Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Three Phase Electric Loco Simulator In Motion And Emu-Memu Simulator In Motion (On Turnkey Basis) |
| 2 | Cost of Three Phase Electric Loco Simulator in Motion [On Turnkey Basis] as per specificationNO.COFMOW/LOCO-SIMULATOR/2022 (with AMC)Rev 0 given in Bid Document Part-II. Foreign bidders areallowed to quote in two currencies against line items[i.e. INR and other foreign currencies].AS PER SCHEDULE-1 MUMBAI As per tender 15.00 |
| 3 | Cost of Concomitant Accessories/works as per clause No.3.2 (2 to 15) of Section-III of BidDocument Part-II.AS PER SCHEDULE-1 MUMBAI As per tender 15.00 Set |
| 4 | Cost of Turnkey Charges viz. Foundation, Installation & Commissioning etc. as per clause 25 ofSection-III of Bid Documents Part-II.AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-II4 ES2 AMC (Y) Non Stock --- Yes CONSIGNEE INR (BM1)Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM1) Services (Y)Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-IIGroup BM2-EMU-MEMU Simulator in Motion1 BM1 Basic Non Stock --- Yes RITES INR + (BM2) Machine (Y) Any 1Cost of EMU-MEMU Simulator in Motion [On Turnkey Basis] as per specification NO.COFMOW/LOCO-SIMULATOR/2022 (with AMC)Rev 0 given in Bid Document Part-II. Foreign bidders areallowed to quote in two currencies against line items[i.e. INR and other foreign currencies].AS PER SCHEDULE-I MUMBAI As per tender 3.00 NumbersConsignee/Port Cons.OF BID DOCU PT-II Conditions2 CA1 Concomitant Non Stock --- Yes RITES INR + (BM2) Accessories Any 1(Y)Cost of Concomitant Accessories/works as per clause No.3.2 (2 to 15) of Section-III of BidDocument Part-II.AS PER SCHEDULE-I MUMBAI As per tender 3.00 SetConsignee/Port Cons.OF BID DOCU PT-II Conditions3 ES1 Essential Non Stock --- Yes CONSIGNEE INR (BM2) Services (Y)Cost of Turnkey Charges viz. Foundation, Installation & Commissioning etc. as per clause 25 ofSection-III of Bid Documents Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II4 ES2 AMC (Y) Non Stock --- Yes CONSIGNEE INR (BM2)Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM2) Services (Y)Page 2 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II3. T AND CF.O.R (for indigenous offers)DescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 47 Months of issue of Contract, Completion AS PER Time: Within 51 Months Schedule Chart OFBID DOCUMENTPART-IIPayment TermsS.No DescriptionPayment Terms (Indigenous Offer)1 AS PER CLAUSE 1802 SECTION - II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDER.Payment Terms (Import Offer)1 AS PER CLAUSE 1801 SECTION -II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDERStatutory Variation ClauseS.No Description1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments inrespect of the items stipulated in the contract (and not the raw materials thereof), within the original deliveryperiod stipulated in the contract, or last unconditionally extended delivery period shall be to Railways account.Only such variation shall be admissible which takes place after the submission of bid. No claim on account ofstatutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in hisoffer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall beadmissible on account of misclassification by the supplier/ contractor. This clause shall read with clause 1211(vi) of section-I and clause 1200 and 1300 section-II of Bid Document Part-IOption ClauseS.No Description1 As per clause 1602 Section-II of Bid Document part-IStandard Governing ConditionsS.No Description1 As per Bid Document Part-I attached with the tender4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlyPage 3 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Special Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER SPECIAL CONDITION OF TENDER. Yes Yes Allowed(Mandatory)Standard Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER CLAUSE 0500 OF INSTRUCTIONS TO TENDERERS, BID Yes Yes AllowedDOCUMENT PART-I. (Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Have you quoted Warranty Obligations as per Para 3409 of Instructions to No No Not AllowedTenderers Bid Document Part - I ?2 Have you quoted for Optional Accessories, Spares, AMC etc., if applicable No No Not Allowedand as per the requirement of Bid Document Part - II ?3 Have you quoted Delivery Period correctly and precisely ? No No Not Allowed4 Have you quoted for any other items considered essential by you for the No No Not Allowedoperation of the machine to meet the purpose and capability specified intechnical specification.[UNDER ESSENTIAL SPARES]5 Have you uploaded self-certification or auditors / accountants certificate in No No Not Allowedsupport of your claim for Preference to Make in India, if any as per clause0114 section-I of Bid Document Part-I.5.1 Have you submitted banker details viz. name of bank and complete No No Not Allowedaddress with pin code, bank account number, type of account, branchcode no., beneficiary name and address, IFSC code, RTGS code etc. It isessential to submit the banks details for establishing letter ofcredit/releasing payments.6 Have you quoted price of basic machine, Concomitant Accessories, No No Not Allowedessential spares, essential services, AMC and other items as per therequirement. It is mandatory to submit offers against all these itemsotherwise the bid shall not be considered in ranking.7 Have you submitted Annexure A of Section VI of technical specifications No No Not AllowedBid Document Part - II , duly filled in8 Have you submitted other supporting documents to establish your eligibility No No Not Allowed? It may consists of the followings:8.1 Bankers Report, Financial Statements etc. - Para 0501 (b) of Instructions No No Not Allowedto Tenderers Bid Documents Part - I8.2 Commercial Details and Performance Statement - Annexure - I Bid No No Not AllowedDocument Part - I8.3 Statement of Equipment and Quality Control Annexure -2 Bid Documents No No Not AllowedPart - I8.4 Details related to compliance of reference clause mentioned in special No No Not Allowedconditions of tender.Commercial-CompliancePage 4 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.2 Inspection agency shall be RITES. However, for the contracts placed on No No Not Allowedforeign firms/contractors, inspection will be carried out by RA Berlin, but atthe time of Inspection call, if RA Berlin post is vacant or unable to carry-outthe inspection, at that stage, inspection will be carried out by M/s RITES,New Delhi or Gurugram (Haryana).3 Tender documet consists of Bid Document Part-I, Bid Document Part-II, No No Not AllowedSpecial conditions of Tender NIT and conditions mentioned in thisdocument. Tenderers to ensure compliance of conditions mentioned inthese documents.Special ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Special Condition regarding Double Bid System - No No Not Allowed1.1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.1.2 For tender invited with Double Bid System Tender, only Techno- No No Not Allowedcommercial bids will be opened on Tender Closing Date. After technicalscrutiny of the bids, Financial bids will be opened for only those bidderswhose techno-commercial bids are declared suitable.2 In terms of clause 1102, section-I, Bid Document Part-I, Insurance charges No No Not Allowedfor Indigenous components, should be quoted in Other charges columnagainst the particular items. No separate line item has been provided forInsurance Charges.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Bidders must submit their technical bids as per Annexure-A in Section-VI Yes Yes AllowedBid document part-II. Tenderers are required to submit complete details (Mandatory)including values, write-up, Drawings, sketch, brochure etc. as perrequirement specified in respective clauses mentioned therein. In case ofincomplete / sketchy information, the technical offer being incomplete isliable to be rejected. Tenderers should clearly indicate compliance.UndertakingsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 I/We agree to supply the tendered stores at the rates quoted by me/us in No No Not Allowedaccordance with the conditions mentioned in bid document part-I, biddocument part-II,special conditions of tender, NIT and conditionsmentioned in this document.Page 5 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:002 I/We also confirm that Rates and other financial terms quoted in relevant No No Not Allowedcolumns of financial bid will only be applicable for acceptance. Such termsquoted anywhere else shall not be considered for inter-se evaluation.S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Attention is invited to corrigendum No. 19 vide which Public Procurement No Yes AllowedOrder (Make in India) dated 04.06.2020 and 16.09.2020 has been included (Mandatory)as part of tender document. Bidders are further requested to take specialnote of the following clause of Public Procurement Oder (Make in India)dated 16.09.2020. \"Entities of countries which have been identified by thenodal Ministry/Department as not allowing Indian companies to participatein their Government procurement for any item related to that nodal Ministryshall not be allowed to participate in Government procurement in India forall items related to that nodal Ministry/Department, except for the list ofitems published by the Ministry/Department permitting their participation.The term entity of a country shall have the same meaning as under theFDI Policy of DPIIT as amended from time to time\".6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document DescriptionBIDDOCUMENTPART-1 Bid Document Part IIOCT17UPTOCORR.NO.22.pdfBIDDOCUMENTPART-IIPAGE1-2 Bid Document Part II Page 1 to 100100.pdfBIDDOCUMENTPART-3 Bid Document Part II Page101 to 148IIPAGE101-148_1.pdf4 SpecialCond.G-107152.pdf Special Conditions of Tender5 SplitingConditionsofSimulator.pdf Spliting Conditions of Tender7. RESPONSIVENESSS.No. Description1 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By SSE/Prtg. ( VINEET KUMAR ) |
| 5 | Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM1) Services (Y)Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-IIGroup BM2-EMU-MEMU Simulator in Motion1 BM1 Basic Non Stock --- Yes RITES INR + (BM2) Machine (Y) Any 1Cost of EMU-MEMU Simulator in Motion [On Turnkey Basis] as per specification NO.COFMOW/LOCO-SIMULATOR/2022 (with AMC)Rev 0 given in Bid Document Part-II. Foreign bidders areallowed to quote in two currencies against line items[i.e. INR and other foreign currencies].AS PER SCHEDULE-I MUMBAI As per tender 3.00 NumbersConsignee/Port Cons.OF BID DOCU PT-II Conditions2 CA1 Concomitant Non Stock --- Yes RITES INR + (BM2) Accessories Any 1(Y)Cost of Concomitant Accessories/works as per clause No.3.2 (2 to 15) of Section-III of BidDocument Part-II.AS PER SCHEDULE-I MUMBAI As per tender 3.00 SetConsignee/Port Cons.OF BID DOCU PT-II Conditions3 ES1 Essential Non Stock --- Yes CONSIGNEE INR (BM2) Services (Y)Cost of Turnkey Charges viz. Foundation, Installation & Commissioning etc. as per clause 25 ofSection-III of Bid Documents Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II4 ES2 AMC (Y) Non Stock --- Yes CONSIGNEE INR (BM2)Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM2) Services (Y)Page 2 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II3. T AND CF.O.R (for indigenous offers)DescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 47 Months of issue of Contract, Completion AS PER Time: Within 51 Months Schedule Chart OFBID DOCUMENTPART-IIPayment TermsS.No DescriptionPayment Terms (Indigenous Offer)1 AS PER CLAUSE 1802 SECTION - II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDER.Payment Terms (Import Offer)1 AS PER CLAUSE 1801 SECTION -II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDERStatutory Variation ClauseS.No Description1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments inrespect of the items stipulated in the contract (and not the raw materials thereof), within the original deliveryperiod stipulated in the contract, or last unconditionally extended delivery period shall be to Railways account.Only such variation shall be admissible which takes place after the submission of bid. No claim on account ofstatutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in hisoffer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall beadmissible on account of misclassification by the supplier/ contractor. This clause shall read with clause 1211(vi) of section-I and clause 1200 and 1300 section-II of Bid Document Part-IOption ClauseS.No Description1 As per clause 1602 Section-II of Bid Document part-IStandard Governing ConditionsS.No Description1 As per Bid Document Part-I attached with the tender4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlyPage 3 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Special Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER SPECIAL CONDITION OF TENDER. Yes Yes Allowed(Mandatory)Standard Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER CLAUSE 0500 OF INSTRUCTIONS TO TENDERERS, BID Yes Yes AllowedDOCUMENT PART-I. (Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Have you quoted Warranty Obligations as per Para 3409 of Instructions to No No Not AllowedTenderers Bid Document Part - I ?2 Have you quoted for Optional Accessories, Spares, AMC etc., if applicable No No Not Allowedand as per the requirement of Bid Document Part - II ?3 Have you quoted Delivery Period correctly and precisely ? No No Not Allowed4 Have you quoted for any other items considered essential by you for the No No Not Allowedoperation of the machine to meet the purpose and capability specified intechnical specification.[UNDER ESSENTIAL SPARES]5 Have you uploaded self-certification or auditors / accountants certificate in No No Not Allowedsupport of your claim for Preference to Make in India, if any as per clause0114 section-I of Bid Document Part-I.5.1 Have you submitted banker details viz. name of bank and complete No No Not Allowedaddress with pin code, bank account number, type of account, branchcode no., beneficiary name and address, IFSC code, RTGS code etc. It isessential to submit the banks details for establishing letter ofcredit/releasing payments.6 Have you quoted price of basic machine, Concomitant Accessories, No No Not Allowedessential spares, essential services, AMC and other items as per therequirement. It is mandatory to submit offers against all these itemsotherwise the bid shall not be considered in ranking.7 Have you submitted Annexure A of Section VI of technical specifications No No Not AllowedBid Document Part - II , duly filled in8 Have you submitted other supporting documents to establish your eligibility No No Not Allowed? It may consists of the followings:8.1 Bankers Report, Financial Statements etc. - Para 0501 (b) of Instructions No No Not Allowedto Tenderers Bid Documents Part - I8.2 Commercial Details and Performance Statement - Annexure - I Bid No No Not AllowedDocument Part - I8.3 Statement of Equipment and Quality Control Annexure -2 Bid Documents No No Not AllowedPart - I8.4 Details related to compliance of reference clause mentioned in special No No Not Allowedconditions of tender.Commercial-CompliancePage 4 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.2 Inspection agency shall be RITES. However, for the contracts placed on No No Not Allowedforeign firms/contractors, inspection will be carried out by RA Berlin, but atthe time of Inspection call, if RA Berlin post is vacant or unable to carry-outthe inspection, at that stage, inspection will be carried out by M/s RITES,New Delhi or Gurugram (Haryana).3 Tender documet consists of Bid Document Part-I, Bid Document Part-II, No No Not AllowedSpecial conditions of Tender NIT and conditions mentioned in thisdocument. Tenderers to ensure compliance of conditions mentioned inthese documents.Special ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Special Condition regarding Double Bid System - No No Not Allowed1.1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.1.2 For tender invited with Double Bid System Tender, only Techno- No No Not Allowedcommercial bids will be opened on Tender Closing Date. After technicalscrutiny of the bids, Financial bids will be opened for only those bidderswhose techno-commercial bids are declared suitable.2 In terms of clause 1102, section-I, Bid Document Part-I, Insurance charges No No Not Allowedfor Indigenous components, should be quoted in Other charges columnagainst the particular items. No separate line item has been provided forInsurance Charges.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Bidders must submit their technical bids as per Annexure-A in Section-VI Yes Yes AllowedBid document part-II. Tenderers are required to submit complete details (Mandatory)including values, write-up, Drawings, sketch, brochure etc. as perrequirement specified in respective clauses mentioned therein. In case ofincomplete / sketchy information, the technical offer being incomplete isliable to be rejected. Tenderers should clearly indicate compliance.UndertakingsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 I/We agree to supply the tendered stores at the rates quoted by me/us in No No Not Allowedaccordance with the conditions mentioned in bid document part-I, biddocument part-II,special conditions of tender, NIT and conditionsmentioned in this document.Page 5 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:002 I/We also confirm that Rates and other financial terms quoted in relevant No No Not Allowedcolumns of financial bid will only be applicable for acceptance. Such termsquoted anywhere else shall not be considered for inter-se evaluation.S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Attention is invited to corrigendum No. 19 vide which Public Procurement No Yes AllowedOrder (Make in India) dated 04.06.2020 and 16.09.2020 has been included (Mandatory)as part of tender document. Bidders are further requested to take specialnote of the following clause of Public Procurement Oder (Make in India)dated 16.09.2020. \"Entities of countries which have been identified by thenodal Ministry/Department as not allowing Indian companies to participatein their Government procurement for any item related to that nodal Ministryshall not be allowed to participate in Government procurement in India forall items related to that nodal Ministry/Department, except for the list ofitems published by the Ministry/Department permitting their participation.The term entity of a country shall have the same meaning as under theFDI Policy of DPIIT as amended from time to time\".6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document DescriptionBIDDOCUMENTPART-1 Bid Document Part IIOCT17UPTOCORR.NO.22.pdfBIDDOCUMENTPART-IIPAGE1-2 Bid Document Part II Page 1 to 100100.pdfBIDDOCUMENTPART-3 Bid Document Part II Page101 to 148IIPAGE101-148_1.pdf4 SpecialCond.G-107152.pdf Special Conditions of Tender5 SplitingConditionsofSimulator.pdf Spliting Conditions of Tender7. RESPONSIVENESSS.No. Description1 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By SSE/Prtg. ( VINEET KUMAR ) |
| 6 | Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-1 OF As per tender Conditions 15.00 NumbersAt (Location)BID DOC. PT-IIGroup BM2-EMU-MEMU Simulator in Motion1 BM1 Basic Non Stock --- Yes RITES INR + (BM2) Machine (Y) Any 1Cost of EMU-MEMU Simulator in Motion [On Turnkey Basis] as per specification NO.COFMOW/LOCO-SIMULATOR/2022 (with AMC)Rev 0 given in Bid Document Part-II. Foreign bidders areallowed to quote in two currencies against line items[i.e. INR and other foreign currencies].AS PER SCHEDULE-I MUMBAI As per tender 3.00 NumbersConsignee/Port Cons.OF BID DOCU PT-II Conditions2 CA1 Concomitant Non Stock --- Yes RITES INR + (BM2) Accessories Any 1(Y)Cost of Concomitant Accessories/works as per clause No.3.2 (2 to 15) of Section-III of BidDocument Part-II.AS PER SCHEDULE-I MUMBAI As per tender 3.00 SetConsignee/Port Cons.OF BID DOCU PT-II Conditions3 ES1 Essential Non Stock --- Yes CONSIGNEE INR (BM2) Services (Y)Cost of Turnkey Charges viz. Foundation, Installation & Commissioning etc. as per clause 25 ofSection-III of Bid Documents Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II4 ES2 AMC (Y) Non Stock --- Yes CONSIGNEE INR (BM2)Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM2) Services (Y)Page 2 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II3. T AND CF.O.R (for indigenous offers)DescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 47 Months of issue of Contract, Completion AS PER Time: Within 51 Months Schedule Chart OFBID DOCUMENTPART-IIPayment TermsS.No DescriptionPayment Terms (Indigenous Offer)1 AS PER CLAUSE 1802 SECTION - II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDER.Payment Terms (Import Offer)1 AS PER CLAUSE 1801 SECTION -II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDERStatutory Variation ClauseS.No Description1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments inrespect of the items stipulated in the contract (and not the raw materials thereof), within the original deliveryperiod stipulated in the contract, or last unconditionally extended delivery period shall be to Railways account.Only such variation shall be admissible which takes place after the submission of bid. No claim on account ofstatutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in hisoffer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall beadmissible on account of misclassification by the supplier/ contractor. This clause shall read with clause 1211(vi) of section-I and clause 1200 and 1300 section-II of Bid Document Part-IOption ClauseS.No Description1 As per clause 1602 Section-II of Bid Document part-IStandard Governing ConditionsS.No Description1 As per Bid Document Part-I attached with the tender4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlyPage 3 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Special Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER SPECIAL CONDITION OF TENDER. Yes Yes Allowed(Mandatory)Standard Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER CLAUSE 0500 OF INSTRUCTIONS TO TENDERERS, BID Yes Yes AllowedDOCUMENT PART-I. (Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Have you quoted Warranty Obligations as per Para 3409 of Instructions to No No Not AllowedTenderers Bid Document Part - I ?2 Have you quoted for Optional Accessories, Spares, AMC etc., if applicable No No Not Allowedand as per the requirement of Bid Document Part - II ?3 Have you quoted Delivery Period correctly and precisely ? No No Not Allowed4 Have you quoted for any other items considered essential by you for the No No Not Allowedoperation of the machine to meet the purpose and capability specified intechnical specification.[UNDER ESSENTIAL SPARES]5 Have you uploaded self-certification or auditors / accountants certificate in No No Not Allowedsupport of your claim for Preference to Make in India, if any as per clause0114 section-I of Bid Document Part-I.5.1 Have you submitted banker details viz. name of bank and complete No No Not Allowedaddress with pin code, bank account number, type of account, branchcode no., beneficiary name and address, IFSC code, RTGS code etc. It isessential to submit the banks details for establishing letter ofcredit/releasing payments.6 Have you quoted price of basic machine, Concomitant Accessories, No No Not Allowedessential spares, essential services, AMC and other items as per therequirement. It is mandatory to submit offers against all these itemsotherwise the bid shall not be considered in ranking.7 Have you submitted Annexure A of Section VI of technical specifications No No Not AllowedBid Document Part - II , duly filled in8 Have you submitted other supporting documents to establish your eligibility No No Not Allowed? It may consists of the followings:8.1 Bankers Report, Financial Statements etc. - Para 0501 (b) of Instructions No No Not Allowedto Tenderers Bid Documents Part - I8.2 Commercial Details and Performance Statement - Annexure - I Bid No No Not AllowedDocument Part - I8.3 Statement of Equipment and Quality Control Annexure -2 Bid Documents No No Not AllowedPart - I8.4 Details related to compliance of reference clause mentioned in special No No Not Allowedconditions of tender.Commercial-CompliancePage 4 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.2 Inspection agency shall be RITES. However, for the contracts placed on No No Not Allowedforeign firms/contractors, inspection will be carried out by RA Berlin, but atthe time of Inspection call, if RA Berlin post is vacant or unable to carry-outthe inspection, at that stage, inspection will be carried out by M/s RITES,New Delhi or Gurugram (Haryana).3 Tender documet consists of Bid Document Part-I, Bid Document Part-II, No No Not AllowedSpecial conditions of Tender NIT and conditions mentioned in thisdocument. Tenderers to ensure compliance of conditions mentioned inthese documents.Special ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Special Condition regarding Double Bid System - No No Not Allowed1.1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.1.2 For tender invited with Double Bid System Tender, only Techno- No No Not Allowedcommercial bids will be opened on Tender Closing Date. After technicalscrutiny of the bids, Financial bids will be opened for only those bidderswhose techno-commercial bids are declared suitable.2 In terms of clause 1102, section-I, Bid Document Part-I, Insurance charges No No Not Allowedfor Indigenous components, should be quoted in Other charges columnagainst the particular items. No separate line item has been provided forInsurance Charges.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Bidders must submit their technical bids as per Annexure-A in Section-VI Yes Yes AllowedBid document part-II. Tenderers are required to submit complete details (Mandatory)including values, write-up, Drawings, sketch, brochure etc. as perrequirement specified in respective clauses mentioned therein. In case ofincomplete / sketchy information, the technical offer being incomplete isliable to be rejected. Tenderers should clearly indicate compliance.UndertakingsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 I/We agree to supply the tendered stores at the rates quoted by me/us in No No Not Allowedaccordance with the conditions mentioned in bid document part-I, biddocument part-II,special conditions of tender, NIT and conditionsmentioned in this document.Page 5 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:002 I/We also confirm that Rates and other financial terms quoted in relevant No No Not Allowedcolumns of financial bid will only be applicable for acceptance. Such termsquoted anywhere else shall not be considered for inter-se evaluation.S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Attention is invited to corrigendum No. 19 vide which Public Procurement No Yes AllowedOrder (Make in India) dated 04.06.2020 and 16.09.2020 has been included (Mandatory)as part of tender document. Bidders are further requested to take specialnote of the following clause of Public Procurement Oder (Make in India)dated 16.09.2020. \"Entities of countries which have been identified by thenodal Ministry/Department as not allowing Indian companies to participatein their Government procurement for any item related to that nodal Ministryshall not be allowed to participate in Government procurement in India forall items related to that nodal Ministry/Department, except for the list ofitems published by the Ministry/Department permitting their participation.The term entity of a country shall have the same meaning as under theFDI Policy of DPIIT as amended from time to time\".6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document DescriptionBIDDOCUMENTPART-1 Bid Document Part IIOCT17UPTOCORR.NO.22.pdfBIDDOCUMENTPART-IIPAGE1-2 Bid Document Part II Page 1 to 100100.pdfBIDDOCUMENTPART-3 Bid Document Part II Page101 to 148IIPAGE101-148_1.pdf4 SpecialCond.G-107152.pdf Special Conditions of Tender5 SplitingConditionsofSimulator.pdf Spliting Conditions of Tender7. RESPONSIVENESSS.No. Description1 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By SSE/Prtg. ( VINEET KUMAR ) |
| 7 | Cost of EMU-MEMU Simulator in Motion [On Turnkey Basis] as per specification NO.COFMOW/LOCO-SIMULATOR/2022 (with AMC)Rev 0 given in Bid Document Part-II. Foreign bidders areallowed to quote in two currencies against line items[i.e. INR and other foreign currencies]. |
| 8 | Cost of Concomitant Accessories/works as per clause No.3.2 (2 to 15) of Section-III of BidDocument Part-II.AS PER SCHEDULE-I MUMBAI As per tender 3.00 Set |
| 9 | Cost of Turnkey Charges viz. Foundation, Installation & Commissioning etc. as per clause 25 ofSection-III of Bid Documents Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II4 ES2 AMC (Y) Non Stock --- Yes CONSIGNEE INR (BM2)Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM2) Services (Y)Page 2 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II3. T AND CF.O.R (for indigenous offers)DescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 47 Months of issue of Contract, Completion AS PER Time: Within 51 Months Schedule Chart OFBID DOCUMENTPART-IIPayment TermsS.No DescriptionPayment Terms (Indigenous Offer)1 AS PER CLAUSE 1802 SECTION - II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDER.Payment Terms (Import Offer)1 AS PER CLAUSE 1801 SECTION -II [GENERAL CONDITIONS OF CONTRACT] OF BID DOCUMENTPART-I2 AS PER SPECIAL CONDITIONS OF TENDERStatutory Variation ClauseS.No Description1 Statutory Variation in taxes and duties, or fresh imposition of taxes and duties by State/ Central Governments inrespect of the items stipulated in the contract (and not the raw materials thereof), within the original deliveryperiod stipulated in the contract, or last unconditionally extended delivery period shall be to Railways account.Only such variation shall be admissible which takes place after the submission of bid. No claim on account ofstatutory variation in respect of existing tax/duty will be accepted unless the tenderer has clearly indicated in hisoffer the rate of tax/duty considered in his quoted rate. No claim on account of statutory variation shall beadmissible on account of misclassification by the supplier/ contractor. This clause shall read with clause 1211(vi) of section-I and clause 1200 and 1300 section-II of Bid Document Part-IOption ClauseS.No Description1 As per clause 1602 Section-II of Bid Document part-IStandard Governing ConditionsS.No Description1 As per Bid Document Part-I attached with the tender4. ELIGIBILITY CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any eligibility conditionImportant :shall be opened as part of technical bid onlyPage 3 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00Special Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER SPECIAL CONDITION OF TENDER. Yes Yes Allowed(Mandatory)Standard Eligibility CriteriaS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 AS PER CLAUSE 0500 OF INSTRUCTIONS TO TENDERERS, BID Yes Yes AllowedDOCUMENT PART-I. (Optional)5. COMPLIANCE CONDITIONSAll documents uploaded and remarks / confirmation entered by the bidders against any complianceImportant :condition shall be opened as part of technical bid only.Check ListS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Have you quoted Warranty Obligations as per Para 3409 of Instructions to No No Not AllowedTenderers Bid Document Part - I ?2 Have you quoted for Optional Accessories, Spares, AMC etc., if applicable No No Not Allowedand as per the requirement of Bid Document Part - II ?3 Have you quoted Delivery Period correctly and precisely ? No No Not Allowed4 Have you quoted for any other items considered essential by you for the No No Not Allowedoperation of the machine to meet the purpose and capability specified intechnical specification.[UNDER ESSENTIAL SPARES]5 Have you uploaded self-certification or auditors / accountants certificate in No No Not Allowedsupport of your claim for Preference to Make in India, if any as per clause0114 section-I of Bid Document Part-I.5.1 Have you submitted banker details viz. name of bank and complete No No Not Allowedaddress with pin code, bank account number, type of account, branchcode no., beneficiary name and address, IFSC code, RTGS code etc. It isessential to submit the banks details for establishing letter ofcredit/releasing payments.6 Have you quoted price of basic machine, Concomitant Accessories, No No Not Allowedessential spares, essential services, AMC and other items as per therequirement. It is mandatory to submit offers against all these itemsotherwise the bid shall not be considered in ranking.7 Have you submitted Annexure A of Section VI of technical specifications No No Not AllowedBid Document Part - II , duly filled in8 Have you submitted other supporting documents to establish your eligibility No No Not Allowed? It may consists of the followings:8.1 Bankers Report, Financial Statements etc. - Para 0501 (b) of Instructions No No Not Allowedto Tenderers Bid Documents Part - I8.2 Commercial Details and Performance Statement - Annexure - I Bid No No Not AllowedDocument Part - I8.3 Statement of Equipment and Quality Control Annexure -2 Bid Documents No No Not AllowedPart - I8.4 Details related to compliance of reference clause mentioned in special No No Not Allowedconditions of tender.Commercial-CompliancePage 4 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:00S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Please enter the percentage of local content in the material being offered. No Yes AllowedPlease enter 0 for fully imported items, and 100 for fully indigenous items. (Optional)The definition and calculation of local content shall be in accordance withthe Make in India policy as incorporated in the tender conditions.General InstructionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.2 Inspection agency shall be RITES. However, for the contracts placed on No No Not Allowedforeign firms/contractors, inspection will be carried out by RA Berlin, but atthe time of Inspection call, if RA Berlin post is vacant or unable to carry-outthe inspection, at that stage, inspection will be carried out by M/s RITES,New Delhi or Gurugram (Haryana).3 Tender documet consists of Bid Document Part-I, Bid Document Part-II, No No Not AllowedSpecial conditions of Tender NIT and conditions mentioned in thisdocument. Tenderers to ensure compliance of conditions mentioned inthese documents.Special ConditionsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Special Condition regarding Double Bid System - No No Not Allowed1.1 For tenders invited with double bid system, PDF containing the price break- No No Not Allowedup, wherever asked, should be attached with Financial bid only.1.2 For tender invited with Double Bid System Tender, only Techno- No No Not Allowedcommercial bids will be opened on Tender Closing Date. After technicalscrutiny of the bids, Financial bids will be opened for only those bidderswhose techno-commercial bids are declared suitable.2 In terms of clause 1102, section-I, Bid Document Part-I, Insurance charges No No Not Allowedfor Indigenous components, should be quoted in Other charges columnagainst the particular items. No separate line item has been provided forInsurance Charges.Technical-CompliancesS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Bidders must submit their technical bids as per Annexure-A in Section-VI Yes Yes AllowedBid document part-II. Tenderers are required to submit complete details (Mandatory)including values, write-up, Drawings, sketch, brochure etc. as perrequirement specified in respective clauses mentioned therein. In case ofincomplete / sketchy information, the technical offer being incomplete isliable to be rejected. Tenderers should clearly indicate compliance.UndertakingsS.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 I/We agree to supply the tendered stores at the rates quoted by me/us in No No Not Allowedaccordance with the conditions mentioned in bid document part-I, biddocument part-II,special conditions of tender, NIT and conditionsmentioned in this document.Page 5 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOWTENDER DOCUMENTTender No G-107152 Closing Date/Time 14/11/2022 15:002 I/We also confirm that Rates and other financial terms quoted in relevant No No Not Allowedcolumns of financial bid will only be applicable for acceptance. Such termsquoted anywhere else shall not be considered for inter-se evaluation.S.No. Description Confirmation Remarks DocumentsRequired Allowed Uploading1 Attention is invited to corrigendum No. 19 vide which Public Procurement No Yes AllowedOrder (Make in India) dated 04.06.2020 and 16.09.2020 has been included (Mandatory)as part of tender document. Bidders are further requested to take specialnote of the following clause of Public Procurement Oder (Make in India)dated 16.09.2020. \"Entities of countries which have been identified by thenodal Ministry/Department as not allowing Indian companies to participatein their Government procurement for any item related to that nodal Ministryshall not be allowed to participate in Government procurement in India forall items related to that nodal Ministry/Department, except for the list ofitems published by the Ministry/Department permitting their participation.The term entity of a country shall have the same meaning as under theFDI Policy of DPIIT as amended from time to time\".6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document DescriptionBIDDOCUMENTPART-1 Bid Document Part IIOCT17UPTOCORR.NO.22.pdfBIDDOCUMENTPART-IIPAGE1-2 Bid Document Part II Page 1 to 100100.pdfBIDDOCUMENTPART-3 Bid Document Part II Page101 to 148IIPAGE101-148_1.pdf4 SpecialCond.G-107152.pdf Special Conditions of Tender5 SplitingConditionsofSimulator.pdf Spliting Conditions of Tender7. RESPONSIVENESSS.No. Description1 Validity of Offer: No deviation from the offer validity period stipulated in the tender is permitted.This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued byDepartment of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions ofGFR regarding procurement through GeM.Digitally Signed By SSE/Prtg. ( VINEET KUMAR ) |
| 10 | Cost of Comprehensive Annual Maintenance Contract [AMC] for Simulator for eight years afterexpiry of warranty of two years as per clause 27 of Section-III of Bid Document Part-II Warranty Period: 2 years, AMC Period: 8 years, Rate of Discounting: 10 %AS PER SCHEDULE-I OF BID As per tender Conditions 3.00 NumbersAt (Location)DOCU PT-II5 OS1 Optional Non Stock --- No CONSIGNEE INR (BM2) Services (Y)Page 2 of 6 Run Date/Time: 26/09/2022 17:37:18STORES/COFMOW |
| 11 | Cost of Annual Maintenance Contract (AMC) of Simulator Building as per clause 21 of Section-III ofBid Document Part-II.AS PER SCHEDULE-I OF BID As per tender Conditions 00 NumbersAt (Location)DOCU PT-II |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail