Providing Irrigation Facility Under Hp Shiva Project For Kunihar And Nalagarh Block District Solan Himachal Pradesh Package 1
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Oct 2022
0 days left
EMD
52.80 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nalagarh → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Providing Irrigation Facility Under Hp Shiva Project For Kunihar And Nalagarh Block District Solan Himachal Pradesh Package 1
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 27-Sep-2022 | Cancellation | Technical Bid | 27-Oct-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Civil Work |
| 2 | RCC Check Dam: Designing, Constructing, Testing & Commissioning( to be approved by the competent authority) and Construction ofRCC Check Damas perdrawingscomplete in all respects to the entire satisfaction of the Engineer-in-charge. The contractor shall provide 6 sets of approved drawing and design with one soft copy to the department.for the following size- |
| 3 | 15 meter length and 2.0meter depth, At LIS Ser-Delag,LIS Datti and LIS Giana |
| 4 | 20 meter length and 2.0 meter depth, At LIS Sai, LIS Daseran, LIS Pajeena and LIS Chunad |
| 5 | RCC Intake Structure at LIS Jailang:-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC intake Structureas perdrawings, having RCCstructure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling ,MCB DBs,receptacle system & accessories etc., Walk way/ passage CI Rungs inside the structure from top to bottom and steel stair case from ground level to top of intake with connecting path having suitable capacity crane/ hoist arrangement for handlingof pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-1 |
| 6 | RCC Intake Structure at LIS Doli::-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC intake Structureas perdrawings, having RCCstructure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling ,MCB DBs,receptacle system & accessories etc., Walk way/ passage CI Rungs inside the structure from top to bottom and steel stair case from ground level to top of intake with connecting path having suitable capacity crane/ hoist arrangement for handlingof pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. for . Refer Data Sheet No-1 |
| 7 | Tube Well at LIS Palli and Beli Khol 1 :-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) of Tube Well as perdrawings includingallied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs & switchboards, receptacle system & accessories etc.,mono rail with chain pulley arrangement of suitable capacity for lowering/ lifting the pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. |
| 8 | Percolation well:- Designing, Constructing, Testing & Commissioning( to be approved by the competent authority) and Construction ofPercolation well with 3.00 mtr internal diameter and 9.00 mtr depth ,having RCC Circular structure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs, receptacles system & accessories etc., Walk way/passage CI Rungs inside the percolation from top to bottom and steel stair case from ground level to top of percolation well with connecting path having suitable capacity crane/ hoist arrangement for handling of pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-2 |
| 9 | Improvement of Kuchha Drainincluding survey, Soil investigation, cutting - Filling including excavation in all types of strata and foundation concrete, all labour and material charges,complete as per entire satisfaction of engineer-charge.At LIS Ser-Delag |
| 10 | PUMP HOUSE:- Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following locations including all allied Civil Works, Electrical Works including lighting fixtures, fans, street / area lighting using poles, associated cabling/ wiring, MCB DBs, receptacle system & accessories etc., Sanitary Work, Site Development, Cutting/ Excavation in all kinds of soils, c/o PCC/ RCC Retaining walls, Breast walls, Toilets, Septic Tanks, External Solar powered Street lighting, External landscaping, Fire Fighting arrangement, Building Lightning Protection System (where applicable), Gantry Crane, dewatering etc complete as directed by engineer in charge The rates quoted by the contractor shall be for the complete work. All ancillary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. Refer Data Sheet No-3 |
| 11 | Pump house of35.00 Sqm. Area -Kunihar Block |
| 12 | Pump house of35.00 Sqm. Area - Nalagarh Block |
| 13 | Pump house of70.00 Sqm. Area |
| 14 | Designing, Constructing, Testing & Commissioning of Desilting tank including civil work, Necessary valves & fittings, tube settler media etc. complete in all respect as per the drawings & technical specification.for the followings size- Refer Data Sheet No-4 |
| 15 | 48 KL Capacity at LIS Ser-Delag, LIS Chunad and LIS Doli |
| 16 | 36 KL Capacity at LIS Sai, LIS Datti, LIS Giana and LIS Pajeena |
| 17 | 27 KL Capacity at LIS Jailang |
| 18 | 64 KL Capacity at LIS Daseran |
| 19 | 140 KL Capacity at LIS Batiakh |
| 20 | 320 KL Capacity at LIS Sour |
| 21 | Designing, Constructing, Testing & Commissioningof Sump well including civil work, Necessary valves & fittings etc. complete in all respect as per the drawings & technical specification.for the followings size- |
| 22 | 18 KL Capacity at LIS Jailang, LIS Datti, LIS Giana and LIS Pajeena |
| 23 | 18 KL Capacity at LIS Palli and LIS Beli Khol-1 |
| 24 | 36 KL Capacity at LIS Daseran |
| 25 | 24 KL Capacity at LIS Chunad and LIS Doli |
| 26 | 64 KL Capacity at LIS Batiakh |
| 27 | 168 KL Capacity at LIS Sour |
| 28 | Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil includingbailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides,leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testingof pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoitedlayer by ramming & watering & then disposing of all surplus excavated soil /unusablematerial as directed with in all leads & lifts Excluding restoration metalled surfaces to its original condition( Will be paid Separately) & including cost of diversionfor traffic, night signals, fixing caution boards, crossingover trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge. |
| 29 | Kunihar Block |
| 30 | Nalagarh Block |
| 31 | Providing ,Laying,jointing & testing of screwed and socketted Galvanised Mild steel tube of approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter andclass including allspecials andfittings as required complete as per actual sitecondition with in all leads and lifts as per the direction and to the entire satisfactionof Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) . |
| 32 | 80 mm dia Kunihar Block |
| 33 | 80 mm dia Nalagarh Block |
| 34 | 100 mm dia Kunihar Block |
| 35 | 100 mm dia Nalagarh block |
| 36 | Providing ,Laying,jointing & testing ofGalvanised Mild steel tube with flange/Butt weldingof approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter andclass including allspecials andfittings as required complete as per actual sitecondition with in all leads and lifts as per the direction and to the entire satisfactionof Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) . |
| 37 | 125 mm dia Kunihar Block |
| 38 | 125 mm dia Nalagarh Block |
| 39 | 150 mm dia Kunihar Block |
| 40 | Providing, laying, jointingand testingof MS pipe, thickness 4.8 mm, MSERW flanged / Buttwelded joints by considering three layers pipes including cost of bends complete as per GMSERW Pipe conforming to IS / ISO: 3183-2007 of following grade & wall thicknesses as per dimensions, weights and test pressure mentioned below in a random length of 4 to 7 meters. The M.S.flanges are to be provided on each joint as per required table conforming to IS: 6392-1971 and welding of flanges with electrodes as per relevants codes including required number & size of nuts and bolts & gasket sheet not less than3mm thickness as per relevants codes.The welding offlanges to be done on both faces in two layers to make thejointsleak proofand to entire satisfaction of the Engineer-in-charge.The laying of pipe should be conformed toIS: 5822-1994. (Earth workin trenches to be measured and paid for separately). The pipe shallbe galvanising with zinc coating conforming to IS: 4736-1986.of following diameters:- |
| 41 | 125 mm dia 4.8 mm thick with Flange Table-5 Kunihar Block |
| 42 | 200 mm dia 4.8 mm thick with Flange Table-5 Nalagarh Block |
| 43 | Providing and fixing double flanged cast iron sluice valve of following dia of approved make of JSVto gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements. |
| 44 | 80 mm diaKunihar Block |
| 45 | 80 mm diaNalagarh Block |
| 46 | 100 mm dia Kunihar Block |
| 47 | 100 mm dia Nalagarh Block |
| 48 | 125mm dia Kunihar Block |
| 49 | 125mm dia Nalagarh Block |
| 50 | 150 mm dia Kunihar Block |
| 51 | 200 mm dia Nalagarh Block |
| 52 | Providing and fixing screwed/flanged CI air valve (Single/double ball type) of approved make of JSV conforming to BIS-1452-1990 with upto date ammendments as per class PN-1.0 withstanding a seat pressure 15 Kg/cm2 in rising main within all leads and lifts. 25mm Dia.Kunihar Block |
| 53 | Providing and fixing screwed/flanged CI air valve (Single/double ball type) of approved make of JSV conforming to BIS-1452-1990 with upto date ammendments as per class PN-1.0 withstanding a seat pressure 15 Kg/cm2 in rising main within all leads and lifts. 25mm Dia. Nalagarh Block |
| 54 | Providing and fixing double flanged cast iron Scour valve of following dia of approved make of JSV to gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements. |
| 55 | 80 mm dia Kunihar Block |
| 56 | 80 mm dia Nalagarh Block |
| 57 | Construction of AnchorBlock at every in CC 1:1.5:3 (1 cement :1.5 sand :3 graded stone add 20 mm NS) i/c cost of Excavation , form work , C.C work, and reinforcement & curing complete of tentative size 1.50m x 1.50m x 2.00m to provide support to rising main pipe after every 50 m length complete as per direction and to the entire satisfaction of Engineer -in-Charge with in all leads and lifts. (The RD wise structural design shall got approved from the competent autrhority prior to construction of Thrust/Anchor blocks). |
| 58 | Kunihar Block |
| 59 | Nalagarh Block |
| 60 | Designing, Constructing, Testing & Commissioning (to be approved by the competent authority) RCC Circularunder ground/partial under ground storage reservoirs as per capacity given below at various stages/sites including excavation in foundation in all kinds of soil. including PCC (1:3:6)in foundation and M:30 design mix in bottom slab/raft ,walls and beams. And RCC (1:1.5:3) in roof slab/dome with provision of inspection path around the dome with all alied Civil Works such as c/o chamber for valves,refilling and disposing of surplus excavated earthwith in all leads and lifts. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe with bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as MS ladders inside and outside, CI cowl type ventilator, SFRC manhole covers with frames of heavy duty with proper locking arrangement, water level indicator. The tanks shall be hydraulically tested for water tightness, All works shall be conforming to relevant IS code.The cost of valves, be included in the rates of tanks .complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-5 |
| 61 | 1.0 Lakh Litre CapacityKunihar Block |
| 62 | 1.5 Lakh Litre Capacity Kunihar Block |
| 63 | 2.0 Lakh Litre Capacity Kunihar Block |
| 64 | 3.0 Lakh Litre Capacity Kunihar Block |
| 65 | 1.0 Lakh Litre CapacityNalagarh Block |
| 66 | 2.0 Lakh Litre Capacity Nalagarh Block |
| 67 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level. |
| 68 | Kunihar Block |
| 69 | Nalagarh Block |
| 70 | Pumping Machinery |
| 71 | SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set ofKSB/ Crompton/Kirloskar/ BS/ Calamamake conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD dutyand its powershould be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working ), necessary piping,electro-mechanical flowmeter and control valves along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete workinclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge. |
| 72 | For Tube well at Beli kholLIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Under Ground Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 7LPS vi) Static Head in meters _14 mts. vii) Duty/Total head in Mts=25mts viii) Length of R/Main 34.00mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 7LPS each with 25 mhead |
| 73 | For Tube well at Palli LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Under Ground Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.5LPS vi) Static Head in meters _14 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main 31.00mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 8.5 LPS each with 25 mhead |
| 74 | SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set ofKSB/ Crompton/Kirloskar/ BS/ Calamamake conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD dutyand its powershould be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working ), necessary piping, eletro-mechanical flow meter and control valves along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete workinclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge. |
| 75 | From Intake Well to Desilting tank at Jailang LISi)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 7.5LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 24.00mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 7.5LPS each with 30 mhead |
| 76 | From P. Well to Desilting tankat Datti LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.6LPS vi) Static Head in meters _12 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main13.00mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 41LPS each with 20 mhead |
| 77 | From P. Well to Desilting tankat Daseran LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 15.8LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 2301 mts ix)Dia of R/Main=150 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 15.8LPS each with 30 mhead |
| 78 | From P. Well to Desilting tankat Pajeena LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.8LPS vi) Static Head in meters _23 mts. vii) Duty/Total head in Mts=35 mts viii) Length of R/Main 26 mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 8.8LPS each with 35 mhead |
| 79 | From P. Well to Desilting tankat Chunad LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 13.2LPS vi) Static Head in meters _65 mts. vii) Duty/Total head in Mts=75 mts viii) Length of R/Main 27 mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 13.2LPS each with 75 mhead |
| 80 | From Intake Well to Desilting tankatDoli LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 11.6LPS vi) Static Head in meters _21 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 15 mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 11.6LPS each with 30 mhead |
| 81 | From P. Well to Desilting tankat Batiakh LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 34.32LPS vi) Static Head in meters _13 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main 1846 mts ix)Dia of R/Main=200 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 34.32LPS each with 30 mhead |
| 82 | From P. Well to Desilting tankat Sour LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 85LPS vi) Static Head in meters _157 mts. vii) Duty/Total head in Mts=180mts viii) Length of R/Main 1846 mts ix)Dia of R/Main=300 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .3 sets (1 as stand by) of 85LPS each with 180 mhead |
| 83 | CENTRIFUGAL PUMP SETS- Supply Installation Testing & Commissioning ) of horizontal spindle, horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stage star rated centrifugal pump or combination of pumps, of recommended make such as Mather and Platt/KSB/Kirloskar as per BIS 1520-1980 with up to date amendments, read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characteristics with bronze, impellers/ priming funnels, casing ring and shaft sleeves of bronze, shaft of steel grade45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE3 or higher ) of standard make such as Kirloskar / BHEL / CG POWER / Siemens / ABB / Marathon and suitable for operation on 415V ± 10%, 50 Hz., 3 phase AC electric supply. The pump motor shall be VFD dutyand its power should be at least +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty point head. The motor/motors as per IS 12615 : 2011 with up to date amendments. The scope shall also includenecessary piping for suction, delivery & common header and eletro-magnetic flowmeter,along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.as per requirement of following pumping machinery; Complete workinclusive of all taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc.including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure andcomplete as per Tender Specifications and instruction of Engineer in charge. |
| 84 | At Jailang LIS 2 sets (1 as stand by) of 3.5 LPS each with 155 mTotalhead , 2900 RPM ,with 16 Hours Pumping |
| 85 | At Datti LIS2 sets (1 as stand by) of 5.0LPS each with 25mTotalhead, 2900 RPM with 16 Hours Pumping |
| 86 | AtDaseran LIS 2 sets (1 as stand by) of 12.20LPS each with 250 mTotalhead , 2900 RPM with 16 Hours Pumping |
| 87 | AtGiana LIS 2 sets (1 as stand by) of 2.5LPS each with 135 mTotalhead , 2900 RPM with 16 Hours Pumping |
| 88 | AtPajeena LIS 2 sets (1 as stand by) of 5.2LPS each with 75 mTotalhead , 2900 RPM with 16 Hours Pumping |
| 89 | AtChunad LIS 2 sets (1 as stand by) of 6.0LPS each with 165 mTotalhead , 2900 RPM with 16 Hours Pumping |
| 90 | AtDoli LIS 2 sets (1 as stand by) of 6.2LPS each with 225mTotalhead , 2900 RPM with 16 Hours Pumping |
| 91 | AtBatiakh LIS 3 sets (1 as stand by) of 34.32LPS each with195mTotalhead , 2900 RPM with 16 Hours Pumping |
| 92 | AtSour LIS 3 sets (1 as stand by) of 85.0LPS each with120mTotalhead , 2900 RPM with 16 Hours Pumping |
| 93 | AtPalli LIS 2 sets (1 as stand by) of 3.2 LPS each with110mTotalhead & 2 sets (1 as stand by) of 1.3 LPS each with90mTotalhead , 2900 RPM with 16 Hours Pumping |
| 94 | AtBeli Khol 1 LIS 2 sets (1 as stand by) of 3.7 LPS each with50mTotalhead , 2900 RPM with 16 Hours Pumping |
| 95 | INSTRUMENTATION, CONTROL & AUTOMATION WORK-Supply, installation, testing, integration, programming & commissioning of Instrumentation, Control & Automation system for Lift Irrigation including Level Transmitter with display, Level Indicator, Level Switch, Pressure Transmitter, Gauges, Actuated Valves, Flow Meter, micro PLC based Remote Terminal Unit (RTU) along with panel mounted 10” HMI, UPS, SPD, Instrumentation Cables, Cable Trays, Earthing system etc., necessary gateways with SIM card for remote data communication and all other ancillary works and accessories required to make the system fully functional as per user requirement . Scope includes for 13 new schemes ( LIS Ser-Delag, LIS Sai, LIS Giana, LIS Pajeena, LIS Datti, LIS Daseran, LIS Palli, LIS Bheli koli-1, LIS Sour, LIS Doli, LIS Batiakh, LIS Chunad and LIS Jailang ) Refer Data Sheet No-6 |
AI Tender Summary
Tender Timeline
Sep 27, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedOct 27, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 27, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender