 220 KV S/C tower and all other associated work.
37Shifting, counting, stacking & loading of line materials like 220 KV D/C tower parts, conductor, fittings etc from 400 KV S/S Sarnath/220 KV S/S Sahupuri store Varanasi to diversion point of above line and unloading, stacking of line materials and other all associated work including cost of labour and T&P charges. (Distance approx 50 Km.)
38Transpotation of all Dismantaled materials including shifting up to loading point, loading into vehicle, transpotation & unloading at 440 KV S/S Sarnath/220KV Sahupuri store Varanasi. (Distance approx 50 Km.)
39Shorting, counting, stacking, shifting & loading of220 KV C-type Stub & Templete approx. weight 4.80 MTinto light/heavy vehicle at EFU Naini Allahabad and transpotation from EFU Naini allahabad to 400 KV S/S Sarnath/220 KV S/S Sahupuri line store Varanasi approx. distance 190 Km. Then unloading, shifting, stacking markwise at line store varanasi including cost of labour and T&P charges.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail