Uttarakhand Pey Jal Nigam has published Bada Danda Dhunkapdi Solar Pumping Water Supply Scheme Construction Of All Civil And E M Works Under Bada Danda Dhunkapdi Solar Pumping Water Supply Scheme Type Water Treatment Plant, Supplying, Laying Jointing Of Api Gi Heavy Medium Pipes In Rising Mai. Submission Date for this Tender is 10-10-2022. Water Supply Project Tenders in bironkhal Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Construction of RCC Intake chamber at source including supply of all material, labour, T & P etc.as per drawingand desgin instructions given by Engineer-In-Charge |
2 | Construction of RCCRoughening Filter including supply of all material, labour, T & P etc.as per drawingand desgin instructions given by Engineer-In-Charge |
3 | Construction of R.C.C. Cross Wall at 1No sources including supply of all material, labour, T & P etc.as per drawingand desgin instructions given by Engineer-In-Charge |
4 | Providing of all materials, Carting from site store to site of work,Lowering into trenches with true to alignment, Laying of MSERW, Jointingby electric welding process with proper grade ofeletrodes suitable for jointing of water supply pipe lines (Ador,L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete. |
5 | MSERW PIPE |
6 | From MPS to TOP CWR MSERW Pipe 50 mm Dia, 3.9 mm Thickness |
7 | From BFG to MPS. GI(M) Pipe 50 mm Dia |
8 | 15 mm dia (Avg 20m length per FHTC). |
9 | 20 mm dia |
10 | 25 mm dia |
11 | 32 mm dia |
12 | 40 mm dia |
13 | Supply of all materials, labour and T & P etc. and construction ofPump House as per type design and drawing |
14 | At M P S( size 5.5x5.0x4.5)M |
15 | Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assumingthat 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soilmixed with shingle, bajari and boulders and rest 25% will be in medium rock |
16 | Soil mixed with boulder (SMB) |
17 | Medium Rock (MR) |
18 | Supply of all materials, labour and T & P etc. and construction of R.C.C. Sump / Clear Water Reservoir of following Capacity in K.L. as perdesign and drawing including fixing of pipes and fittings including cartage of materials etc. complete |
19 | Clear water Sump 22.5 kl Capacity at MPS |
20 | Clear water Sump 22.5 kl Capacity at TOP CWR |
21 | RCC CWR 4.0 KL |
22 | RCC CWR 5.0 KL |
23 | RCC CWR 10.0 KL |
24 | Supply & fixing of following sizes of valves including carting the same up to side of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect |
25 | Sluice Valve50 mm dia (CS D/F Class 200 ASA) |
26 | Reflux Valve50 mm dia (CS D/F Class 200 ASA) |
27 | C.I. Air valve (Double Acting) 50mm |
28 | Supply of all materials, labour, T & P etc. and Construction of size Sluice Valve / Reflux Valve / Scour Valve Chamber as per type design complete(1.2x1.2x1.2) |
29 | Supply of all materials, labour, T & P etc. and Construction of size Air Valve Chamber as per type design complete(1.2x1.2x1.2) |
30 | Supply of all materials, labour, T & P etc. and Construction ofR.C.C Anchor Block as per type design complete |
31 | Making 2 M wide Briddle path forrising main including hill side cutting and coolie walling of all materials, labour, T & P etc. |
32 | Painting of MS ERW Pipes with 2 coats of approved quality. (Anti-Corrosive paint over one coat of Primer) (Dia of pipe in mm) |
33 | 50 mm dia |
34 | Excavation for foundation in Soil mixed with boulders |
35 | RR Dry including supply of all materials, labour, T&P etc. complete |
36 | RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete |
37 | Supply of FRP Coated MS bucket type chlorinator of 25Ltrs capacity with chlorination arrangements. |
38 | Supply and fixing of the following fittings including cartage of materials, labour, T&P etc. complete |
39 | Gate/Wheel Valve ( Brass )/G.M.Valve |
40 | 20 mm dia |
41 | 25 mm dia |
42 | 32 mm dia |
43 | 40 mm dia |
44 | 50 mm dia |
45 | Supply of all materials, labour, T&P etc. and construction of0.9 m x 0.9 m x 0.9 m size Gate Valve chamber with FPS bricks |
46 | Providing and fixing brass bib cock of approved quality : |
47 | 15 mm nominal bore |
48 | Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main |
49 | 15 mm nominal bore |
50 | C.I.Mouth,brass ferrule 15 mm dia |
51 | Square shape 450x450 mm precast R.C.C.manhole cover with frame L-D-25 |
52 | Providing G.I.Tee (equal) |
53 | Providing G.I.Union(15 mm dia) |
54 | C.P.Brass extension Nipple |
55 | Providing G.I.elbow (15 mm dia) |
56 | E&M |
57 | Supply of Solar Submarsible AC pump set to deliver 80 lpm discharge at 180 mtrs. Head, 10 HP,230 VAC,50Hz,3 phase with 3 mtrs cable and Controller complete all respect. ( one set of spare) |
58 | Supply of solar pump contoller pannel (VFD cum starter) solarDC imput supply and suitable output supply for above submarsible pumpmset as following .( One no. as spare ) Inbuit MMPT tracking facility ensuing overload, under voltage protection force air cooled inverse exponential shut down at the time of low radition.Parameter display facilitiesDry running protection to avoid dry run of pump set.Mannual/ auto run selector switch on pannel boxAuto on / off feature depending of water levelin tank by sener based floting switch |
59 | GSM sim based mobile phone operating device |
60 | Float switch with control wire. ( for tank empty and full ) |
61 | Supply of solar DC wire 6 Sq.mm x1 core copper conducted pvc insulated |
62 | Jointing and other fittings |
63 | Supply of Submarsible cable 10Sq.mmx 3 Core, copper conductor PVCInsulated. |
64 | Solar Photo Voltic poly crystalline solar modulale 335 watt. |
65 | Hot deep galvanized steel structure |
66 | Construction of CC foundation / base for mounting structurewith all consuambale material ie. Cement, concrete, sand, ironbar etc |
67 | Lighting arrestor with pole, copper strip, copper plate earthing complete in all respect. |
68 | Copper earthing of all new and existing PV modules mounting structures including copper strip, copper plate earthing complete in all respect. |
69 | Pipe Line fitting with 50mm dia size GI pipe, Gate Valve Reflux Valve, GI Union, elbow, nipple, Teeetc for vertically installation of submersible pump in water tank. |
70 | Installlation and testing of all above supplied items. |
71 | Watch and ward of thissolar pumping scheme for six month during stabilization. |