| 1 | Dismantling R.C.C.works,carefully clearing away the debris as directed during execution |
| 2 | Painting the OLD plastered walls with two coats ofExterior emulsion paint (weather proof ) first classquality and of approved colour over a priming coatincluding thorough scrapping,clean removal of dirt,etc.,complete and including necessary plasterparis,putty etc., wherever required.as per (ISI STD) (Itmust provide excellent resistance against the growth of algae and fungi on the walls. And it must offerexcellent protection against alkali and UV degradationand the durability period should be 5 years.(562B) |
| 3 | Supply & stacking of red earth at site tothe departmental guage for pre-premeasurementswhich is of light textured,crystalline, porous and friable and not ofgenerally acidic or neutral but not ofalkaline and should be fertile, includingseignior age charges, cost oftransportation, loading, unloading,stacking and inclusive of all taxes etc.,complete(711) |
| 4 | Supplying and stacking of sand (Supply& stacking of sand at site to thedepartmental guage for premeasurementsobtained from naturaldisintegrated rock which has beendeposited by streams or glacial agenciescomposed of hard silicons material andshould be clean,sharp and angular typefree of adherent coatings)(712) |
| 5 | Supply of well decomposed Farm yardManure in a powdery form, devoid of soilsand, stones, plastics and othermaterials, highly nutrient and whichsupports plant growth.(713) |
| 6 | Mixing charges of Red soil, sand andmanure uniformly (1:1:1) for Preparationof soil mixture (excluding material cost)(714) |
| 7 | Painting the new plastered walls with two coats ofExterior emulsion paint (weather proof ) first classquality and of approved colour over a priming coatincluding thorough scrapping,clean removal ofdirt,etc.,complete and including necessary plasterparis,putty etc., wherever required.as per (ISI STD) (Itmust provide excellent resistance against the growth ofalgae and fungi on the walls. And it must offerexcellent protection against alkali and UV degradationand the durability period should be 5 years.(562A) |
| 8 | Supplying and placing for Flower Pot Traffic island and center median including GST and Transporation charges etc complete(LS) |
| 9 | Planting of Ficus benjamina greenornamental foliage Specimen plantvariety of height 105-120 cm inpolythene bag of dia 30 cm includingloading and unloading charges,transportation, stacking of saplings atsite, earth work excavation of requiredsize, planting of sapling, refilling ofexcavated earth etc as directed by thesite in-charge.(820) |
| 10 | Planting of Thuja ornamental foliageSpecimen plant variety of height 105-120 cm in polythene bag of dia 30 cmincluding loading and unloading charges,transportation, stacking of saplings atsite, earth work excavation of requiredsize, planting of sapling, refilling ofexcavated earth etc as directed by thesite in-charge(829) |
| 11 | Supplying and Planting of Dypsislutescens (Areca palm) palm variety ofheight 180-210 cm in polythene bag ofdia 30cm including supporting stack of 5 cm dia casurina pole of 10 feet height,including loading and unloading charges,transportation, stacking of saplings atsite, earth work excavation of requiredsize, planting of sapling, refilling ofexcavated earth etc as directed by thesite in-charge..(834) |
| 12 | Supplying and Planting of Dypsislutescens (Areca palm) palm variety ofheight 180-210 cm in polythene bag ofdia 30cm including supporting stack of 5 cm dia casurina pole of 10 feet height,including loading and unloading charges,transportation, stacking of saplings atsite, earth work excavation of requiredsize, planting of sapling, refilling ofexcavated earth etc as directed by thesite in-charge..(834) |
| 13 | Supplying and Planting of Ashoka treesapling of height 240 - 270 cm inpolythene bag of dia 30cm includingsupporting stack of 5 cm dia casurinapole of 10 feet height, including loadingand unloading charges, transportation,stacking of saplings at site, earth workexcavation of required size, planting ofsapling, refilling of excavated earth etc asdirected by the site in-charge |