| 1 | REJUVENATION |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 moutside the periphery of the area cleared. |
| 3 | Clearence of different types and nature of water Hyacinths, Aquatic weeds, Taranies, Dalanies, Pitanies repeated vegitation etc from pond and marshy areas dragging manually with necessary ropes, bamboos, chains and other debries devices etc making patches, cutting into pieces with the help of kniefs/sickles/sewa are necessary and depositing and stocking in the marginal areas of the pond/marcy area in a regular form of bundahs or heaps within a lead of 100 m and lift upto 250 cm as per direction of the department etc complete as necessary and directed.Medium and floating water Hyacinths, Aquatic weeds, Taranies, Dalanies, Pitanies repeated vegitation etc upto a depth of 80 to 120 cm. |
| 4 | Removal water Hyacinths, Aquatic weeds, Taranies, Dalanies, Pitanies repeated vegitation etc cleared from the pond and kept at site by carriage, loading & unloading by using truck/tipper and disposing the same at dumping ground at a distance of 3 km from the work site as necessary and directed. |
| 5 | Single bamboo spur and palisading of whole 2nd class bamboo (jati or bethua) 65mm to 75mm dia and closely packed & driven, including fitting, fixing with half bamboo kamies horizontally in three rows with cane or tying wire complete and struts 1500mm apart longitudinally and providing brush wood as per drawing and technical specifications clause 1302.5 |
| 6 | Earth work in surface excavation not exceeding 30 cm in depth butexceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:2.1.1 All kinds of soil |
| 7 | Construction of embankment with approved material obtained from borrow pits of embankment with approved materials obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting p g to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical specification clause 301.5(i) Private land (Maintaining a Extra lead beyond initial lead of 3.0km considered for additional 3.00km |
| 8 | Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates with 4 mm dia Gl wire conforming to lS:280 and lS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each as per drawing and technical specifications |
| 9 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause1302 |
| 10 | Providing and laying pitching on slopes laid over prepared filter medialas per drawing and technical specifications Clause 1302 |
| 11 | Turfing wlth Sods (Furnishing and laying of the sqm 31.00 live sods ofperennialturfforminggrassonembankmentslope, vergesorotherlocationsshownonthedrawingoras directed by the engineer Including preparation of ground, fetching of rods and watering) |
| 12 | Spraying ofdisinfectant like llme , bleaching powderetc for a period of 1 year for controllingcontamination of water and malntalng hygiene as necessaryand directed |
| 13 | BEAUTIFICATION |
| 14 | Finishing with Epoxy paint (two or more coats) at all locations preparedand applied as per manufacturer\"s specifications including appropriatepriming coat, preparation of surface, etc. complete.13.52.1 On steel work |
| 15 | 13.52.2 On concrete work |
| 16 | Sipplying, fitting, & fixing of solar street light of 50 watt, 150 watt solar panel, 46 Ah LT battery, 6.00 metre G.I pole with necessary CC foundation |
| 17 | Planting of trees and their Maintanence for three year (Planting of trees by the road side (Avenue trees) in 0.60 m dia holes, 1 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, planting the saplings, backfilling the trench, watering, fixing the tree guard and maintaining the plants for three years. |
| 18 | Operation & Maintenance cost for five years |