| 1 | Work item |
| 2 | Excavation ofpole upto 8.00m length by using JCB/Manual |
| 3 | Excavation of pole above 8.00m length by using JCB/Manual |
| 4 | Excavation of Stay pit of 4.5 \" to 5 \"depth using JCB / Manual |
| 5 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 6 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 7 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 8 | Fixing of V cross arm4.5 feet |
| 9 | Fixing of LT 3 phase cross arm |
| 10 | Fixing of HT / LT Ti fitting |
| 11 | Fixing of HT PIN insulator with Pin 22 kv |
| 12 | Fixing of LT PIN insulator |
| 13 | Fixing of HT strain disc 22 KV |
| 14 | Fixing of shackle |
| 15 | Fixing of Aluminium knob |
| 16 | Paving and stringing of conductors ofabove7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
| 17 | Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. |
| 18 | Erection of Distribution Transformer Above 25 KVA to 100 KVA including loading of Distribution Transformer at stores and erection at structure or vice versa. |
| 19 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeveconcreting |
| 20 | stay concerting including materials |
| 21 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 22 | Loading of Line materials |
| 23 | Loading of Line materials |
| 24 | Loading of Distribution Transformer Upto 100 KVA |
| 25 | Unloading of Distribution Transformer Upto 100 KVA |
| 26 | Loading of REC, RCC, PSC pole upto 8.00 m length of various sizes of poles |
| 27 | Loading of REC, RCC, PSC pole above 8.00 m length of various sizes of poles |
| 28 | UnLoading of REC, RCC, PSC pole upto 8.00 m lengthof various sizes of poles |
| 29 | UnLoading of REC, RCC, PSC pole above 8.00 m length of various sizes of poles |
| 30 | Loading of Conductor |
| 31 | Unloading of Conductor |
| 32 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 33 | Transportation of all type of poles by bullock cart or other vehicle (Store to Section Above 10 KM) |
| 34 | Transportation of all type of poles by bullock cart or other vehicle (Store to SectionWithin 10 KM) |
| 35 | Transporting of conductors of all sizes from Store to section upto one KM of Conductor |
| 36 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 37 | Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) from Store to section(30 KMS) |
| 38 | Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) from Section to DT Structure |