Annual Contract For Plant Maintenance Jobs
Tender Value
Ref. Documents
Estimated cost
Bid Submission
12 Oct 2022
0 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
tandur → Telangana
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Annual Contract For Plant Maintenance Jobs
BOQ
| Sl. No. | Item Description |
| 1 | General and Routine jobs of Kiln and Preheater section equipments including shift operation on round the clock basis. Refer detail quantity given in scope of work Part - III of clause no -1 to 5 of part - A and Part - B 6 to 33 |
| 2 | Kiln equipment lubrication and greasing (i.e. tyre - 3nos, support roller - 6 nos, thrust roller -01 no & girth gear with pinion dipped lubrication - 01 set, nose ring fan -2 nos, preduster flaps -1 nos etc.), minimum quantity per day - 14 Nos per day |
| 3 | Temperature readings of support roller, kiln shell radiation and girth gear |
| 4 | Cooler equipment lubrication and greasing (i.e. cooler cross head bearing both sides- 8Nos, grate drive chains -3nos, guide sprocket -3nos, Clinker breaker - 1nos, Preheater area Belt bucket elevator-1Nos, Kiln feed bucket elevator -1 nos, weigh feeder -1nos etc.)Total equipment 18nos per day) minimum quantity per day - 18 Nos |
| 5 | Shifting of materials (i.e cylinders. Plates, equipment spares, lubricants) Material Less than 2MT |
| 6 | Stores to workplace ( Ground floor) |
| 7 | Ground floor to 30 Mtrs |
| 8 | Preheater equipment checking i.e. servicing of air blaster and flapper valves (Air blasters - 30 Nos, Flapper valves - 15 Nos, ) Minimium Qty 6nos airblaster servicing & 2NosFlap servicing. Total air blaster 6nos per day and flap valaves 2nos per day ,minimum quantity per day - 8 Nos |
| 9 | General and Routine maintenance of Coal mill section equipments including shift operation on round the clock basis. |
| 10 | Raw coal hopper feeding from reclaimer to raw coal hopper |
| 11 | Shifting of materials (i.e cylinders. Plates, equipment spares, lubricants) Material Less than 2MT |
| 12 | Stores to workplace ( Ground floor) |
| 13 | Ground floor to 30 Mtrs |
| 14 | Coal mill equipment lubrication and greasing (i.e. FK pump -2 nos, best o feeder - 2nos,ESP screw conveyor -2 nos ESP RAL -1 nos, Cyclone RAL -6Nos,fine coal hopper top screw - 2nos, coal mill fan 1 & 2 -2nos, weigh feeder - 2nos etc.) minimum quantity per day - 03 Nos |
| 15 | General and Routine maintenance of LS Crusher, Raw Mill section equipments including shift operation on round the clock basis. |
| 16 | Feeding of Limestone crusher to reclaimer stack pile |
| 17 | Raw mill equipment lubrication and greasing and checking and replacement (i.e. reclaimer 1 & 2 - 2 nos, belt conveyor - 07 nos, weigh feedres - 03 nos, PJBF RAL - 6nos, Chain conveyor - 2 nos, Elevator-1 nos, Raw mill fan - 01 no & PJBF fan - 01 nos, multi cyclone discharge rotary air locks - 04 nos, belt bucket elevator - 01 no etc.) Total equipment 28 Nos, minimum quantity per day - 15 Nos |
| 18 | Shifting of materials (i.e cylinders. Plates, equipment spares, lubricants) Material Less than 2MT |
| 19 | Stores to workplace ( Ground floor) |
| 20 | Ground floor to 30 Mtrs |
| 21 | General and Routine maintenance of cement mills section equipments. |
| 22 | Cement mill equipment lubrication and greasing (i.e. belt conveyors - 07 nos, Girth gear - 02 nos, counter shaft - 08 nos, trunnion bearing - 04 nos, weigh feeder - 06 nos, belt bucket elevators - 02 nos, chain bucket elevator - 02 nos & ESP screw conveyor - 02 nos etc. Total equipment 33 Nos, minimum quantity per day - 10 Nos |
| 23 | Maintenance of elevators - 04 nos. |
| 24 | Shifting of materials (i.e cylinders. Plates, equipment spares, lubricants) Material Less than 2MT |
| 25 | Stores to workplace ( Ground floor) |
| 26 | Ground floor to 30 Mtrs |
| 27 | General and Routine maintenance of packing plant & Coal crusher section equipments. |
| 28 | Packing plantequipment lubrication and greasing (bucket elevator - 05 nos, conveyor belts - 14 nos, greasing of packer - 05 nos, wagon loading machines - 08 nos etc.) Total equipment 32 Nos, minimum quantity per day - 8 Nos |
| 29 | Coal crusher equipment lubrication and greasing (i.e. belt conveyor - 05 nos, gear boxes - 05 nos, coal crusher - 01 no, vibrating screen - 01 no, etc ) Total equipment 12 Nos, minimum quantity per day - 04 Nos |
| 30 | Shifting of materials (i.e cylinders. Plates, equipment spares, lubricants) Material Less than 2MT |
| 31 | Stores to workplace ( Ground floor) |
| 32 | Ground floor to 30 Mtrs |
| 33 | Packer maintenance on daily basis (i.e. checking and calibration, replacement of rubber spouts & sack holders etc.) |
| 34 | Replacement of various sizesof Gearboxes/ Fans/Motors/any machinery items etc. (any size)withalignment atanyelevation during shutdown and break down. |
| 35 | Dismantlingand Shifting |
| 36 | Erection, Alignment and finishing work. |
| 37 | Replacementof HRCS Castingsi.e. Cooler side casting,Grate plates with its beam fixing & alignment, Lip plate, Tip castings,Conical segmentetc during Shutdown |
| 38 | Dismantling and shifting to service yard. |
| 39 | Erection, welding and Finishing work |
| 40 | Kiln Throttlingdamper replacement – ( 3 MT ofapproximate weight per set)during shutdown. |
| 41 | Dismantlingand Shifting |
| 42 | Erection, Support welding and finishing work. |
| 43 | ReplacementofCementmillshellliners,Headliners, Diaphragmliners during shutdown. |
| 44 | Dismantling and Shifting to storage yard. |
| 45 | Erection Alignment and finishing work. |
| 46 | Replacement of itemsin Deep Pan Conveyor/ Bucket elevators/ Drag chain( Kiln feed/ Cement Mill/ Packing Plant) during shutdown |
| 47 | Headdrumassembly |
| 48 | Dismantlingand Shifting |
| 49 | Erection Alignment and finishing work. |
| 50 | Taildrumassembly |
| 51 | Dismantling and Shifting |
| 52 | Erection Alignment and finishing work. |
| 53 | DPC |
| 54 | Replacement of DPC partition plates and fixing. |
| 55 | Replacement / Repair of DPC buckets and alignment |
| 56 | Replacement of rollers and finishing work. |
| 57 | Repair of partition web plate strengthening |
| 58 | RAILS |
| 59 | Dismantling and Shifting |
| 60 | Erection and alignment |
| 61 | Structural & Plate work like ducts, chutes,bends,etc,works during shutdown / Break down of the total plant. |
| 62 | Fabrication and finishing work |
| 63 | Dismantling and Shifting |
| 64 | Erection, welding, finishing work. |
| 65 | Immersion Tube Replacement in Cyclone |
| 66 | Fabrication and finishing work |
| 67 | Dismantling and Shifting |
| 68 | ReplacementofAligned conveyor chain inL.S. Crusher |
| 69 | Fabrication and finishing work |
| 70 | Dismantling and Shifting |
| 71 | Angle frame or Beam frame fixing & removal for holding the bricks in preheater section |
| 72 | Brick retainer plate (includes 6- 10mm thk plate fabrication and bottom ribs to be provided for support) |
| 73 | Shifting of cooling fan at kiln shell levels 5- 65mtrs (includes removal /fixing and shifting from ground floorto kiln platform level) Note: crane will be provided by CCI |
| 74 | Replacement of damaged spring plates and tightenng of ropes at kiln inlet & outlet segment |
| 75 | Kiln outlet tip casting replacement work (Includes removal/fixing of SS bolt, cutting, welding, anchor welding & addditional patch work (if required) and finishing works to start the plant smoothy, etc., |
| 76 | Replacement of inner & outer tip casting segment (24 Nos) |
| 77 | Replacement of Damaged SS bolt at Inner & outer tip casting bolts |
| 78 | Multi channel burner pipe Maintenance work during shutdown |
| 79 | Brick retainer plate (includes 6- 10mm thk plate fabrication and bottom ribs to be provided for support) |
| 80 | Shifting of cooling fan at kiln shell levels 5- 65mtrs (includes removal /fixing and shifting from ground floorto kiln platform level) Note: crane will be provided by CCI |
| 81 | Replacement of damaged spring plates and tightenng of ropes at kiln inlet & outlet segment |
| 82 | Cooler Grate 1, 2 & 3 maintenance works during shutdown |
| 83 | Replacement of Dead grate plate, top dead grate plate, 25mm grate plate, 25mm half grate plate 13mm grate plate 13mm half grate plate & side casting (Includes removal/fixing of grate plate, cutting, welding, tightening of bolts, & finishing works to start the plant smoothly, etc.,) |
| 84 | Replacement of carrying wheel & drive crosshead wheel with bearing & assembly and rail replacement work |
| 85 | Cooler carrying wheel sealing plate replacement during shutdown dia Ø127mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required) |
| 86 | Cooler drive shaft sealing plate replacement during shutdown dia Ø200mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required) |
| 87 | Replacement of breaker hammer (includes dismantling of hood, cutting, wedling & tightening of bolts, etc., and finishing works to start the plant smoothly) |
| 88 | Replacement of grizzly bars ( (includes dismantling of hood, cutting, wedling & tightening of bolts, etc., and finishing works to start the plant smoothly) |
| 89 | Cooler drag chain conveyor maintenance works during shutdown |
| 90 | Replacement of drag chain links and pins |
| 91 | Replacement of pins |
| 92 | a. Cooler inclined roof with brick holding/castable arrangment, b. Preduster roof with brick holding frame/ castable arrangment, c. TA duct roof with brick holding frame/ castable arrangmentworks.d) Cooler & preduster side walls and top roof with brick holding frame/castable arrangmentduring shutdown and finishing works to start the plant smoothy, etc., |
| 93 | Replacement of Dead grate plate, top dead grate plate, 25mm grate plate, 25mm half grate plate 13mm grate plate 13mm half grate plate & side casting (Includes removal/fixing of grate plate, cutting, welding, tightening of bolts, & finishing works to start the plant smoothly, etc.,) |
| 94 | Replacement of carrying wheel & drive crosshead wheel with bearing & assemblyand rail replacement work |
| 95 | Preheater all Cyclone feed pipe & cyclone Maintenance work |
| 96 | Redspot patch box provision (includes Anchor welding, castable & welding etc.,) |
| 97 | Feed pipe replacement work 600 -800mm (approx) with castable up to 25Mtr(include cuttiing, welding dismantling, erection works & finishing works to start the plant & etc.,) |
| 98 | Feed pipe replacement work Dia 600 -800mm (approx) with castable above 25Mtr (include cutting, welding dismantling, erection works & finishing works to start the plant & etc.,) |
| 99 | Feed pipe Patch replacement(includes Anchor welding, castable, welding & finishing works etc.,) |
| 100 | All Cyclone cylindrical portion, Riser duct portion, inlet tangential portion, bottom cone portion Patch work (includes Anchor welding, castable, welding & finishing works etc.,) |
| 101 | Replacement of coal mill balls & rings |
| 102 | Redspot patch box provision (includes Anchor welding, castable & welding etc.,) |
| 103 | Feed pipe replacement work 600 -800mm (approx) with castable up to 25Mtr(include cuttiing, welding dismantling, erection works & finishing works to start the plant & etc.,) |
| 104 | Cement mill works |
| 105 | Gear box oil pump replacement |
| 106 | Mill inlet and outlet bearing oil pump replacement |
| 107 | Oil filters replacement |
| 108 | Water pump replacement |
| 109 | Girth gear grease spray pump replacement |
| 110 | FixingofCGISheetswith cladding and angles |
| 111 | Coal Pipe at Kiln and Coal Mill Section |
| 112 | Coal firing pipe at kiln platform Dismantling and shifting&Erection, alignment and finishing work |
| 113 | ReplacementofAirslide cloth in VRM,Kiln and Cementmill and packing plantsection during shutdown. |
| 114 | Limestone / Coal Reclaimers : Buckets and Chain linkreplacement & repairing during shutdown |
| 115 | Buckets fabrication work |
| 116 | Bucketsrepair/straighteningto shape |
| 117 | Replacement of reclaimer chain link |
| 118 | Replacement of Idlers & belts of Belt Conveyor From 650 mm to 1200 mm size Belt conveyor during shutdown. |
| 119 | Dismantling and erection of Carrying / Troughing /impact Idlers |
| 120 | Dismantling and erectionof Return Idlers |
| 121 | ReplacementofBelt conveyor belts from 650mm to 1200mm |
| 122 | Welding and patch repairatvariouselevations of the plant |
| 123 | Dismantling and erection of Carrying / Troughing /impact Idlers |
| 124 | Dismantling and erectionof Return Idlers |
| 125 | ReplacementofBelt conveyor belts from 650mm to 1200mm |
| 126 | S.S./ Alloy steel ANCHOR |
| 127 | Fabrication of Anchor |
| 128 | welding of anchors |
| 129 | Cementmill/Packingplant Chain BucketElevatorworks |
| 130 | Gear box oil pump replacement |
| 131 | Mill inlet and outlet bearing oil pump replacement |
| 132 | Oil filters replacement |
| 133 | Water pump replacement |
| 134 | Girth gear grease spray pump replacement |
AI Tender Summary
Tender Timeline
Sep 28, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedOct 12, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 13, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender