Construction Of 2Nd Floor Of Guest House Building With Renovation Of Other Floors And Construction Of Chemical Lab Building At Base Camp Of Gandhamardan In The District Of Keonjhar., Kendujhar-Odisha

Orissa Mining Corporation Limited has published Construction Of 2Nd Floor Of Guest House Building With Renovation Of Other Floors And Construction Of Chemical Lab Building At Base Camp Of Gandhamardan In The District Of Keonjhar.. Submission Date for this Tender is 10-10-2022. Flooring Work Tenders in Kendujhar Odisha. Bidders can get complete Tender details and download the document.




Tender Notice

34113631
Construction Of 2Nd Floor Of Guest House Building With Renovation Of Other Floors And Construction Of Chemical Lab Building At Base Camp Of Gandhamardan In The District Of Keonjhar.
Open Tender
Indian
Odisha
Kendujhar
10-10-2022

Tender Details

Construction Of 2Nd Floor Of Guest House Building With Renovation Of Other Floors And Construction Of Chemical Lab Building At Base Camp Of Gandhamardan In The District Of Keonjhar.

Key Value

Document Fees
INR 11800 /-
EMD
Refer document
Tender Value
INR 2.29 Crore /-

BOQ Items

Name of Work: Construction of 2nd floor and renovation of Guest House and construction of Chemical Lab Building at Base Camp Gandhamardan in the district of Keonjhar
Sl. No. Item Description
1Civil Component Guest house
2Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. lead etc. complete as per the direction of EIC. Ground Floor
3Earth work in excavation of foundation trenches in all kinds of soil including moorum, stony earth, earth mixed with stone boulder (except sheet rock and rock boulder requiring blasting) including dressing and leveling the bed and depositing the excavated materials at places away from the work site with all leads, lifts, T&P required for the work complete as per direction of EIC.
4Filling foundation and plinth with river sand, well watered, rammed including cost, conveyance, royalties of materials, cost of all labour and T&P required for the work etc. complete as per direction of EIC.
5PCC of prop (1:3:6)in road base using 40mm size black hard granite metal of approved quality from approved quarry including lowering, laying concrete to required levels laid in layers not exceeding 150mm thick including centering & shuttering cost, conveyance, royaltiesof all materials, watering and curing and cost of all labour, T&P required to complete the work etc. as per direction of EIC.
6Fly ash brick masonry in C.M.(1:6)having minimum crushing strength of 75 Kg/Cm2 and size of 25cm x 12cm x 8cm in foundation & plinth with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. Ground Floor
7R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Column Footing & Pedestral Ground Floor
8R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Grade Beam Ground Floor
9R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Column above plinth (Rectangular/Sqare) Ground Floor
10R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Column above plinth (Circular) Ground Floor
11R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Roof Beam Ground Floor
12R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost,conveyance,royalitiesof all material, dismantling the centering, shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. In Roof Slab Ground Floor
13Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respect as directed by the EIC.Ground Floor
146mm thick cement plaster (1:4) to RCC surfaces/ ceiling finished smooth including closed deep chiping and slury treatment including watering and curing etc. Comp. with cost , conveyance, of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC. Ground Floor
1512mm (1/2") thick cement plaster (1:4) for finished smooth to surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. Ground Floor
16Providing all labour for foming grooves of 20x12 mm of Uniform size in the top layer of plaster as per approved pattern using wooden batten nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specification and direction of EIC.Ground Floor
17Providing anchor bar grouting with approved size bore of required depth and filled with over size hole of 150mm to200mm deep grout epoxy and polymer modified (The compressive strength of the grout must exceed 50N/mm2 at 7 days and 60 N/mm2 at 28 days) with cost, conveyance of all materials, cost of all labour, T&P, scaffolding required for the work complete as per direction of EIC. (Make: Fosrock / Hilty / Dr. Fixit)12mm dia (16mm hole) Ground Floor
18Providing anchor bar grouting with approved size bore of required depth and filled with over size hole of 150mm to200mm deep grout epoxy and polymer modified (The compressive strength of the grout must exceed 50N/mm2 at 7 days and 60 N/mm2 at 28 days) with cost, conveyance of all materials, cost of all labour, T&P, scaffolding required for the work complete as per direction of EIC. (Make: Fosrock / Hilty / Dr. Fixit)8mm dia (10mm hole) Ground Floor
1916mm (5/8") thick cement plaster with (1:6) for finished rough surface of brick wallsafter racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC.Ground Floor
20Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) Ground Floor
21Providing two coats of plastic emulsion painting of approved shade (Washable type) to give an even shade to surface of wall, including cost, conveyance of all materials, cost of all labour, T&P required for the work etc. complete as directed by EIC.( Paints of Berger/ ICI/ Nerolac to be used) . Ground Floor
22Weather coat two coats of approved brand and shade over a coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger / Asian is to be used)Ground Floor
23Filling in foundation and plinth with excavated earth or moorum or extra good earth including laying, watering and ramming in 23 Cm (9") thick layers with all necessary leads and lifts complete inclusive cost of all labour T&P and required to complete as per direction of EIC.Ground Floor
24Supplying all materials for making, fitting and fixing offlower leaves made with GRS moulded approved design and fixed with adhesive and nail in proper position including necessary staging. This included all cost of materials, T&P etc. complete as per direction of EIC. Ground Floor
25Providing vitrified tile flooring using vitrified tileshaving thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 600mm Colour & Printed Series (homogeneous) of approved qualityof Somany/ Kajaria/ Asian / Johnson / Nucera / Oasison 25mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading and royalties of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Engineer-in-charge. (Ground Floor)
26Providing Granite stone prepolished black 20mm thick of areaabove 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings (Granite tiles 4"" strip horizental with 6mm level deference for wheel chair movement) over 25mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge.
27Providing Granite stone prepolished black 20mm thick of areaabove 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings over 25mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge.
28Scraping old paint to inside and outside with scrappers, sand papers and washing with soap water or soda including cost of all labour,T & P etc. required to complete as per direction of EIC. Ground Floor
29Supplying all materials for making Colomn base round shape turner as per design of architect using C.M (1:3) and finishing the surface including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. Ground Floor
30Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. lead etc. complete as per the direction of EIC. 1st floor
31Providing anchor bar grouting with approved size bore of required depth and filled with over size hole of 150mm to200mm deep grout epoxy and polymer modified (The compressive strength of the grout must exceed 50N/mm2 at 7 days and 60 N/mm2 at 28 days) with cost, conveyance of all materials, cost of all labour, T&P, scaffolding required for the work complete as per direction of EIC. (Make: Fosrock / Hilty / Dr. Fixit)8mm dia
32Fly ash brick masonry in C.M.(1:6) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 25cmx12cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, chambering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. 1st floor
33Fly ash brick masonry in C.M.(1:4) after immersing the bricks having minimum crushing strength of 75 Kg/Cm2 in water for 24 hours having size of 25cmx12cmx8cm in Superstructure with ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, chambering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC.1st floor
34Supplying and placing of 2nos of 6mm dia MS bar in half brick masonry wall horizontally in each 4th layer including cost of materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. 1st floor
35R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Column above plinth (Rectangular/Sqare) 1st floor
36R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Column above plinth (Circular) 1st floor
37R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Roof Beam 1st floor
38R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Lintel 1st floor
39R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. Roof Slab 1st floor
40R.C.C. work ofM-25 for beam and column having minimum compressive strength of 250Kg./cm2 in 15cm cubes at 28 days and in accordance with I.S. 456 and I.S. 516 using crusher broken hard black granite chips of approved quality & from approved quarry including hoisting, lowering, laying and compacting concrete with vibrator, watering and curing for 28 days, cost of rigid and smooth centering & shuttering and finishing to exposed surface smooth providing, grooves or beads wherever necessary including cost, conveyance & royalties of all materials and cost of all labour, T&P etc. as required for the work complete in all respects as per drawing, design and direction of Engineer-in-charge but excluding cost of M.S. rod/Tor steel and binding wires and labour charges for bending, binding and tying the grills. RCC Floor Beam 1st floor
41Supplying HYSDbars of appd. Quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work including cost, conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour, T&P and other materials required to comp. in all respectas directed by the EIC. 1st floor
42Dismantling and removing old tiled flooring including removing the base coarse and stacking the useful materials for reuse and removing the debris within 50m. lead etc. complete as per the direction of EIC. 1st floor
43Dismantling and removing old tiled cladding from walls including racking out joints 12mm dee stacking the useful materials for reuse and removing the debris within 50m. lead etc. complete as per the direction of EIC. 1st floor
44Providing vitrified tile flooring using vitrified tileshaving thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 600mm Colour & Printed Series (homogeneous) of approved qualityof Somany/ Kajaria/ Asian / Johnson / Nucera / Oasison 25mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading and royalties of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Engineer-in-charge.1st floor
45Supplying all materials, labour, T&P and fixing Ceramic glazed wall tile of 200mmx300mm size of approved brand and shade in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage, cost of all materials and cost of all labour, T&P required to complete the work. (Make:- Bell/ Somany/Cengress/ RAK) 1st floor
466mm thick cement plaster (1:4) to RCC surfaces/ ceiling finished smooth including closed deep chiping and slury treatment including watering and curing etc. Comp. with cost , conveyance, of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC.1st floor
4712mm (1/2") thick cement plaster (1:4) for finished smooth to surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC.1st floor
48Providing all labour for foming grooves of 20x12 mm of Uniform size in the top layer of plaster as per approved pattern using wooden batten nailed to the under layer, including removal of wooden battens, repair to the edges of panels and finishing the groove complete as per specification and direction of EIC. 1st floor
4916mm (5/8") thick cement plaster with (1:6) rough surface of brick walls including racking out the joints, watering and curing etc. Comp. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC. 1st floor
50Removing all type of shutters, doors, ventilator and windows partitions and frame work of any size and type with frame including stacking the same at site and disposing the debrises beyond the premises as directed by EIC including all leads and lifts etc. complete. 1st floor
51Supplying fitting fixing of 30 mm FRP shuuter with choukaths including cost of all materials, labour, all taxes, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. (inside should made with 2nd class wood frame) 1st floor
52SFF of Sal wood choukaths 5""x2.5"" Supply, fitting & fixing of dressed seasoned sal wood work framed and fixed (wrought and put up) in frames of doors, windows as per direction of EIC.1st floor
53Supplying fitting and fixing in position 32mm thick flush door with teak wood beading and 1mm thick sunmica to both side pasted with adhesive including fixing of fixtures like Godrej/Dorma make Mortice lock having model no 9168, Godrej/Dorma make floor spring, handle, tower bolt, stopper including cost of all materials, labour, all taxes, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. (Make- Ply & Lamination- Greenply/Archidply/Mayur) 1st floor
54Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) 1st floor
55Scraping old paints with scrappers, sand papering and washing the soap water or soda including scaffolding up to 5m height including cost of all labour, T&P required to complete as direction of EIC 1st floor
56Painting two coats with appd. Brand of Plastic emulsion paint of appd. Shade and quality over a coat of approved primer to inside wall including cost of paint, primer, putty, scaffolding, cost ofall labour and materials required for the work etc. comp. (paints of Berger/ J&N/Asian/ ICIBrand is to be used.). 1st floor
57Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used).1st floor
58Providing and fixing of factory made UPVC CIRCULAR VENTILATOR complete, comprising UPVC multi-chambered frame of size 67mm x 54mm with wall thickness of 2.3mm (+-0.2mm) having in-built UPVC roller track on top and UPVC sash of size 64mm x 47mm with wall thickness of 2.3mm (+-0.2mm) duly reinforced with G.I. section 1.2mm (+-0.2mm), wherever required. All corners of frame and sash will be fusion welded. After placing 5mm Clear Annealed glass in the sash, UPVC glazing bead, interlock, EPDM gasket, brush will be provided including hardware, i.e., touch lock and rollers & proper drainage system shall be provided. Window shall be fixed to the wall with 100mm long and 8mm dia. Fasteners and complete in all respect as per direction of Engineer-In-Charge. (Make:builtify/ Koemmerling / Encraft India Pvt. Ltd / Lingel windows and door technologies pvt ltd. / Torfenster)1st floor
59Dismantling brick or stone masonry in lime or cement mortar under 3m. Height including stacking the useful materials for reuse and removing the debris within 50m. lead etc. complete as per the direction of EIC. 2nd FLOOR
60Dismantling & removing RCC Column, slab of damaged Culvert, causeway, including stacking the useful materials for reuse and removing the debris within 50 m lead etc. complete as per direction of EIC 2nd FLOOR
61Providing anchor bar grouting with approved size bore of required depth and filled with over size hole of 150mm to200mm deep grout epoxy and polymer modified (The compressive strength of the grout must exceed 50N/mm2 at 7 days and 60 N/mm2 at 28 days) with cost, conveyance of all materials, cost of all labour, T&P, scaffolding required for the work complete as per direction of EIC. (Make: Fosrock / Hilty / Dr. Fixit)8mm dia 2nd FLOOR
62Removing old grading plaster from roof slab, cleaning the surface, lowering and removing the debris within 50m. lead etc. complete as per the direction of EIC.2nd FLOOR
63Fly ash brick masonry in C.M.(1:6) with the bricks of 25Cm x 12Cm x 8cm size having crushing strength not less than 75 Kg/Cm2 in super structure, ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. 2nd FLOOR
64Fly ash brick masonry in C.M.(1:4) with the bricks of 25Cm x 12Cm x 8cm size having crushing strength not less than 75 Kg/Cm2 in super structure, ornamental molding and other similar type of works with all necessary projections, splays corbelling, cutting, champering, including cost conveyance, royalties of all materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. 2nd FLOOR
65Supplying and placing of 2nos of 6mm dia MS bar in half brick masonry wall horizontally in each 4th layer including cost of materials, cost of all labour, T&P required for the work etc. compl. in all respect as per direction of EIC. 2nd FLOOR
66R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Column 2nd FLOOR
67R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Chajja 2nd FLOOR
68R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Roof Beam 2nd FLOOR
69R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Lintel 2nd FLOOR
70R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Roof Slab 2nd FLOOR
71R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in RCC Floor Beam 2nd FLOOR
72R.C.C M-25 grade concrete with 20mm & down graded hard crusher broken granite chips in all floors including hoisting and laying concrete,watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth,providing beads or grooves where necessary including cost,conveyance,royalitiesof all material,dismantling the centering,shuttering work after the period as specified byEIC and cost of all labour,T &P required for the work complete in all respect,excluding cost of reinforcement,binding wires and labour charges for bending,binding and tying the grills. in Stair 2nd FLOOR
73Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost,conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. 2nd FLOOR
74Providing vitrified tile flooring using vitrified tileshaving thickness of 8mm to 10mm conforming to IS 13756 of 1200mm x 600mm Colour & Printed Series (homogeneous) of approved qualityof Somany/ Kajaria/ Asian / Johnson / Nucera / Oasison 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with epoxy grout with required quantities of pigments of approved marks to match the shades of the vitrified tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading and royalties of all materials, cost of all labour, sundries, T&P required for the work, complete in all respect as per specification and direction of Engineer-in-charge. 2nd FLOOR
75Supplying all materials, labour, T&P and fixing Ceramic glazed wall tile of 200mmx300mm size of approved brand and shade in dados skirting on 12mm thick cement plaster (1:3) jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage, cost of all materials and cost of all labour, T&P required to complete the work. (Make:- Bell/ Somany/Cengress/ RAK)2nd FLOOR
766 mm thick cement plaster in C.M. (1:4) over RCC surface including watering, curing and cost, carriage of all materials, cost of all labour, T&P required to complete as per direction of EIC. 2nd FLOOR
7712mm (1/2”) thick cement plaster (1:4) over brick masonry wall in all floors after racking out the joints including watering and curing etc. complete with cost, conveyance, royalty and cost of all materials and cost of all labour, T&P, required for the work complete as per specification & direction of EIC.2nd FLOOR
7816mm (5/8") thick cement plaster with (1:6) for finished smooth to inside/outside surface of brick walls double layer if required after racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC. 2nd FLOOR
79Supplying fitting fixing of 30 mm FRP shuuter with choukaths including cost of all materials, labour, all taxes, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge. (inside should made with 2nd class wood frame) 2nd FLOOR
80Dressed seasoned salwood work framed and fixed (Wrought and put up) in frames of doors, windows and ventilators etc in all floors including cost carriage taxes of all materials, cost of all labour and T&P required to complete the work as per specification and direction of EIC.2nd FLOOR
81Providing, fitting and fixing of 32mm thick BWR flush door with both side lamination with 1mm thick laminates as per the specification complete with all materials, inclusive of all hardware material, hinges, nails, screws, doorknobs, handles, topper etc. including the cost of all materials, labour and T&P and overheads etc. complete. The exposed wood work shall be finished with automotive paint. two coats with primer. The rates also includes the cost of 40 x 25mm wooden beading for the partition in front of the door and finished with automotive paints and as per direction of EIC. (BWR board will be of Century / Gattani / Mayur/ National) 2nd FLOOR
82Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) 2nd FLOOR
83Providing two coats of plastic emulsion painting of approved shade (Washable type) to give an even shade to surface of wall, including cost, conveyance of all materials, cost of all labour, T&P required for the work etc. complete as directed by EIC.( Paints of Berger/ ICI/ Nerolac to be used) . 2nd FLOOR
84Weather coat two coats of approved brand and shade over a coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger / Asian is to be used)2nd FLOOR
85Providing and fixing of factory made UPVC CIRCULAR VENTILATOR complete, comprising UPVC multi-chambered frame of size 67mm x 54mm with wall thickness of 2.3mm (+-0.2mm) having in-built UPVC roller track on top and UPVC sash of size 64mm x 47mm with wall thickness of 2.3mm (+-0.2mm) duly reinforced with G.I. section 1.2mm (+-0.2mm), wherever required. All corners of frame and sash will be fusion welded. After placing 5mm Clear Annealed glass in the sash, UPVC glazing bead, interlock, EPDM gasket, brush will be provided including hardware, i.e., touch lock and rollers & proper drainage system shall be provided. Window shall be fixed to the wall with 100mm long and 8mm dia. Fasteners and complete in all respect as per direction of Engineer-In-Charge. (Make:builtify/ Koemmerling / Encraft India Pvt. Ltd / Lingel windows and door technologies pvt ltd. / Torfenster). 2nd FLOOR
86Providing and fixing of factory made uPVC Arch type top fixed and bottom Sliding window (White Colour) complete, comprising uPVC multi-chambered frame having in-built uPVC roller track on top and uPVC sash with wall thickness of 2.0mm (+-0.2 mm) duly reinforced with G.I. section 1.6 mm (+-0.2 mm), profile shall be manufactured from Tropicalized Blend with TiO2 and required additives. Profile must be colorfast and conform to standard EN12608. The profile sections should have multi hollow (min 2 to 3 chambers) chamber to include GI reinforcement with 120 GSM zinc coated, fitted in continuous length, in closed chamber. The thickness of GI should be selected to meet the wind load requirement as per IS 875- Part III on sash/mullion. Supplier should be submitting wind load calculation & validation complying with IS-875-III before material supply. Minimum steel reinforcement thickness of 1.2mm to 2.5mm. UPVC Windows & Doors must be fabricated with fusion welded corners & must conform to the strength requirements based on wind load as per IS 875-Part III. All hardware fitted should be Non-SS, except handles to be of zinc/Al. alloy casted with powder coated. Glass should be of 5mm single clear toughened Glass with weather seal (EPDM/TPE). After placing 5 mm Clear Toughned glass in the sash, uPVC glazing bead, interlock, EPDM gasket, brush shall be provided including touch lock( above 1500 mm Multi Lock ) and rollers & proper drainage system shall be provided. Window frame will be fixed to the wall with 100mm long and 8mm dia. Fasteners and after fixing frame the gap between frame & wall should be filled with silicon sealant (not more than 5 mm x 5 mm), complete in all respect as per direction of Engineer-In-Charge(Make LG/WINTECH/TECHNAL/BUILTIFY) 2nd FLOOR
87Supplying all materials, labour, T&P and fixing eathen tiles in slop roof of approved size, brand and shade on 12mm thick cement plaster (1:3) jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage, cost of all materials and cost of all labour, T&P required to complete the work. 2nd FLOOR
88Extra Labour and centering and shuttering for Construction of Dome in parapet as per approved drawing except cost of materials etc. complete as per direction of EIC. 2nd FLOOR
89Supplying, fitting and fixing of Cast Iron M.S balcony grills of approved design (as per I.S. specification and as per approved drawings) in proper position including making holes to brick walls/ R.C.C structure/wood work etc. and making good to the damagedwalls/ structures with cement concrete (1:2:4)with black hard crusher broken granite sTone chips of 12mm to 20mm size ( 20mm size not to exceeds 25% ) including watering and curing etc. complete in all respect as directed by the Engineer in charge. 2nd FLOOR
90Supplying and fixing Stainless steel hand rail of 304 grade etc complete including the cost, conveyance, taxes of all materials, labour, loading, unloading,,scaffoldings T&Petc. complete as per the direction ofEngineer-in-Charge. 2nd FLOOR
9120mm thick cement plaster with (1:4) for finished smooth to inside surface of stone wall in all floors racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC. 2nd FLOOR
92Supplying, fitting and fixing of Door lock with handle for doors including cost of all materials, labour, T&P to complete the work in all respect as per direction of EIC. (Make: Godrej / Hardwyn / Hattich) 2nd FLOOR
93Supplying, fitting and fixing of Round knob type keyless lock for doors including cost of all materials, labour, T&P to complete the work in all respect as per direction of EIC. (Make: Godrej / Hardwyn / Hattich) 2nd FLOOR
94Supplying, fitting and fixing of Hydraulic for doors including cost of all materials, labour, T&P to complete the work in all respect as per direction of EIC. (Make: Godrej / Hardwyn / Hattich) 2nd FLOOR
95Supplying all material labout T&P for making of Wardrobe Unit of 600mm depth made out of 19mm Plywood / Block board with 0.8mm laminate to inside and1mm thick approved laminates to outer surface of approved shade laminates with two side panels. The back panel is with 8mm thick WPC board. It should have multiple shutters according to the length & height. The shutter should be fixed on to the cabinet by required auto hinges and provision of two drawer units in each room. (Working drawing will be supplied by department) 2nd FLOOR (Ply/Block Board/Laminates should be -Mayur/Sylven/Green/Merino)
96Supplying all material labout T&P for making of Dressing Unit of 600mm depth with Full size Mirror provisin made out of 19mm Plywood / Block board with 0.8mm laminate to inside and1mm thick approved laminates to outer surface of approved shade laminates with two side panels. The back panel is with 19mm thick WPC board. Provision of two drawer units in each dressing unit. (Working drawing will be supplied by department) 2nd FLOOR (Ply/Block Board/Laminates should be -Mayur/Sylven/Green/Merino)
97TV Unit with bottom Tray 6"" Box The table top made out of 25mm Bothside Pre-laminated HDF board(Century / Green) having two side panels continuing up to the floor connected by a 18mm thick modesty panel. All exposed edges mechanicllay edge banded by matching 2mm thick edge banding tape (Rehau / Dolkin)with hot melt gule (Jowat / Henkel) finished by Througfeed Machine.All boring has to be done on CNC machine for precession of fittings. The entire furnitures will be knock down. All hardware fittings will be Hettich / Hafele / Ebco as per the application.Supply and installation of TV Unit as directed by Engineer-in-charge. 2nd FLOOR (Ply/Block Board/Laminates should be -Mayur/Sylven/Green/Merino)
98Providing & Fixing 150x150mm wide pelmet made out of 19mm plywood including top cover of 1mm approved laminates with cover bracket, Hollock wood clamp 50mm Rawl plug including, cost, conveyance of all materials, cost of all labour, T&P required to complete the work as per specification, drawing and design and direction of EIC. 2nd FLOOR (Ply/Block Board/Laminates should be -Mayur/Sylven/Green/Merino)
99Providing and Fixing Suspended 6mm thick Calcium silicate board false ceiling (make as per specification) includes providing and fixing GI perimeter channels of 0.55mm thick having one flange of 20mm & another of 30mm & web of 27mm along the perimeter of the ceiling screw fixed to back wall / partition with the help of nylon sleeves & screws at 610mm centers. The suspended GI intermediate channels of size 45mm, 0.9mm thick with two flanges of 15mm each from the soffit at 1220mm centres with ceiling angle of width 25mm x 10mm x 0.55mm thick fixed to soffit with GI cleat & steel expansion fasteners. Ceiling section of 0.55mm thick having web of 51.5mm & flanges of 20mm each with lips of 10.5mm 8mm calcium board are then fixed to the intermediate channels with the help of connecting clips and screws & in direction perpendicular to the intermediate channels with centresto ceiling section with 25mm wall screws at 230mm centres and joints are fixed with tape and finished smooth, complete asper direction of EIC all fittings of Gyproc make.
100Providing & Fixing of Armstrong Mineral Fibre Acoustical Suspended Ceiling System with DuneSupreme (Bevelled Tegular) Edge Tiles With Armstrong 15mmExposed GRID. The tiles should have Humidity Resistance (RH) of 99%, NRC 0.5, Light Reflectance =85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6 &7) in module size of 600 x 600 x 16mm , suitable for Green Building application, with Recycled content of 44%. The tile shall be laid on Armstrong Silhouette profile grid system with 15mm white flanges incorporating a 6mm central reveal in white/black colour and with a web height of 45mm and a load carrying capacity of minimum 15.68Kgs/M2 & minimum pull out strength of 100 Kgs..Silhouette, Main Runners & Cross Tees to have mitred ends & “birdsmouth” notches to provide mitred cruciform junctions. The T Sections have a Galvanizing of 90 grams per M2 and need to be installed with Suspension system of Armstrong make. The Tile & Grid system used together should carry a 30 year warranty.To comprise main runner spaced at 1200mm centres securely fixed to the structural soffit using Armstrong suspension system (specifications below) at 1200mm maximum centre.The First/Last Armstrong suspension system at the end of each main runner should not be greater than 450mm from the adjacent wall.Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200 x 600 mm module.Cut cross tees longer than 600mm require independent support.600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees.Perimeter trim to be Armstrong wall angles of size 3000x19x19mm, secured to walls at 450 mm maximum centres. 2nd FLOOR
101Providing and fixing Roller Blinds as per the approved sample comprising of optima screen Fabric comprising of 22% polyester, 78% PVC, Fabric weight 460-480G weight per sqm, Thickness 0.67 mm, Yarn count 18-19/cm, having fire resistance standard – NFPA 701-89 small testing ISO-5659-2 .The tear resistance should be complying to ISO4674 & breaking resistance – ISO 5081. The control clutch drive unit engineered heavy duty chain drive pulley operating system consisting of gear clutch housing and locking plug containing minimum 6 ribs and inserted at minimum of 37mm into roller tube. It is self lubricating Exclusive clutch with safety pins for secure bracket installation and unlocking pin for quick manual removal. Universal clutch is most convenient for large windows down to the smallest windows. It shall be driven by a ball chain pulley with ball chain and can be positioned at Right hand or Left hand side of the shade. Clutch gear ration 1.75:1 for reduced operating force on larger blinds.
102Water supply & Sanitary Installation Guest House
103Supplying all materials, labour, T&P for fitting & fixing and laying20mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Make:ORIPLAST/ Hariplast / Supreme) SDR.11(Supreme/Ashirbad/ASTRAL.) FIRST FLOOR
104Supplying all materials, labour, T&P for fitting & fixing and laying25mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC.SDR.11 (ORIPLAST / Supreme / Ashirbad / ASTRAL.) FIRST FLOOR
105Supplying all materials, labour, T&P for fitting & fixing and laying20mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. SDR.11 (ORIPLAST / Supreme / Ashirbad / ASTRAL.) SECOND FLOOR
106Supplying all materials, labour, T&P for fitting & fixing and laying25mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. SDR.11 (ORIPLAST / Supreme / Ashirbad / ASTRAL.) SECOND FLOOR
107Supplying all materials, labour, T&P for fitting & fixing and laying32mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. SDR.11 (ORIPLAST / Supreme / Ashirbad / ASTRAL.)TERRACEFLOOR
108Supplying all materials, labour, T&P for fitting & fixing and laying40mm dia CPVC pipe(sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. SDR.11 (ORIPLAST / Supreme / Ashirbad / ASTRAL.)TERRACEFLOOR
109supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings etc. all complete as per P.H. specification and direction of Engineer-in-charge. 250 mm thick wall FIRSTFLOOR
110supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings etc. all complete as per P.H. specification and direction of Engineer-in-charge. 250 mm thick wall SECOND FLOOR
111Supplying all materials, labour, T&P and cutting hole in R.C.C floors, roofs, etc upto 19 cm thickfor passing G.I. Pipes / P.V.C pipes and fittings etc and repairing the holes afterinsertion of pipes etc with cement concrete (1:2:4 ) including finishing complete so as to make it leak proof as per direction of theEngineer-in-charge. FIRST FLOOR
112Supplying all materials, labour, T&P and cutting hole in R.C.C floors, roofs, etc upto 19 cm thickfor passing G.I. Pipes / P.V.C pipes and fittings etc and repairing the holes afterinsertion of pipes etc with cement concrete (1:2:4 ) including finishing complete so as to make it leak proof as per direction of theEngineer-in-charge. SECOND FLOOR
113Supplying all materials, labour, T&P and fitting fixing of 2000 ltr. Capacity PVCwater tank(Sintex make triple layer) over roof slab in proper position including providing over flow, wash out, extra socket jam nut if required complete as per specification and direction of Engineer-in-Charge including cost, carriage, taxes of all materials, cost of labour, T&P required to complete the work as per direction of EIC. (Make: Sintex / Supreme)
114SANITARY FIXTURES. Fixing Wash down water closet, (European type W.C Pan) single PC with integral S or P trap& cystern etc all complete as per specification & fixing of plastic seat & cover for wash down water closet with chormium plated brass hinges and rubber buffers all complete as per specifications. (Make : Jaquare Fusion)
115Supplying all materials, labour, T&P and fixing Health Faucet of Hindware/Jaquar/Parryware complete with Chromium plated brass brackets fixed to wooden plugs with Chromium plated brass screws as per specification and direction of theEngineer-In-Charge. 15mm dia CP Health Faucet of Jaquar 1.2mtr long, 8MM diaJaquar,Cat No- ALD-573
116Supplying all materials, labour, T&P and fixing standard sized Two wayBib cock ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with Flange (Make : Jaquare Fusion)
117Supplying all materials, labour, T&P and fixing standard sized Long Bib cock ofHindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP Two waybib cock with Flange (Make : Jaquare Fusion)
118Supplying all materials, labour, T&P and fixing standard sized Robe Hook ofHindware/Jaquar/Parryware complete with all as per specification and direction of the Engineer in charge. Jaquar,Cat No- AKP-ANQ-35791P
119Supplying all materials, labour T&P and fixing of Under Counter wash basins of approved make in all floor of approved quality including cutting the walls & floor and making good the damags with cement concrete e.t.c including all tsxes,duties,transportation e.t.c. All complete as per specification and direction of theEngineer-In-Charge. Jaquar, KUBIX KUS-WHT-35401
120Supplying all materials, labour, T&P and fixing standard sized pillar cock of Hindware/Jaquar/Parryware of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge. 15mm dia fus Jaquar,Cat No- FUS-CHR-29001
121Supplying all materials, labour, T&P and fixing mirror of superior glass mounted on 6mm thick WPC board and fixed to wooden plugs with CP screws and washers complete as per specification and direction of the Engineer-in-charge. 600mmx450mm size B.E.mirror (Alpina/Golden fish/Belgion)
122Supplying all materials, labour, T&P and fixing standard sizedChromium Plated soap case ofHindware/Jaquar/Parryware complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. CP soap holder jaguar,Cat No- ACN-MCH-1131N
123Supplying all materials, labour, T&P and fixing standard sizedChromium Plated soap dispenserHindware/Jaquar/Parryware complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. soap dispenser jaquar,Cat No- AKP-CHR-35735P
124Supplying all materials, labour, T&P and fixing standard sizedChromium Plated brasstowel ring ofHindware/Jaquar/Parryware complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. Towel ring round & round flange. Jaquare Fusion.
125Supplying all materials, labour, T&P and fixing standard sized15mm dia angular Stop cock of Hindware/Jaquar/Parrywareof approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification complete as per direction of Er-in-charge. 15mm dia CP angle stop cock with wall flange .Jaquare Fusion.
126Supplying all materials, labour, T&P and fixing standard sizedChromium PlatedShower complete with Chromium Plated brassbrackets fixed to wooden plugs with Chromium Plated brassscrews as per specification and direction of the Engineer in charge. 100 mm dia over head Shower revolving Shower with shower arm ,Jaquare Fusion.
127Fixing of 20mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 20mm dia brass or gun metal full way valve. (Make- Shakti / ZOLOTO.)
128Fixing of 25mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 25mm dia brass or gun metal full way valve.(Make- Shakti / ZOLOTO.)
129Fixing of 32mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 32mm dia brass or gun metal full way valve.(Make- Shakti / ZOLOTO.)
130Fixing of 40mm dia Brass/GM Fulway Valve confirming toIS : 781-1995 of approved makeas per specification complete as per direction of Er-in-charge. 40mm dia brass or gun metal full way valve.(Make- Shakti / ZOLOTO.)
131EXTERNAL P.H. & SANITARY WORK. SEWAGE SYSTEM. Supplying all materials, labour, T & P and constructing Gully Trap chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge. 300mmx300mm with RCC cover
132Supplying all materials, labour, T & P and constructing of Inspection chamber of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge. Inside size 900mm x800mm x800mm
133Supplying all materials, labour, T & P and constructing of Man Hole of the following inside size with 8 cm thick R.C.C. precast cover slab in CC (1:2:4) mix using 12mm size h.g. chips, foundation concrete (1:4:8) using 40mm size h.g. metal on bed aound trap , Fly Ash brickwork in CM (1:6) in P&F and inside 12mm thick cement plastering (1:3) finished with a floating coat of neat cement including fixing 100mm x100mm size gully trap, 150mm x150mm C.I gratig etc. all complete as per aproved drawing, specification and direction of Engineer-in-charge. Inside size 1200mmx900mmx900mm
134Supplying, fixing and testing PVC soil, waste, Rainand vent pipes (SWR) supreme confirming to IS13592 : 2013, type B with rubber ring/Solvent(confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/Ashirbad/Astral. Including all fittings door bend, trap etc 75 mm dia .
135Supplying, fixing and testing PVC soil, waste, Rainand vent pipes (SWR) supreme confirming to IS13592 : 2013, type B with rubber ring/Solvent(confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/Ashirbad/Astral. Including all fittings door bend, trap etc 110 mm dia .
136Supplying, fixing and testing PVC soil, waste, Rainand vent pipes (SWR) supreme confirming to IS13592 : 2013, type B with rubber ring/Solvent(confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. Make:- Supreme/Ashirbad/Astral. Including all fittings door bend, trap etc 160 mm dia (Rain water drain pipe
137Supplying all materials, labours,T&p and laying trenches(to level or slope) unplasticized P.V.C pipe conforming to IS4985/2000 of the following out side dia for class-3 (0.60mpa) including jointing with suooly of approved solvent cement by on-heat application method/as per manufacture"s specification,providing and laying in trench cement concrete(1:4:8) with40 mm size hard granite metal in the type C-1 standard bedding and curing e.t.c all complete as per P.H specification and direction of the Engineer in charge 160 mm dia U-PVCpipe with al-round concreteing
138Supplying, fixing and testing PVC muilty floortrap with SS frame and cover 75mm dia outlet fixed on a bed of cement concrete with (Heavy duty type) etc., complete.
139Providing ,fixing , testing and commissioningof approved make PVC vent cowl with necessary accessories etc., complete. Make-Astral75 mm dia
140Providing ,fixing , testing and commissioningof approved make PVC vent cowl with necessary accessories etc., complete. Make-Astral110 mm dia
141Internal Electrification Guest house
142Recessed wiring to light point /fan point/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVCconduit with 6 Amp, 250 V clip in type modular switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size ,with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection as per direction of Engineer in Charge.(length-4mtr) Primary Point.
143Recessed wiring to light point /fan point/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVCconduit withceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size ,with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection as per direction of Engineer in Charge.(length-4mtr) Secondary Point.
144Supplying and fixing of metal box (nominal size) on surface or in recess with suitable size of modular base and cover plate in front including providing and fixing 15 / 16 amps modular socket outlet and 15 / 16 amps modular type switch, connection, etc as required. as per direction of Engineer in Charge.
145Supplying and fixing of 5/6Amp modular type socket outlet with switch on existing board with all acessories labour cost T&P etc. as directed by EIC.
146Supplying and fixing of18 Watt LED round shape ceiling light with all acessories labour cost T&P etc. as directed by EIC.
147Supplying and fixing of 1200 mm Celiing fanwith all acessories labour cost T&P etc. as directed by EIC.
148Supplying and fixing of modular type Electroic regulator with all acessories labour cost T&P etc. as directed by EIC.
149Supplying and fixing of 300mm Exhaust fan with all acessories labour cost T&P etc. as directed by EIC.
150Supplying and fixing of Call bell buzzer with all acessories labour cost T&P etc. as directed by EIC.
151Supplying and fixing of 18 watt Led Wall Light with Wall Hanging Fixturefor Bedroom/Living Room/Home Decorwith all acessories labour cost T&P etc. as directed by EIC.
152Supplying and fixing of5 watt led foot light for staircasewith all acessories labour cost T&P etc. as directed by EIC.
153Supplying and fixing of BK Angel holder with 15 watt LED bulb with all acessories labour cost T&P etc. as directed by EIC.
154Supplying and fixing of3 Watt LED mirror light with all acessories labour cost T&P etc. as directed by EIC.
155Supplying,Installation,Testing & commissioning of 2.0 Ton, single phase,5 star rating Inverter Split AC with copper condensoron the existing wall and making duct on the same for connecting to outdoor unit and water drainage system with 5KVA, 90-300V autometic voltage stabilizer Placing the outdoor unit outside the wall with non rusting bracket to be fixed on the outer wall etc. as required and as per direction of EIC.
156Supplying,Installation,Testing & commissioning of 1.5Ton, single phase,5 star rating Inverter Split AC with copper condensoron the existing wall and making duct on the same for connecting to outdoor unit and water drainage system with 4KVA, 90-300V autometic voltage stabilizer Placing the outdoor unit outside the wall with non rusting bracket to be fixed on the outer wall etc. as required and as per direction of EIC.
157Supplying & fixing of 4 way TPN MCB (BDB with MCB)( BDB for Air conditioner)
158S/F of 4 way MCB Distribution Enclosure Box with 4 way TPN Distribution board (IP-43 Double door Glazed),Incoming-63A c-seriesTPN MCB-1 No., One 63A TPN, 30mA RCCB-1 No. Outgoing- four nos SP MCB 10 A C-Serise MCB,four nos SP MCB 16 A C-Serise MCB,four nos SP MCB 20 A C-Serise MCB with all acessories labour cost T&P etc. as directed by EIC.
159Recessed wiring to submain in 4 x 6 sq.mm FR PVC insulated single core multistrand copper conductor of ISImarked confirming to IS-694/1990 in 32 mm dia non-metalic heavy duty flexible conduit 1.6 mm thick along with 2 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as required as directed by EIC.
160Recessed wiring to sub-main in PVC Conduit 2x4 sq mm FR PVC insulated single core multistrand copper conductor in 25mm dia non metalic heavy duty flexible conduit with 1x2.5 Sqmm single core multistrand copper conductor as earth wire with all accessories as directed by EIC.
161Recessed wiring to sub-main in PVC Conduit 2x2.5 sq mm FR PVC insulated single core multistrand copper conductor in 25mm dia non metalic heavy duty flexible conduit with 1x1.5 Sqmm single core multistrand copper conductor as earth wire with all accessories as directed by EIC.
162Supply installation testing comissioning of chemical earthing with3mtr long chemical earth electrode with highly conductive backfill compound including excavation, connection & construction of earth pit of size 2"*2" ith all accessories as directed by EIC.
163Supply , installation, Testing and commisioning of5 star rated 5Ltr capacity instant Geyser with all acessories labour cost T&P etc. as directed by EIC.
164Supply , installation, Testing and commisioning of indoor floor mounted Free standing type L.T distribution panel board of 415 V ,50 Hz. Power supply made out of 2mm thick for out door and 1.6mm thick for indoor CRCA steel and suitable size of 25x6mm Copper Bus bar, indication lamp . Incoming (i) 1No. 100A, 415V,4 Pole MCCB, 25KA , (ii) 1 No. 100 Amp, 415volt, 4pole Onload manualchangeoverOutgoing (i) 5 Nos 4 Pole 63A, 240V,10KA MCB (ii) 5 Nos 4 Pole 32A, 240V,10KA MCBwith all acessories labour cost T&P etc. as directed by EIC.
165Supply and laying ofUTP 4 pair LAN CAT-6 cable in 20mm dia good quality ISI mark PVC conduit including all other materials with all acessories labour cost T&P etc. as directed by EIC.
166Supply and laying of 0.5 sqmm FR PVC Insulatedcopper conductor unarmoured telephone cable of good quality ISI mark in existing PVC conduit including all other materials with all acessories labour cost T&P etc. as directed by EIC.
167Supply and laying ofTV cable RG6 Grade ,0.7mm solid copper conductor PE insulated shielded with fine tine with copper braid & protection with FR PVC including all other materials with all acessories labour cost T&P etc. as directed by EIC.
168Recessed wiring toTelevision point with clip in type modular television socket with GI modular box and cover with all acessories labour cost T&P etc. as directed by EIC.
169Recessed wiring toLANpoint with clip in type modular television socket (RJ45) with GI modular box and cover with all acessories labour cost T&P etc. as directed by EIC.
170Recessed wiring to telephone point with clip in type modular television socket (RJ11) with GI modular box and cover with all acessories labour cost T&P etc. as directed by EIC.
171Supply and fixing of dry powder type 5kg fire extinguisher complete with wall bracket along with supply of all materials with all acessories labour cost T&P etc. as directed by EIC.
172Civil Component Chemical Building
173Earthwork in excavation of foundation trenches for columns, basement, tie beams, walls and steps in following types of soil including moorum, hard stony earth, earth mixed with boulders, Laterite rocks etc but not requiring blasting with initial leads and lifts including dressing and leveling the bed sides up to required depth and depositing the excavated materials at places away from the work site with T&P for shoring, shuttering, dewatering if required etc. complete as per the drawing, design including cost of all labour, T&P etc. as required for the work complete as directed by the Engineer-in-charge. In all kinds of soil
174Earth Filling in foundation and plinth with excavatedearthincluding laying,watering and ramminginclusive of all cost of labour , T&Prequired for the work etc. complete as per direction of EIC.
175Supplying and filling the Foundation & Plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 150mm thick, watering and ramming including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete as per direction of the Engineer-in-charge.
176Providing & laying cement concrete of prop. (1:3:6) in foundation bed and floors using 40mm nominal size down graded, screened, washed hard black crusher broken granite metal of approved quality & from approved quarry including laying in the layers not exceeding 100 mm thick, hoisting, lowering, laying, watering and curing etc. complete to the required levels including cost, conveyance, royalty and taxes of all materials, cost of all labour, T&P etc. as required for the work complete and as per direction of Engineer-in-charge.
177Brick work in Foundation and Plinth with flyash bricks of size 25x12x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge.
178R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (FOOTING)
179R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (PLINTH BEAM)
180R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (COLUMN GF)
181R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (IN COLUMN FF)
182R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (IN COLUMN SF)
183R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (LINTELGF)
184R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (ROOF BEAM GF)
185R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (LINTEL FF)
186R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in(ROOF BEAMFF)
187R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in(LINTEL SF)
188R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in( ROOF BEAMSF)
189R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (CHAJJAGF)
190R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in(CHAJJAFF)
191R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in(SLAB GROUND FLOOR)
192R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in(SLAB FIRST FLOOR)
193R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (SLAB SECOND FLOOR)
194R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (STAIR CASE GF)
195R.C.C M-25 grade concrete with20mm & down graded hard crusher broken granite chips including hoisting and laying concrete, watering and curing for three weeks centering and shuttering and finishing the exposed surfaces smooth, providing beads or grooves where necessary including cost, conveyance, royalty of all material, dismantling the centering, shuttering work after the period as specified by the EIC and cost of all labour, T&P required for the work comp. in all respect, excluding cost of reinforcement, binding wires and labour charges for bending, binding and tying the grills. in (STAIR CASEFF)
196Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) (Ground Floor)
197Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) (First Floor)
198Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost, conveyance of HYSD bars Fe500 and above including binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC.. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.) (Second Floor)
199Brick work in Super-Structure with flyash bricks of size 25x12x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. (Ground Floor)
200Brick work in Super-Structure with flyash bricks of size 25x12x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. (First Floor)
201Brick work in Super-Structure with flyash bricks of size 25x12x8cm in cement mortar (1:6) with best quality bricks having crushing strength not less than 75 Kg/cm2 immersing the bricks in water for not less than 6 hours before use (the bricks shall be free from cracks, well shaped, uniform in size and shall produce a clear metallic ringing sound when struck) includes molding, chamfering, corbelling .complete as per drawing, design and specification, watering and curing for 7days including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. and as per direction of Engineer in charge. (Second Floor)
202Providing 25mm thick grading concrete in C.C. (1:2:2) laid in proper slope over terrace roof slab by using two part of sand, one part of cement and two parts of6mm size black hard crusher broken granite chips with addition of water proofing compound of approved quality to be mixed with specified ratio including watering, curing, cost, conveyance, royalties, ,es of all materials, cost of all labour, T&P etc. complete as required for the finished item of work as directed by the Engineer-in-charge.
20312mm (1/2") thick cement plaster (1:6) for finished smooth surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. (Ground Floor)
20412mm (1/2") thick cement plaster (1:6) for finished smooth surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC. (First Floor)
20512mm (1/2") thick cement plaster (1:6) for finished smooth surface of brick walls after racking out the joints including watering and curing etc. comp. with cost conveyance, royalty of all materials and cost of all labour, T&P scaffolding required for the work complete as per the direction of EIC.(Second Floor)
20616mm (5/8") thick cement plaster with (1:6) for finished smooth to outside surface of brick walls in head room racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC (Ground Floor)
20716mm (5/8") thick cement plaster with (1:6) for finished smooth to outside surface of brick walls in head room racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC(First Floor)
20816mm (5/8") thick cement plaster with (1:6) for finished smooth to outside surface of brick walls in head room racking out the joints including watering and curing etc. Complete. with cost , conveyance, royalty of all materials and cost of all labours, T&P scaffolding required for the work complete as per direction of EIC (Second Floor)
2096 mm thick cement plaster in C.M. (1:4) over RCC surface including watering, curing and cost, carriage of all materials, cost of all labour, T&P required to complete as per direction of EIC.(Ground Floor)
2106 mm thick cement plaster in C.M. (1:4) over RCC surface including watering, curing and cost, carriage of all materials, cost of all labour, T&P required to complete as per direction of EIC. (First Floor)
2116 mm thick cement plaster in C.M. (1:4) over RCC surface including watering, curing and cost, carriage of all materials, cost of all labour, T&P required to complete as per direction of EIC.(Second Floor)
212Supplying all materials, labour, T&P and fixing Acid resistancefloor tile of 600x600mm size of approved brand and shade on 25mm thick cement mortar (1:4) (1 cement:4 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Cengress / Kajari/ Bell/ Somany/ RAK) (Ground Floor)
213Supplying all materials, labour, T&P and fixing vitrified floor tile of 1200x600mm size of approved brand and shade on 25mm thick cement mortar (1:4) (1 cement:4 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Cengress / Kajari/ Bell/ Somany/ RAK) (Ground Floor)
214Supplying all materials, labour, T&P and fixing Vitrified colour floor tile of size 1200mmX600mm on floors on 20 mm thick bed of cement mortar (1:4) (1 Cement : 4 sand) jointed with neat cement, slurry mixed with pigment to match the shades of tiles complete as per specification and direction of EIC including cost, carriage, cost of all labour, T&P required to complete the work. (Make :- Kajaria / Orient/ Bell / Somany / RAK/ Cengress).(First Floor)
215Supplying all materials, labour, T&P and fixing Acid resistanceWall tile of 300mmx450mm size of approved brand and shade on 25mm thick cement mortar (1:3) (1 cement:3 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Cengress / Kajari/ Bell/ Somany/ RAK) (Ground Floor)
216Providing and fixing gypboard suspended false ceiling (single layers) in different levels, recesses, flat areas as per design with G.I. Framework using Gypsteel of perimeter channels, intermediate channels and ceiling sections) and 12.5 mm taped edge gypboard screw fixed to ceiling section as per design , complete with fixing and finishing of tapered and square edges of board with jointing compound paper tape and 2 coats suitable primer including all cost of materials , labour, overheads T & P etc., complete.and paintingthe entire ceiling area with plastic emulsion paint( 2 & more coats ) to get an even shadeas per the detail design and specification. measurement will be taken flat area of the ceiling for payment.no additional payment made for the different level/ drop.
217Providing and Fixing of Armstrong/Gyprex / Eqvsuspended ceiling system with Fine fissured microlook tilesin modules size of 600 x 600 x 15mm laid on armstrong silhouette reveal profile grid system with 15mm white flange incorporating a 3 mm or 6mm central recesss.Silhouette mail runner & cross tee ti have mitred ends and birdsmuth notches to provide mitered cruciform junction.
218Supplying all materials, labour, T&P and fixing vitrified walltile of 1200x600mm size of approved brand and shade on 25mm thick cement mortar (1:4) (1 cement:4 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Cengress / Kajari/ Bell/ Somany/ RAK).(Ground Floor)
219Supplying all materials, labour, T&P and fixing vitrified wall tile of 1200x600mm size of approved brand and shade on 25mm thick cement mortar (1:4) (1 cement:4 sand)jointed with neat cement, slurry mixed with pigment to match the shed of tiles including rubbing and polishing complete as per specification and direction of EIC including cost, carriage of all materials cost of all labour, T&P required to complete the work..(Tiles should be of Cengress / Kajari/ Bell/ Somany/ RAK) (First Floor)
220Providing Granite stone prepolished black 20mm thick of areaabove 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Ground Floor)
221Providing Granite stone prepolished black 20mm thick of areaabove 0.40 Sqm in flooring of approved quality, colour and size in floors, treads on steps and landings in all floors at all height on 20mm thick bed of cement mortar of mix (1:4) laid in proper slope and gradient with screened and washed sharp sand for mortar and grouted with neat white cement slurry jointing the tile with neat white cement slurry mixed with required quantities of pigments of approved marks to match the shades of the granite tile if requiredwatering and curing for 21 days, including cost, conveyance, loading, unloading, royaltiesof all materials, cost of all labour, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (First Floor)
222Supplying , fitting and Fixing of Stainless steelof 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mm x 32mm x 2mm @ 0.90 mtr C/C and stainless steel square pipe bracing of size 32mm x 32mm x 2mm in three rows in staircase as per approved design and specification , buffing, polishing etc. with cost, conveyance, ,es of all materials, labour, T&P, etc. required for the complete in all respects.
223Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) (Ground Floor) (Ground Floor)
224Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) (Ground Floor) (First Floor)
225Finishing wall surface of walls with Acrylic wall putty (Cement based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials, cost of all labour T&P etc. complete as per direction of EIC. (Make SG England/ J.K./Birla) (Ground Floor) (Second Floor)
226Providing two coats of plastic emulsion painting of approved shade (Washable type) over a coat of primerto give an even shade to surface of wall, including cost, conveyance of all materials, cost of all labour, T&P required for the work etc. complete as directed by EIC.( Paints of Berger/ ICI/ Nerolac to be used)(Ground Floor)
227Providing two coats of plastic emulsion painting of approved shade (Washable type) over a coat of primerto give an even shade to surface of wall, including cost, conveyance of all materials, cost of all labour, T&P required for the work etc. complete as directed by EIC.( Paints of Berger/ ICI/ Nerolac to be used)(First Floor)
228Providing two coats of plastic emulsion painting of approved shade (Washable type) over a coat of primerto give an even shade to surface of wall, including cost, conveyance of all materials, cost of all labour, T&P required for the work etc. complete as directed by EIC.( Paints of Berger/ ICI/ Nerolac to be used)(Second Floor)
229Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used)(Ground Floor)
230Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used)(First Floor)
231Weather coat two coats of approved brand and shade overa coat of primer over exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost, conveyance of all materials, cost of all labour, T&P etc. complete as directed by EIC. (Weather coat should of ICI/Berger/Asian is to be used)(Second Floor)
232Providing and fixing of Swing Door of approved make to be fabricated from roll formed sections made of pre-painted steel (base steel as per IS-513 of 0.6mm thick "D" quality, galvanized as per IS-277 with zinc of 120 Gm/ Sq.mtr) with paint specification being with primer of 5-7 microns and finished paint with polyster paint (Black / Pearl White /Choclate Brown) of 12-16 microns alongwith the alkyd backer at the back of 5-7 microns and the sizes of outer frame being of 33x57 mm and shutter being of 46x52 mm and 46x46mm and lock rail should be of 23 x 130mm. Accessories / gaskets are to be used as per the manufacturers supply and specification like handle, lock and floor spring of approved quality, Gasket will be made of EPDM. All corner brackets are to be made of CRCA with zinc phophating. The sections are to be cut to length, mitre joined with corner bracket and frames are fixed to the concrete / masonry walls by means of self expanding screws and glass to be used of 12mm clear with all taxes etc. complete as per direction of EIC. (Make :- Saint Gobin or equivalent)
233Providing and fixing of35mm thickWPC door shutter (Solid) with pvc edge leaping to the periphery of the shutter with lamination filishing all aroung as per detailed drawing with including, all hardwares & fixtures, SS tower bolt(150mm),Door stopper,SS aldrop(250mm),SS handle(200mm length),ss handle (150mm length) & SS Butt hinges -125mm x 65mm x2.12mm .including cost, conveyance, loading, T&P required for the work etc. complete in all respect as directed by the Engineer-in-charge.
234Supplying fitting and fixing in position 32mm thick Partially glazed flush doorwith teak wood beading and 1mm thick sunmica to both side pasted with adhessive and provision of 8mm thick toughen glass with itching including fixing of fixtures like Godrej make Mortice lock having model no 9168, Godrej make Door closure having model no 8340, 100mm aluminium hinges, handle, tower bolt, stopper including cost of all materials, labour, transportation, loading & unloading etc. complete as per specification and direction of Engineer -in-charge.
235Supplying, fitting & fixing of fire exit door shutter including all cost of labour T&P etc. complete as per specification and direction of EIC.
236Supplying, fitting & fixing of Aluminium wire mesh including all cost of labour T&P etc. complete as per specification and direction of EIC.
237Providing and fixing of factory made uPVC Sliding window (White Colour) complete, comprising uPVC multi-chambered frame having in-built uPVC roller track on top and uPVC sash with wall thickness of 2.0mm (+-0.2 mm) duly reinforced with G.I. section 1.6 mm (+-0.2 mm), profile shall be manufactured from Tropicalized Blend with TiO2 and required additives. Profile must be colorfast and confoMtr to standard EN12608. The profile sections should have multi hollow (min 2 to 3 chambers) chamber to include GI reinforcement with 120 GSM zinc coated, fitted in continuous length, in closed chamber. The thickness of GI should be selected to meet the wind load requirement as per IS 875- Part III on sash/mullion. Supplier should be submitting wind load calculation & validation complying with IS-875-III before material supply. Minimum steel reinforcement thickness of 1.2mm to 2.5mm. UPVC Windows & Doors must be fabricated with fusion welded corners & must confoMtr to the strength requirements based on wind load as per IS 875-Part III. All hardware fitted should be Non-SS, except handles to be of zinc/Al. alloy casted with powder coated. Glass should be of 5mm single clear toughened Glass with weather seal (EPDM/TPE). After placing 5 mm Clear glass in the sash, uPVC glazing bead, interlock, EPDM gasket, brush shall be provided including touch lock( above 1500 mm Multi Lock ) and rollers & proper drainage system shall be provided. Window frame will be fixed to the wall with 100mm long and 8mm dia. Fasteners and after fixing frame the gap between frame & wall should be filled with silicon sealant (not more than 5 mm x 5 mm), complete in all respect as per direction of Engineer-In-Charge. Three track three panels sliding window with fly proof S.S wire mesh(Two nos glazed & one no wire mesh panels) made of (big series) frame 116 x 45 mm and sash 46 x 62 mm both having wall thickness of 2.3 + 0.2 mm single glazing bead/ double glazing bead of appropriate dimension. (Area of window above 1.75 Sqm ).
238Supplying,fitting,hoisting, joist, M.S. hollow sectiontrusses of size 50x25x3.2m and 200x100x6m required span, placing in positionincluding cost of nut &bolts, cement concrete and all other materials required for the work, cost of all labour, T&P etc.complete as per specification drawing and drawing & direction of EIC.
239Providing and painting two coats with synthetic enamel paint over a coat of zinc oxide primer of approved quality and approved shade confirmingto ISI on steel work to give an even shade in all floors at all height including sand papering and making the surface smooth with cost, coveyance, loading and unloadingof all materials, cost of all labour, sundries, T&P, scaffolding etc. required for the work and complete in all respect as directed by Engineer-in-charge.(2nd floor)
240Providing all materials, labour,T&P and fittings and fixing of flush valve of Jaquar Cat. No.-PRS 073 or equivalent type of approved make etc complete including cutting the wall and making good the damages, including cost of all materials complete as per PH specification and direction of Engineering-in-charge.
241Supplying all materials, labour, T & P and fitting and fixing 15mm CP 2 way bib cock with C.P.Health Flushet with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make:-Jaqure -FLR)
242Supplying all materials, labour, T & P and fitting and fixing 15mm dia C.P long body bib cockwithsupply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make:- Plaza / ROCIO/ Rapsel/ Marine or equivalent)
243Supplying all materials, labour, T & P and fitting and fixing 15mm dia C.P pillar cock withsupply of all jointing materials complete as per specification and direction of the Engineer - in - charge.(Make:- Plaza / ROCIO/ Rapsel/ Marine or equivalent)
244Supplying all materials, labour, T&P and fitting & fixing 15mm dia CP angular stop cock with supply of or jointing materials completeas per specification and direction of the Engineer in charge. (Make:- Plaza)
245Supplying all materials, labour, T & P and fitting and fixing 15mm dia C.P concealed stop cock with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make:- plaza )
246Supplying all materials, labour, T & P and fixing and fitting CP shower with arm (150mm) 15mmor 20 mm inlet including all cost complete as per specification and direction of the Engineer - in - charge.(Make:- Plaza)
247Supplying all materials, labour, T&P and fixing standard sized CP towel rail 60cm long complete with CP brass brackets to wooden plugs with CP screwsas per specification and direction of the Engineer in charges.(Make:Plaza,)
248Supplying all materials, labour, T & P and fixing standard sized Steel soap dish holder complete with steel brackets fixed to wooden plugs with steel screws as per specification and direction of the Engineer-in-charge.(Make:- Plaza)
249Supplying all materials, labour, T&P and fixing standard sized glass-shelf with CP brass brackets and guard rails complete fixedto wooden plugs with CP screwsas per specification and direction of the Engineer in charges.(Make:Plaza/Jaquar)
250Providing, Supplying & Fixing of wall mounted EWC with PP seat cover,Hinges,Accessories Set with approved size with all fittings & fixtures complete including making good the damages . including cost of all materials, labour,, T&P, lead, royality etc.complete in all respects as per direction of Engineer in charge. (Make: Cera / Parryware / Nycer / Merc)
251Supplying all materials, labour, T & P and fitting and fixing health faucet with supply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make-ALD 563)
252Supplying all material, labour T&P and fixtures for providing and fixing of white glazed vitreous chinaware counter top wash hand basin of size 40x40x10cm dia ofapproved make with bottle trap with CP waste coupling nut and 15mm x 450mm PVC connection pipewith MS bracket with wooden plugs CP screws including cost of cement, sand, labour, T&P etc. complete including testing cost, conveyance, royalty andof all materials etc. complete as per PH specification and direction of Engineer-in-charge.
253Supplying all materials, labour, T&P and fixing 600mmx450mm size B.E Mirror( fixed type) over 6mm thick WPC board backing with supply of all jointing materials complete as per PH specification and direction of EIC (materials to be approved by the EIC before use) (Make-Saint Gobin/ Modi/ Golden Fish / Silver Fish).
254Supplying all materials, labour, T&P and fitting fixing of 1000 ltr. Capacity PVCwater tank(Sintex make double layer) over roof slab in proper position including providing over flow, wash out, extra socket jam nut if required complete as per specification and direction of Engineer-in-Charge including cost, carriage, taxes of all materials, cost of labour, T&P required to complete the work as per direction of EIC.
255Supplying all materials, labour, T & P and fitting and fixing 25mm dia uPVC ball valve withsupply of all jointing materials complete as per specification and direction of the Engineer - in - charge. (Make:- Supreme / Astral / Ashirbad)
256Supplying all materials, labour, T&P for fitting & fixing and laying 25mm dia CPVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Make:ORIPLAST/ Hariplast / Supreme)
257Supplying all materials, labour, T&P for fitting & fixing and laying 20mm dia CPVC pipes (Sch-80) and fittings including supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kind of soil and rock and refilling the trenches including scaffolding, testing etc. as per direction of EIC. (Make:ORIPLAST/ Hariplast / Supreme)
258Supplying all materials, labour, T&P for fitting and fixing of 110 mm dia PVC Vent pipe, fittingsto walls with nails,bobbins and wooden plugs as perspecification and direction of EIC. (Make:ORIPLAST/ Hariplast / Supreme)
259Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC cowel including supply of all jointing materials like gaskets, adhesive ,solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC. (Make:ORIPLAST/ Hariplast / Supreme)
260Supplying all materials, labour, T&P for fitting and fixing of 110 mm dia PVC floor trap with CP grating of approved make including supply all jointing material like gasket, adhesive, solvent cement etc and fitting to walls with nails,bobbins and wooden plugs as perspecification and direction of the Engineer in charges (Make :- Oriplast / Hariplast/ Supreme / Astral)
261Supplying all materials, labour, T&P for fitting and fixing of 110 mm dia PVC Tee approved make including supply all jointing material like gasket, adhesive, solvent cement etc and fitting to walls with nails,bobbins and wooden plugs as perspecification and direction of the Engineer in charge (Make :- Oriplast / Hariplast/ Supreme / Astral)
262Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC Door bend ofincluding supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC.(Make:ORIPLAST/ Hariplast / Supreme)
263Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC plain bend ofincluding supply of all jointing materials like gaskets, adhesive, solvent cementetc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC.(Make:ORIPLAST/ Hariplast / Supreme)
264Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia PVC pipes class-II (4kg per cm2) with all fittings of without hunching with CC 1:4:8 and top haunchinh with chips concrete in C.C (1:3:6) including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kinda of soil & rock & refilling the trenches including testing etc as per PHspecification and direction of the Engineer in charges. (Make:ORIPLAST/ Hariplast / Supreme)
265Supplying all materials, labour, T&P for fitting and fixing and laying 110mm dia PVC pipes class-II (4kg per cm2) with all fittings of with hunching with CC 1:4:8 and top haunchinh with chips concrete in C.C (1:3:6) including supply of all jointing materials like Gaskets, adhesive, solvent, cement etc and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including earth work in all kinda of soil & rock & refilling the trenches including testing etc as per PHspecification and direction of the Engineer in charges. (Make:ORIPLAST/ Hariplast / Supreme)
266Supplying all labour and materials for Construction of manhole chamber ofSize 760mmX760mmX460mm, earth work excavation in all kinds of soil C.C (1:3:6) with hard stone metal of size 25mm to 50mm on bed benching with C.C (1:2:4) with black hard granite chips of 12mm to 20mm, brick work using K.B.Bricks having crushing strength not less than 75 Kg. per cm2 in C.M (1:6), 12mm cement plaster (1:3) inside the manhole chamber and over benching, cement flush pointing (1:3) to outside of the manhole, providing R.C.C roof slab with C.C (1:2:4) with broken hard granite chips 12mm to 20mm, bending, binding and tying the grills and centering and shuttering, providing C.I. manhole cover 450mm of 50 Kg. weightincluding painting the C.I. manhole cover and step iron with two coats and anti corrosive paint and filling the cavity along the manhole chamber with excavated earth, including channeling the bed of manhole etc. complete as per P.H specification.
267Construction 25 (3.0 mtr x 1.80 mtr x 1.80 mtr) user Septic tank of approved size and drawing with C.C (1:3:6) in foundation with 1st class K.B .Brick in C.M (1:4), 12mm thick C.P in C.M (1:4), C.C (1:2:4) using 12mm size h.b.g chips in floors with R.C.C (1:1½:3) Baffle wall, cover slab of thickness 100mm with C.I manhole cover, 20mm dia iron steps complete as per PH specification and direction of EIC. (The drawing and design will be supplied by EIC)
268Supplying all materials labour, T&P for construction of soak way pit of size (1.5m x 2.5m) with dry brick masonry for soak pit & 1st class K.B. Bricks masonry in C.M. (1:6) with C.P (1:4) inside and outside of septic tank & filled with dry brick khoa 4cm to 5cm to height of 0.85m from the bottom covered by means of 4cm thick RCC slab of 5cm thick RCC slab cover in three pieces fitted with iron handles including earth work in excavation, CC (1:4:8) & PCC (1:2:4) and refilling the sand around the pit and painting the iron works etc as per approved drawing & design supply & as per the direction of EIC.
269Internal Electrification Chemical Building
270Recessed wiring to light point /fan point/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVCconduit with 6 Amp, 250 V clip in type modular switch ISI marked and ceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size ,with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection as per direction of Engineer in Charge.(length-4mtr) Primary Point.
271Recessed wiring to light point /fan point/ call bell point/ exhaust fan point /wall fan point with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVCconduit withceiling rose ISI marked mounted on G.I modular box with face plate & cover of suitable size ,with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection as per direction of Engineer in Charge.(length-4mtr) Secondary Point.
272S/F of 5 / 6 amp modular socket outletwith6Amp, 250 V clip in type modular switch ISI markedmounted on existingG.I moular box with face plate & cover of suitable sizeincluding all accessories and connection on same switch board as per direction of Engineer in Charge.
273Recessed wiring to socket point with 5 / 6 amp modular socket outlet with 2 x 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor of ISI marked in 20 mm dia non-metalic 1.6mm thick PVCconduit with 6Amp, 250 V clip in type modular switch ISI markedmounted on 3module G.I moular box with face plate & cover of suitable size ,with 1.5 sq.mm FRLSH PVC insulated single core multistrand copper conductor as earth wire including all accessories and connection on separate board as per direction of Engineer in Charge.
274S/F of 2X 5 / 6 amp modular socket outletwith2X6Amp, 250 V clip in type modular switch ISI markedmounted on separateG.I moular box with face plate & cover of suitable sizeincluding all accessories and connection on same switch board as per direction of Engineer in Charge for computer points.
275Supplying and fixing of LAN point socket outlet (RJ-45)modular type ISI marked on the modular board / cover including connections etc as requird. as required. as per direction of Engineer in Charge.
276Supplying and fixing of metal box (nominal size) on surface or in recess with suitable size of modular base and cover plate in front including providing and fixing 15 / 16 amps socket outlet and 15 / 16 amps modular type switch, connection, etc as required. as per direction of Engineer in Charge.
277Recessed wiring to submain in 2x2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 20 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 1x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired including all accessories and connection as per direction of Engineer in Charge.
278Recessed wiring to submain in 4 x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 2x 1.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired including all accessories and connection as per direction of Engineer in Charge.
279Recessed wiring to submain in 4 x4sq.mm FR PVC insulated single core multistrand copper conductor of ISI marked confirming to IS-694/1990 in 25 mm dia non-metalic heavy duty PVC conduit 1.6 mm thick along with 2x 2.5 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire as equired including all accessories and connection as per direction of Engineer in Charge.
280Supplying and drawing of CAT-6 cable for LAN connectivitty with FR PVC sheath in separate surface / recessedPVC conduit as required including all accessories and connection as per direction of Engineer in Charge.
281Supply and fixing of125Amp Indoor type Power Distribution Board in MS sheet of 16SWGwith incomming-125Amp,4P,18KA 415V MCCB,125Amp, 4 pole Onload Tap changer., Type 1+2 SPD of maximum Discharge Current (3Ph+N) ,63Amp, 4 pole HRC fuse base with fuseOutgoing-(i) 63Amp,4P,18 KA 415V MCCB-3 Nos,32Amp,4P,18 KA 415V MCCB-4 Nos,25Amp,2P,65 KA 240V MCCB-2 Nos with Multifunction meter CL-1.0 (I,V,KW,KVA, KWH, KVAH),150/5A CT, C.L. 1.0, 15VA-3 Nos ,R-Y-B LED Indicating lamp 220/240V AC-3 Nos,6Amp SP MCB, 10KA, C-curve- 3 Nos,15X5mm Copper Bus-bar,Drum Insulator, 11KV ISI marked as required and as per the direction of EIC
282Supply and fixing of8+24 wayTPN Double door MCB DBwith sheet steel enclosure IP-43 protected of ISI marked, on surface, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. with incomming-63A TPN MCB= 1 No., outgoing-(i) SP MCB 32A=18 No. C-Series,(ii)SP MCB 10A=6Nos C-Series with ISI marked as required and as per the direction of EIC . (Ground Floor Main BDB)
283Supply and fixing of6+18 wayTPN Double door MCB DBwith sheet steel enclosure IP-43 protected of ISI marked, on surface, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. with incomming-32 A TPN MCB=1 No., outgoing-(i) SP MCB 32A=13 Nos C-Series,(ii)SP MCB 10A=5Nos C-Series with ISI marked as required and as per the direction of EIC . (First Floor Main BDB)
284Supply and fixing of4 waySPN Double door MCB DBwith sheet steel enclosure IP-43 protected of ISI marked, on surface, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. with 63 A TPN MCB=1 No. C-Series with ISI marked as required and as per the direction of EIC . (For ground floor special equipment)
285Supply and fixing of4 waySPN Double door MCB DBwith sheet steel enclosure IP-43 protected of ISI marked, on surface, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, detachable gland plate, interconnection, phosphate and powder painted including earthing etc. with 32 A TPN MCB=1 No. C-Series with ISI marked as required and as per the direction of EIC . (For ground floor special equipment)
286Supply and fixing of18Watt, 6000K round surface mounted LED panel light including all accessories ,materials as required as per the direction of EIC.
287Supply and fixing of15Watt, 6000K round LED panel light including all accessories ,materials as required as per the direction of EIC.
288Supply and fixing of18W LED batten type tube light including all accessories ,materials as required as per the direction of EIC.
289Supply and fixing of 20Amp metal 3 pin plugs and sockets(P-N-E) with SP MCB including all accessories ,materials as required as per the direction of EIC.
290Supplying and fixing of 1200 mm sweep BLDC fan without remote including all accessories and connection as per direction of Engineer in Charge.
291Supplying and fixing of 400 mm sweep wall mountedfan including all accessories and connection as per direction of Engineer in Charge.
292Supplying and fixing of 250 mm sweep plastic exhaustfan including all accessories and connection as per direction of Engineer in Charge.
293Supplying and fixing of 450 mm sweep industrial heavy duty exhaustfan including all accessories and connection as per direction of Engineer in Charge.
294Supplying,Installation,Testing & commissioning of 2.0 Ton, single phase,5 star rating Inverter Split AC with copper condensoron the existing wall and making duct on the same for connecting to outdoor unit and water drainage system with 5KVA, 90-300V autometic voltage stabilizer Placing the outdoor unit outside the wall with non rusting bracket to be fixed on the outer wall etc. as required and as per direction of EIC.
295Supplying,Installation,Testing & commissioning of 1.5Ton, single phase,5 star rating Inverter Split AC with copper condensoron the existing wall and making duct on the same for connecting to outdoor unit and water drainage system with 4KVA, 90-300V autometic voltage stabilizer Placing the outdoor unit outside the wall with non rusting bracket to be fixed on the outer wall etc. as required and as per direction of EIC.
296Supplying,Installation,Testing & commissioning of 20 KVA, 3-Ph input, 1-Ph output pure sine wave, 30 minutes back-up online UPS with transformeretc. as required and as per direction of EIC.
297Supply and fixing of 50W LED flood light including all accessories ,materials as required as per the direction of EIC.
298Supply and fixing of100W, 240V modular electronic ceiling fan regulator including all accessories as per the direction of EIC .
299Supply and fixing of240V call bellincluding all accessories as per the direction of EIC .
300Supply & Laying of 50Sq mm 3.5 core Armoured Aluminum cable as required including all accessories and connection as per direction of Engineer in Charge.
301Supply and fixing of 9.2mm dia 915mm long copper lightning arrester including all accessories, labour cost, T&P etc complete work as per Direction of EIC.
302Supply and fixing of chemical Earthing of with 3mtr long40mm dia chemical filled comound and GI earth electrodeincluding excavation of earth pit with highly conductive back filled chemical compund of 2 x25kg , brick work in cement mortar masonary workwith removable cover for Earth pit chamber ofsuitable size including all accessories, labour cost, T&P etc complete work as per Direction of EIC.
303Supply & Laying of25X3mm size hot dip GI Earthing strip @ 0.6Kg/Mtr. including all accessories and connection as per direction of Engineer in Charge.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail