Water Resources Department-WRD has published Construction Of A Pressurized Pipe Irrigation Network System To Supply Water From Submergence Of Dhuty Weir In Distt Balaghat Near Head Regulator Of Dhuty L.B.C. Through Rising / Gravity Mains For Hose Irrigation To Deliver At Farmer’S Field Up To 5 Ha C. Submission Date for this Tender is 26-10-2022. Water Supply Project Tenders in balaghat Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 26-Sep-2022 | volume III Technical specification | Other | 07-10-2022 |
2 | 28-Sep-2022 | Electrical facility | Technical Bid | 07-10-2022 |
3 | 03-Oct-2022 | Date Amendment | Date | 26-10-2022 |
4 | 04-Oct-2022 | price adjustment clause GST | Technical Bid | 26-10-2022 |
5 | 07-Oct-2022 | regarding work and other | Technical Bid | 26-10-2022 |
6 | 12-Oct-2022 | Change in PAC and Duration as compared to NIT | Technical Bid | 26-10-2022 |
Sl. No. | Item Description |
1 | Construction of a Pressurised Pipe irrigation network system to supply water from submergence of Dhuty Weir in Distt Balaghat near head regulator of Dhuty L.B.C. through Rising/ gravity mains for hose irrigation to deliver at farmer’s field up to 5 HA ChakField with a duty of 0.45 lit/sec/Ha and maintained up to 5.00 ha chak, keeping the discharge of minimum 10 times the duty at 5.00 hectare and at least 8 Meter Residual Head at the highest point of each 5.00 ha chak by rotation with a total power requirement of 4.68 MW in the Culturable Command Area of 9630 Hectare for Kharif (Paddy) out of GCA 12250 Ha, fully covering the entire compact and contiguous possiblearable area as per the index map covering 55 villages as per attached list, for Micro Irrigation System under LAMTA PRESSURISED PIPE IRRIGATION PROJECT (HOSE SYSTEM) of distt Balaghat (M.P.). it includes all activities starting from survey, investigations, Land Acquisition of private and Forest land, designing, preparation and submission of drawings, estimates and its approval from competent authorities including procurement, construction, laying, installing and testing of Piped Irrigation Network (PIN) consisting of gravity main, main lines, branch lines with all allied inline structures, distribution network including controlling and regulation systems, including construction ofcross drainage work and aqueduct on major river, for supply of water for irrigation under pressure with SCADA and automation. The work also includes Watch and ward, Management, Operation and Maintenance (MOM) for theperiod of 60 months after completion and further extendable for another 60 months, and 60 months of defect liability period running simultaneously, with formation of WUAs and establishment of Farmers Service Centre on turnkey basis |
2 | Construction of a Pressurised Pipe irrigation network system to supply water from submergence of Dhuty Weir in Distt Balaghat near head regulator of Dhuty L.B.C. through Rising/ gravity mains for hose irrigation to deliver at farmer’s field up to 5 HA ChakField with a duty of 0.45 lit/sec/Ha and maintained up to 5.00 ha chak, keeping the discharge of minimum 10 times the duty at 5.00 hectare and at least 8 Meter Residual Head at the highest point of each 5.00 ha chak by rotation with a total power requirement of 4.68 MW in the Culturable Command Area of 9630 Hectare for Kharif (Paddy) out of GCA 12250 Ha, fully covering the entire compact and contiguous possiblearable area as per the index map covering 55 villages as per attached list, for Micro Irrigation System under LAMTA PRESSURISED PIPE IRRIGATION PROJECT (HOSE SYSTEM) of distt Balaghat (M.P.). it includes all activities starting from survey, investigations, Land Acquisition of private and Forest land, designing, preparation and submission of drawings, estimates and its approval from competent authorities including procurement, construction, laying, installing and testing of Piped Irrigation Network (PIN) consisting of gravity main, main lines, branch lines with all allied inline structures, distribution network including controlling and regulation systems, including construction ofcross drainage work and aqueduct on major river, for supply of water for irrigation under pressure with SCADA and automation. The work also includes Watch and ward, Management, Operation and Maintenance (MOM) for theperiod of 60 months after completion and further extendable for another 60 months, and 60 months of defect liability period running simultaneously, with formation of WUAs and establishment of Farmers Service Centre on turnkey basis |