|
| 1 | Supply |
| 2 | 8\"C.S. Gate valve Flanged, Class 150 |
| 3 | 3\" C.S. Gate Valve Flanged, Class 150 |
| 4 | M.S. Flange NB 200, SCH-40, Class 150 |
| 5 | M.S.Flange NB-80, SCH-40, Class 150 |
| 6 | Hex Head Bolt & Nut M20x85mm grade h8.8 |
| 7 | Hex Head Bolt & Nut M16x75mm grade h8.8 |
| 8 | Cup seal of brake & Jack System of U-2&4 |
| 9 | Combinator Unit of B & J system |
| 10 | Direct operated pressure Relief Valve |
| 11 | RTD with wire length -10 Mtr(Pt-100) |
| 12 | Dial Type Gas Actuated TSD Twin Bellow |
| 13 | Works/Services |
| 14 | Dismantling of Unit. |
| 15 | Overhauling, repair & assembling of vapor seal. |
| 16 | Replacement, Mirror Machining work of Stopper Plates & Polishing of Journal. |
| 17 | Cleaning & Insulation Varnish on upper and lower overhang portion of stator& Rotor Poles. |
| 18 | Reversing the Polarity of DC Supply and Repairing, Overhauling, Cleaning and Polishing of Slip-ring. |
| 19 | Dismantling & Overhauling of Generator bearing coolers. |
| 20 | Dismantling & Overhauling of Stator air coolers |
| 21 | Overhauling of Braking & Jacking system |
| 22 | Painting of Various equipment’s of Generator |
| 23 | Overhauling of H.S. Lubrication System |
| 24 | Overhauling of 01 No. Unit Transformer and 02 Nos. Station Transformers. |
| 25 | Replacement of limit switches and Rewiring of brake jack assembly. |
| 26 | Fixing of Gland Seal & Rubber Seal for RTD & TSD Cables on Bottom Bracket. |
| 27 | Repair of Rotor Pole. |
| 28 | Providing & Fittings New Lights with Rewiring & MCB Box in Near Carbon Brush Assembly. |
| 29 | Replacement of 4 No\"s, 8”(200 mm) gate valve from main cooling water pipeline of generator on u/s and d/s side. |
| 30 | Replacement of 12 Nos. 3” (80 mm) gate valve in generator barrel at incoming and outgoing side of stator air cooler . |
| 31 | Replacement of04 Nos, 3”(80 mm) gate valve of Bearing oil cooler at incoming and outgoing side. |
| 32 | Assembling/Box & commissioning of Machine. |
| 33 | Leveling of Machine Unit 2. |
| 34 | Alignment of Machine Unit 2. |
| 35 | Dynamic Balancing of Machine Unit 2&4. |
| 36 | Software Designing, Development, Installation in various output modes,SYSTEMS Testing &COMMISSIONINGSoftware to handle all cameras and display the live streaming data over internet to be presented in 1 all in one PCat DGM, Dhakrani and Android based Smart phones. |
| 37 | Software Designing, Development, Installation in various output modes,SYSTEMS Testing &COMMISSIONINGSoftware to handle all cameras and display the live streaming data over internet to be presented in 1 all in one PCat DGM, Dhakrani and Android based Smart phones. |
| 38 | Software Designing, Development, Installation in various output modes,SYSTEMS Testing &COMMISSIONINGSoftware to handle all cameras and display the live streaming data over internet to be presented in 1 all in one PCat DGM, Dhakrani and Android based Smart phones. |
| 39 | Software Designing, Development, Installation in various output modes,SYSTEMS Testing &COMMISSIONINGSoftware to handle all cameras and display the live streaming data over internet to be presented in 1 all in one PCat DGM, Dhakrani and Android based Smart phones. |
| 40 | Slot, up to 128 GB, IR Range 30 meters, IP 66 & POE, (2 Megapixel IR Night Vision Bullet Camera) |