Irrigation Department has published Re-Construction Of Syphon Aqueduct At Km 11.723 Of Dy. Pilkhatra On Babarpur Drain. Submission Date for this Tender is 30-09-2022. Canal Construction Tenders in Firozabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material with in a distance of 60M as per direction of Engineer-in-chargetrenches with removal and disposal of surplus earth as directed by engineer in chargeupto distance of 30m from thefoundation trenches for other structure. |
2 | E/W in foundation in dry and wet soil including lift upto 1.5m and lead upto 30m with back filling, watering & ramming of excavated earth into the stuctures and the side of foundation trenches or in to the plinth with removal and disposal of surplus earth as directed by engineer in charge up to 30m lead including all cost of labour T&p etc complete |
3 | Providing concrete for plain concrete M 10grade in foundations including cost of finishing and excluding reinforcement in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20-40 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete, including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. |
4 | Providing concrete for plain concrete M 15grade in foundations including cost of curing etc and excluding reinforcement in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 16-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curingcomplete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. |
5 | Providing concrete for Reinforced cement concrete M20grade in foundations including cost of finishing etc and excluding reinforcement in 1:1.5: 3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 13-20 mm nominal size) mechanically mixed, placed in foundation and compacted by vibration including curing complete including overhead charges & Contractors profitwith supply of material T&P etc complete but excluding GST. |
6 | Centering shuttering in special type of RCC work such as curves,T-beams,Bridges and syphons etcincluding line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc |
7 | Centering and shuttering in concrete work foundation including line and levelling etc to required level with properly fixing and sealing the end with all cost of labour material etc |
8 | Supplying,cutting binding and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including overhead charges & Contractors profit but excluding GST. Total Weight of Steel |
9 | LayingStone Ballast(45-63mm in Layers for Retaining wall, wing wall etc with all cost of material,taxes,royalty,labours T&Ps etc complete excluding GST. |
10 | Layingsand in Layers for foundation etc material with all cost of material, taxes, royalty, labours T&Ps etc complete excluding GST. |
11 | Surface dewatering of foundation including all arrangement in kwh by diesel pump set. |
12 | Brick work in 1:4 cement mortar up to 3M lift & 60 M lead of materials. Including cost of labour,material,T&P etc complete. |
13 | Cement pointing /Plastering 1:3 on brick masonry including all cost of labour,material T&P etc complete. |