Water Resources and Irrigation Government Departments Closing in 0 days TDR #34113969

Providing Irrigation Facility Under Hp Shiva Project For Kunihar And Nalagarh Block District Solan Himachal Pradesh Package 1

Issued by Government Departments · nalagarh, Himachal Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Oct 2022
0 days left
EMD
52.80 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
nalagarh → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Providing Irrigation Facility Under Hp Shiva Project For Kunihar And Nalagarh Block District Solan Himachal Pradesh Package 1

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 27-Sep-2022 Cancellation Technical Bid 27-Oct-2022

BOQ

Name of Work: Providing Irrigation Facility under HP SHIVA Project for Kunihar and Nalagarh Block, District Solan (Himachal Pradesh) – Package - 1
Sl. No. Item Description
1Civil Work
2RCC Check Dam: Designing, Constructing, Testing & Commissioning( to be approved by the competent authority) and Construction ofRCC Check Damas perdrawingscomplete in all respects to the entire satisfaction of the Engineer-in-charge. The contractor shall provide 6 sets of approved drawing and design with one soft copy to the department.for the following size-
315 meter length and 2.0meter depth, At LIS Ser-Delag,LIS Datti and LIS Giana
420 meter length and 2.0 meter depth, At LIS Sai, LIS Daseran, LIS Pajeena and LIS Chunad
5RCC Intake Structure at LIS Jailang:-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC intake Structureas perdrawings, having RCCstructure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling ,MCB DBs,receptacle system & accessories etc., Walk way/ passage CI Rungs inside the structure from top to bottom and steel stair case from ground level to top of intake with connecting path having suitable capacity crane/ hoist arrangement for handlingof pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-1
6RCC Intake Structure at LIS Doli::-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) ofRCC intake Structureas perdrawings, having RCCstructure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling ,MCB DBs,receptacle system & accessories etc., Walk way/ passage CI Rungs inside the structure from top to bottom and steel stair case from ground level to top of intake with connecting path having suitable capacity crane/ hoist arrangement for handlingof pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. for . Refer Data Sheet No-1
7Tube Well at LIS Palli and Beli Khol 1 :-Designing, Constructing, Testing & Commissioning(to be approved by the competent authority) of Tube Well as perdrawings includingallied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs & switchboards, receptacle system & accessories etc.,mono rail with chain pulley arrangement of suitable capacity for lowering/ lifting the pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge.
8Percolation well:- Designing, Constructing, Testing & Commissioning( to be approved by the competent authority) and Construction ofPercolation well with 3.00 mtr internal diameter and 9.00 mtr depth ,having RCC Circular structure, Roofing with RCC slab, allied electrication work including lighting fixtures, fans, street / area lighting using poles, associated wiring/ cabling, MCB DBs, receptacles system & accessories etc., Walk way/passage CI Rungs inside the percolation from top to bottom and steel stair case from ground level to top of percolation well with connecting path having suitable capacity crane/ hoist arrangement for handling of pumping machinery complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-2
9Improvement of Kuchha Drainincluding survey, Soil investigation, cutting - Filling including excavation in all types of strata and foundation concrete, all labour and material charges,complete as per entire satisfaction of engineer-charge.At LIS Ser-Delag
10PUMP HOUSE:- Designing, Constructing, Testing & Commissioning of Pump House & Chowkidar Room at following locations including all allied Civil Works, Electrical Works including lighting fixtures, fans, street / area lighting using poles, associated cabling/ wiring, MCB DBs, receptacle system & accessories etc., Sanitary Work, Site Development, Cutting/ Excavation in all kinds of soils, c/o PCC/ RCC Retaining walls, Breast walls, Toilets, Septic Tanks, External Solar powered Street lighting, External landscaping, Fire Fighting arrangement, Building Lightning Protection System (where applicable), Gantry Crane, dewatering etc complete as directed by engineer in charge The rates quoted by the contractor shall be for the complete work. All ancillary works and accessories required to make the system fully functional shall be included in the cost of work. Nothing extra shall be paid on this account. Refer Data Sheet No-3
11Pump house of35.00 Sqm. Area -Kunihar Block
12Pump house of35.00 Sqm. Area - Nalagarh Block
13Pump house of70.00 Sqm. Area
14Designing, Constructing, Testing & Commissioning of Desilting tank including civil work, Necessary valves & fittings, tube settler media etc. complete in all respect as per the drawings & technical specification.for the followings size- Refer Data Sheet No-4
1548 KL Capacity at LIS Ser-Delag, LIS Chunad and LIS Doli
1636 KL Capacity at LIS Sai, LIS Datti, LIS Giana and LIS Pajeena
1727 KL Capacity at LIS Jailang
1864 KL Capacity at LIS Daseran
19140 KL Capacity at LIS Batiakh
20320 KL Capacity at LIS Sour
21Designing, Constructing, Testing & Commissioningof Sump well including civil work, Necessary valves & fittings etc. complete in all respect as per the drawings & technical specification.for the followings size-
2218 KL Capacity at LIS Jailang, LIS Datti, LIS Giana and LIS Pajeena
2318 KL Capacity at LIS Palli and LIS Beli Khol-1
2436 KL Capacity at LIS Daseran
2524 KL Capacity at LIS Chunad and LIS Doli
2664 KL Capacity at LIS Batiakh
27168 KL Capacity at LIS Sour
28Excavation in foundation, trenches (for pipes & pits) upto all depths in all classification of earth work such as pick work, jumper work, saturated soil includingbailing and pumping out water, blasting soft/ hard rock or chieselling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides,leveling of beds to correct grade i/c shoring /strutting , planking, timbering & dewatering wherever required, stacking the useable & unuseable material /soil separately & after laying jointing & testingof pipes, returning the useable soil in trenches in 15 cm layers including consolidating of such deposoitedlayer by ramming & watering & then disposing of all surplus excavated soil /unusablematerial as directed with in all leads & lifts Excluding restoration metalled surfaces to its original condition( Will be paid Separately) & including cost of diversionfor traffic, night signals, fixing caution boards, crossingover trenches for access to houses, fencing etc. complete in all respects with in all leads & lifts as per directions of Engineer-in-charge.
29Kunihar Block
30Nalagarh Block
31Providing ,Laying,jointing & testing of screwed and socketted Galvanised Mild steel tube of approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter andclass including allspecials andfittings as required complete as per actual sitecondition with in all leads and lifts as per the direction and to the entire satisfactionof Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) .
3280 mm dia Kunihar Block
3380 mm dia Nalagarh Block
34100 mm dia Kunihar Block
35100 mm dia Nalagarh block
36Providing ,Laying,jointing & testing ofGalvanised Mild steel tube with flange/Butt weldingof approved make or by JSV Deptt (list attached) conforming to BIS 1239-2004 ( with upto date ammendements ) of following diameter andclass including allspecials andfittings as required complete as per actual sitecondition with in all leads and lifts as per the direction and to the entire satisfactionof Engineer-in Charge. The pipe shall be factory galvanized as per IS: 4736-1986 (with up to date ammendements) .
37125 mm dia Kunihar Block
38125 mm dia Nalagarh Block
39150 mm dia Kunihar Block
40Providing, laying, jointingand testingof MS pipe, thickness 4.8 mm, MSERW flanged / Buttwelded joints by considering three layers pipes including cost of bends complete as per GMSERW Pipe conforming to IS / ISO: 3183-2007 of following grade & wall thicknesses as per dimensions, weights and test pressure mentioned below in a random length of 4 to 7 meters. The M.S.flanges are to be provided on each joint as per required table conforming to IS: 6392-1971 and welding of flanges with electrodes as per relevants codes including required number & size of nuts and bolts & gasket sheet not less than3mm thickness as per relevants codes.The welding offlanges to be done on both faces in two layers to make thejointsleak proofand to entire satisfaction of the Engineer-in-charge.The laying of pipe should be conformed toIS: 5822-1994. (Earth workin trenches to be measured and paid for separately). The pipe shallbe galvanising with zinc coating conforming to IS: 4736-1986.of following diameters:-
41125 mm dia 4.8 mm thick with Flange Table-5 Kunihar Block
42200 mm dia 4.8 mm thick with Flange Table-5 Nalagarh Block
43Providing and fixing double flanged cast iron sluice valve of following dia of approved make of JSVto gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements.
4480 mm diaKunihar Block
4580 mm diaNalagarh Block
46100 mm dia Kunihar Block
47100 mm dia Nalagarh Block
48125mm dia Kunihar Block
49125mm dia Nalagarh Block
50150 mm dia Kunihar Block
51200 mm dia Nalagarh Block
52Providing and fixing screwed/flanged CI air valve (Single/double ball type) of approved make of JSV conforming to BIS-1452-1990 with upto date ammendments as per class PN-1.0 withstanding a seat pressure 15 Kg/cm2 in rising main within all leads and lifts. 25mm Dia.Kunihar Block
53Providing and fixing screwed/flanged CI air valve (Single/double ball type) of approved make of JSV conforming to BIS-1452-1990 with upto date ammendments as per class PN-1.0 withstanding a seat pressure 15 Kg/cm2 in rising main within all leads and lifts. 25mm Dia. Nalagarh Block
54Providing and fixing double flanged cast iron Scour valve of following dia of approved make of JSV to gravity main confirming to BIS: 780-1984 Class PN 1.00 having seat pressureof 10.20 Kg/cm² with M.SFlanges of table -5 with up to date ammendements.
5580 mm dia Kunihar Block
5680 mm dia Nalagarh Block
57Construction of AnchorBlock at every in CC 1:1.5:3 (1 cement :1.5 sand :3 graded stone add 20 mm NS) i/c cost of Excavation , form work , C.C work, and reinforcement & curing complete of tentative size 1.50m x 1.50m x 2.00m to provide support to rising main pipe after every 50 m length complete as per direction and to the entire satisfaction of Engineer -in-Charge with in all leads and lifts. (The RD wise structural design shall got approved from the competent autrhority prior to construction of Thrust/Anchor blocks).
58Kunihar Block
59Nalagarh Block
60Designing, Constructing, Testing & Commissioning (to be approved by the competent authority) RCC Circularunder ground/partial under ground storage reservoirs as per capacity given below at various stages/sites including excavation in foundation in all kinds of soil. including PCC (1:3:6)in foundation and M:30 design mix in bottom slab/raft ,walls and beams. And RCC (1:1.5:3) in roof slab/dome with provision of inspection path around the dome with all alied Civil Works such as c/o chamber for valves,refilling and disposing of surplus excavated earthwith in all leads and lifts. The job also includes providing lowering, laying, erecting, hoisting and jointing of pipe assembly for inlet, outlet, overflow and scour pipe with bye pass arrangement consisting of GI / MS pipes special and valves of required classes and dia and all other accessories required such as MS ladders inside and outside, CI cowl type ventilator, SFRC manhole covers with frames of heavy duty with proper locking arrangement, water level indicator. The tanks shall be hydraulically tested for water tightness, All works shall be conforming to relevant IS code.The cost of valves, be included in the rates of tanks .complete in all respects to the entire satisfaction of the Engineer-in-charge. Refer Data Sheet No-5
611.0 Lakh Litre CapacityKunihar Block
621.5 Lakh Litre Capacity Kunihar Block
632.0 Lakh Litre Capacity Kunihar Block
643.0 Lakh Litre Capacity Kunihar Block
651.0 Lakh Litre CapacityNalagarh Block
662.0 Lakh Litre Capacity Nalagarh Block
67Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level.
68Kunihar Block
69Nalagarh Block
70Pumping Machinery
71SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set ofKSB/ Crompton/Kirloskar/ BS/ Calamamake conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD dutyand its powershould be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working ), necessary piping,electro-mechanical flowmeter and control valves along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete workinclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.
72For Tube well at Beli kholLIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Under Ground Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 7LPS vi) Static Head in meters _14 mts. vii) Duty/Total head in Mts=25mts viii) Length of R/Main 34.00mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 7LPS each with 25 mhead
73For Tube well at Palli LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Under Ground Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.5LPS vi) Static Head in meters _14 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main 31.00mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 8.5 LPS each with 25 mhead
74SUBMERSIBLE PUMP SETS- Supply Installation Testing & Commissioning of submersible pumping set ofKSB/ Crompton/Kirloskar/ BS/ Calamamake conforming to latest relevant BIS Code 8034:1976. The impeller of pump shall be directly mounted on extended submersible squirrel cage motor shaft conforming to BIS 9283-1979 with up to date amendments, totally dust and weather proof with detach able pump casing for easy inspection with double mechanical seal, grease/ oil lubricated bearings and provided with stainless steel thrust bearing plate to withstand vertical loads with minimum wear and tear, It should be fitted with device to take up expansion of water on heating of motor & suitable for operation on 415V ± 10%, 3 Phase 50 Hz AC supply. The pump motor shall be VFD dutyand its powershould be at least 10% in excess of maximum power required by the pump in complete operating range with mounting stand/ duck foot bend, steel guide wire with mounting hook, lowering chain and standard accessories as supplied by the manufacturers complete, suitable for fulfilling the following requirements:-including Pump sets (working ), necessary piping, eletro-mechanical flow meter and control valves along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.,as per requirement of pumping machinery; complete workinclusive of all taxes, insurance, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores/ site, stacking, etc.including specials and wastage etc.; complete as per Tender Specifications, technical data Sheets and instruction of Engineer in charge.
75From Intake Well to Desilting tank at Jailang LISi)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 7.5LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 24.00mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 7.5LPS each with 30 mhead
76From P. Well to Desilting tankat Datti LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.6LPS vi) Static Head in meters _12 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main13.00mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 41LPS each with 20 mhead
77From P. Well to Desilting tankat Daseran LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 15.8LPS vi) Static Head in meters _20 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 2301 mts ix)Dia of R/Main=150 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 15.8LPS each with 30 mhead
78From P. Well to Desilting tankat Pajeena LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 8.8LPS vi) Static Head in meters _23 mts. vii) Duty/Total head in Mts=35 mts viii) Length of R/Main 26 mts ix)Dia of R/Main=100 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 8.8LPS each with 35 mhead
79From P. Well to Desilting tankat Chunad LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre, v) Discharge at Duty Point= 13.2LPS vi) Static Head in meters _65 mts. vii) Duty/Total head in Mts=75 mts viii) Length of R/Main 27 mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 13.2LPS each with 75 mhead
80From Intake Well to Desilting tankatDoli LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 11.6LPS vi) Static Head in meters _21 mts. vii) Duty/Total head in Mts=30mts viii) Length of R/Main 15 mts ix)Dia of R/Main=125 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 11.6LPS each with 30 mhead
81From P. Well to Desilting tankat Batiakh LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 34.32LPS vi) Static Head in meters _13 mts. vii) Duty/Total head in Mts=20mts viii) Length of R/Main 1846 mts ix)Dia of R/Main=200 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .2 sets (1 as stand by) of 34.32LPS each with 30 mhead
82From P. Well to Desilting tankat Sour LIS i)Rated Voltage :-415V ± 10% iii) Charactrstics of water:-Raw Water) Temperature_20_ °C,b) Turbidityupto 100 NTU, c) pH 6.5 to 8d ) Total solids :-600mg/litre,v) Discharge at Duty Point= 85LPS vi) Static Head in meters _157 mts. vii) Duty/Total head in Mts=180mts viii) Length of R/Main 1846 mts ix)Dia of R/Main=300 mm x)Pumping hours per day- 16 hours xi) Limits ofpump operation (-) 15% to (+) 10% ofTotal headat duty point xii)HP of motor /Drive unit ---,Power absorbed or Required BHP at (-) 15% ofDuty heador BHP withmargins/multiplying factorat duty point & (+) 10% head , whichever is higher i.e Upto 2 HP = 1.5 ,2to 5 HP= 1.4,5 to 10 HP =1.3 , 10 to 20 HP=1.2,20 to100 HP =1.15, Above 100 HP=1.10xiii) Efficiency at duty pointMinimum 60% xiv) R.P.M.of Pumping set -2900, xv) Test Run-24 hours continueously for 7 days. .3 sets (1 as stand by) of 85LPS each with 180 mhead
83CENTRIFUGAL PUMP SETS- Supply Installation Testing & Commissioning ) of horizontal spindle, horizontal/redial split casing/end suction(Back-pull out arrangements) single/double/multi stage star rated centrifugal pump or combination of pumps, of recommended make such as Mather and Platt/KSB/Kirloskar as per BIS 1520-1980 with up to date amendments, read with IS:9137-1978 or latest edition suitable for lifting water for under mentioned characteristics with bronze, impellers/ priming funnels, casing ring and shaft sleeves of bronze, shaft of steel grade45C8/ EN8 with cast iron casing coupled directly through a flexible coupling on a common MS Base Plate to squirrel cage TEFC Energy efficient motors (Conforming to energy efficiency code IE3 or higher ) of standard make such as Kirloskar / BHEL / CG POWER / Siemens / ABB / Marathon and suitable for operation on 415V ± 10%, 50 Hz., 3 phase AC electric supply. The pump motor shall be VFD dutyand its power should be at least +10% in excess of the maximum power required by the pump/pumps in the operation range of (+) 10% and (-)15%of the duty point head. The motor/motors as per IS 12615 : 2011 with up to date amendments. The scope shall also includenecessary piping for suction, delivery & common header and eletro-magnetic flowmeter,along with electrical works including indoor & outdoorHT/LT switchboards/ PCC, Soft Starter Cubicle(VFD) with suitable bypass arrangement, HT/LT Cabling system complete with end terminations, cable trays & accessories, Earthing system with maintenance free earth electrodes, 415/ 230V small power distribution boards, local push button stations, Junction Boxes, Power/ Welding receptacles and its associated wiring/ cabling etc.as per requirement of following pumping machinery; Complete workinclusive of all taxes, transportation, freight charges, inspection charges, loading, unloading, conveyance to Departmental stores / site, stacking, etc.including specials and wastage etc. It shall include providing and fixing of C.I/C.S Sluice valves of approved make and appropriate class to resist the design pressure andcomplete as per Tender Specifications and instruction of Engineer in charge.
84At Jailang LIS 2 sets (1 as stand by) of 3.5 LPS each with 155 mTotalhead , 2900 RPM ,with 16 Hours Pumping
85At Datti LIS2 sets (1 as stand by) of 5.0LPS each with 25mTotalhead, 2900 RPM with 16 Hours Pumping
86AtDaseran LIS 2 sets (1 as stand by) of 12.20LPS each with 250 mTotalhead , 2900 RPM with 16 Hours Pumping
87AtGiana LIS 2 sets (1 as stand by) of 2.5LPS each with 135 mTotalhead , 2900 RPM with 16 Hours Pumping
88AtPajeena LIS 2 sets (1 as stand by) of 5.2LPS each with 75 mTotalhead , 2900 RPM with 16 Hours Pumping
89AtChunad LIS 2 sets (1 as stand by) of 6.0LPS each with 165 mTotalhead , 2900 RPM with 16 Hours Pumping
90AtDoli LIS 2 sets (1 as stand by) of 6.2LPS each with 225mTotalhead , 2900 RPM with 16 Hours Pumping
91AtBatiakh LIS 3 sets (1 as stand by) of 34.32LPS each with195mTotalhead , 2900 RPM with 16 Hours Pumping
92AtSour LIS 3 sets (1 as stand by) of 85.0LPS each with120mTotalhead , 2900 RPM with 16 Hours Pumping
93AtPalli LIS 2 sets (1 as stand by) of 3.2 LPS each with110mTotalhead & 2 sets (1 as stand by) of 1.3 LPS each with90mTotalhead , 2900 RPM with 16 Hours Pumping
94AtBeli Khol 1 LIS 2 sets (1 as stand by) of 3.7 LPS each with50mTotalhead , 2900 RPM with 16 Hours Pumping
95INSTRUMENTATION, CONTROL & AUTOMATION WORK-Supply, installation, testing, integration, programming & commissioning of Instrumentation, Control & Automation system for Lift Irrigation including Level Transmitter with display, Level Indicator, Level Switch, Pressure Transmitter, Gauges, Actuated Valves, Flow Meter, micro PLC based Remote Terminal Unit (RTU) along with panel mounted 10” HMI, UPS, SPD, Instrumentation Cables, Cable Trays, Earthing system etc., necessary gateways with SIM card for remote data communication and all other ancillary works and accessories required to make the system fully functional as per user requirement . Scope includes for 13 new schemes ( LIS Ser-Delag, LIS Sai, LIS Giana, LIS Pajeena, LIS Datti, LIS Daseran, LIS Palli, LIS Bheli koli-1, LIS Sour, LIS Doli, LIS Batiakh, LIS Chunad and LIS Jailang ) Refer Data Sheet No-6

AI Tender Summary

OUR REF NO 34113969
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 27-10-2022
Authority
Authority Name Irrigation And Public Health Department
Work Description Providing Irrigation Facility Under Hp Shiva Project For Kunihar And Nalagarh Block District Solan Himachal Pradesh Package 1
Basic Detail
Tender No 10819-69 dated 26-09-2022
Bidding Type Tender
Location
City nalagarh
State Himachal Pradesh
Key Dates
Publish Date 27 Sep 2022
Submission Date 27 Oct 2022
Open Date 27 Oct 2022
Finance
Tender Value Ref. Documents
Tender Fee 10000
EMD 52.80 Lakhs
Exemption Not Available
Document List
BOQ_98739.xls
COVERPAGE.pdf
DRAWINGPart1.pdf
1258d46f-97d9-4e6b-b61e-40f6291bcc5d.html
AnnexureAInitialEnvironme.pdf
DRAWINGPart2.pdf
Section7to9.pdf
Section1to6.pdf
section6annexure1to11.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 27, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 27, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 27, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_98739.xls

pdf

COVERPAGE.pdf

pdf

DRAWINGPart1.pdf

html

1258d46f-97d9-4e6b-b61e-40f6291bcc5d.html

pdf

AnnexureAInitialEnvironme.pdf

pdf

DRAWINGPart2.pdf

pdf

Section7to9.pdf

pdf

Section1to6.pdf

pdf

section6annexure1to11.pdf

pdf

Tendernotice_1.pdf