Specification For Supply Of Materials, Fabrications And Erection Of 230 Kv Bus Side Ab Switch In 230 Kv Autotransformer I Of Theni 230 110 Kv Ss Under Theni Operation Division Tantransco Under Psdf Scheme Ii - 1 Earth Work Excavating Depositing

Issued by Boards / Undertakings / PSU · theni, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Oct 2022
0 days left
EMD
3000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
theni → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Specification For Supply Of Materials, Fabrications And Erection Of 230 Kv Bus Side Ab Switch In 230 Kv Autotransformer I Of Theni 230 110 Kv Ss Under Theni Operation Division Tantransco Under Psdf Scheme Ii - 1 Earth Work Excavating Depositing On Bank With An Initial Lead Of 10M And Lift Of 2 M In ( As Per Pwd Schedule Of Rates- Double Rate For Narrow Excavation And Data A ) Hard Stiff Clay, Stiff Black Cotton , Hard Red Earth , Shales Muram, Grave Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil ( Pwd Sch .Rates ) Sl No 60 2 B ) Soft Disintegrated Rock , Latterite Soft Rock Or Kankar Not Requiring Blastingsl.No: 62 3 C ) Earth Work Excavating Depositing On Bank With An Initial Lead Of 10M And Lift Of 2 M In Medium Rock And Dense Medium Rock Not Requiring Blasting ( As Per Pwd Schedule Of Rates - Double Rate For Narrow Excavating And Data A ) Sl No 64 4 Pcc 1:3:6 Using 40 Mmhbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete With Form Work. 5 Pcc 1:3:6 Using 40 Mmhbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete With Form Work. 6 Plastering With Cm 1:3, 12 Mm Thick Including Cost Of All Materials, Lead, Lift, Curing Etc., Complete ( As Per Data D & G ) 7 Supplypaint Of Reputed Make And Labour, Consumables For First Primer Coat Using Red Oxide Paintand First Finish Coat Of Painting Using Aluminium Paintincluding Consumables, After Proper Surface Preparation Using Appropriate Machinery To Remove Rust / Scales Etc As Directed By The Field Engineer 8 Supply Of Paint Of Reputed Make ( Ieasian, Dulux, Nerolec Paint ) And Labour For Second Coat Of Painting Using Aluminium Paint Including Consumables 9 White Washing Two Coats Using Cement Paint Over Primer Coat Using White Cement Including Cost Of All Materials Labour Lead Lift Etc Complete. 10 Colour Washing Two Coats With Approved Exterior Emulsionover One Coat Of White Cement Primer For Structure Plinth Including Cost Of All Materials, Labour, Lead, Lift Etc., Complete. 11 Labour, Machinery, Consumables For The Fabrication For Steel Structures.With Electricity Supplied By Department At Free Of Cost. A ) Heavy Section ( 14 Kg / M And Above ) 12 Labour, Machinery, Consumables For The Fabrication For Steel Structures.With Electricity Supplied By Department At Free Of Cost. B ) Light Section ( Below 14 Kg / M ) 13 Labour For The Erection Of The Fabricated Steelstructures With Electricity Supplied By Department At Free Of Cost. A ) Heavy Section ( 14 Kg / M And Above ) 14 Labour For The Erection Of The Fabricated Steelstructures With Electricity Supplied By Department At Free Of Cost. B ) Light Section ( Below 14 Kg / M ) 15 Labour, Machinery, Consumables For Fabrication, Erection Of Earthmat, Earth Connection, Earth Electrode, Earthspike ( Including Sharpening Of Earth Spike ) . As Directed By The Field Engineer With Electricity Supplied By Department At Free Of Cost. 16 Labour For Excavating And Refilling Of Earth / Trench For Earthmat, Cable, Etc., Of Any Size / Depth Narrow Excavation As Directed By The Field Engineer. Normal Clay / Hard Gravel Soil. 17 Labour For Dismantling Of Isolators Including Accessories, Cost Ofconsumables And Lubricants And As Directed By The Field Engineer. With Electricity Supplied By Department At Free Of Cost. 230 Kv With Earth 18 Labour For Erection Of Isolators With Proper Allingmentsincluding Accessories, Meggering And Cost Ofconsumables And Lubricants And As Directed By The Field Engineer. With Electricity Supplied By Department At Free Of Cost. 230 Kv With Earth 19 Labour For The Dismantling Of Jumper / Droppers Using A ) Moose / Zebra / Panther Conductors Including Modification Of End Clamps, Providing Holes Etc Wherever Necessary As Directed By The Field Engineer. ( Lc Period 30 % Extra ) 20 Labour For The Erection Of Jumper / Droppers Using A ) Moose / Zebra / Panther Conductors Including Modification Of End Clamps, Providing Holes Etc Wherever Necessary As Directed By The Field Engineer. ( Lc Period 30 % Extra ) 21 Supply And Provision Of M8, M10, M12 And M16 ( Full / Half Thread ) G.I.Bolt And Nuts Of Various Sizes Including Plate / Spring Washers As Required And As Directed By The Field Engineer. 22 Supply Of Aluminium Power Connectors / Clamps / Fittings With Ss Bolts And Nuts , Freight Including Modification If Any Etc., Confirming To Isas Per The Drawing And Specifications . ( Sl 83 ) A ) Acsr Panther Conductor 23 Supply Of Steel Items And Ab Switches As Per Tneb Specification Including Cost Of Materials, Loading, Transporting, Unloading And Delivery At Site, Complete. A ) 50 X 8 Mm M.S. Flat 24 B ) 65 X 10 Mm M.S. Flat 25 C ) 200 X 100 Mm R.S. Joists 26 D ) 50 X 50 X 6 Mm M.S. Angle 27 F ) 100 X 50 Mm M.S. Channel

BOQ

Name of work : Supply of steel materials, fabrication and Erection of 230 KVBus sideAB Switch at230 /110 KV Autotransformer I at 230 KVTheni SS by works contract
Sl. No. Item Description
1Earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in (as per PWD schedule of rates- double rate for narrow excavation and data a) Hard stiff clay, stiff black cotton , hard red earth , shales muram, grave stoney earth and earth mixed with small size boulders and hard gravelly soil ( PWD sch .rates) sl no 60
2b) Soft disintegrated rock , latterite soft rock or kankar not requiring blastingSl.No: 62
3c) Earth work excavating depositing on bank with an initial lead of 10m and lift of 2 m in medium rock and dense medium rock not requiring blasting ( as per PWD schedule of rates - double rate for narrow excavating and data A) sl No 64
4PCC 1:3:6 using 40 mmHBS jelly including cost of all materials, lead, lift, etc., complete with form work.
5PCC 1:3:6 using 40 mmHBS jelly including cost of all materials, lead, lift, etc., complete with form work.
6Plastering with CM 1:3, 12 mm thick including cost of all materials, lead, lift, curing etc., complete(as per data D & G )
7Supplypaint of reputed make and Labour, consumables for first primer coat using red oxide Paintand first finish coat of Painting using Aluminium Paintincluding consumables, after proper surface preparation using appropriate machinery to remove rust/scales etc as directed by the field engineer
8Supply of paint of reputed make ( ieAsian, Dulux, Nerolec paint) and Labour for Second coat of Painting using Aluminium paint including consumables
9White washing two coats using cement paint over primer coat using white cement including cost of all materials labour lead lift etc complete.
10Colour washing two coats with approved exterior emulsionover one coat of white cement primer for structure plinth including cost of all materials, labour, lead, lift etc., complete.
11Labour, machinery, Consumables for the Fabrication for steel structures.with electricity supplied by Department at free of cost. A) Heavy section (14 kg/m and above)
12Labour, machinery, Consumables for the Fabrication for steel structures.with electricity supplied by Department at free of cost. B) Light section (below 14 kg/m)
13Labour for the Erection of the Fabricated SteelStructures with electricity supplied by Department at free of cost. A) Heavy section (14 kg/m and above)
14Labour for the Erection of the Fabricated SteelStructures with electricity supplied by Department at free of cost. B) Light section (below 14 kg/m)
15Labour, machinery, consumables for fabrication, erection of earthmat, earth connection, earth electrode, earthspike (including sharpening of earth spike). As directed by the field engineer with electricity supplied by Department at free of cost.
16Labour for excavating and refilling of earth /trench for earthmat, cable, etc., of any size/depth narrow excavation as directed by the field engineer. Normal Clay/ Hard gravel soil.
17Labour for Dismantling of Isolators including accessories, cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by Department at free of cost. 230 KV with Earth
18Labour for erection of Isolators with proper allingmentsincluding accessories, Meggering and cost ofconsumables and lubricants and as directed by the field engineer. with electricity supplied by Department at free of cost. 230 KV with Earth
19Labour for the Dismantling of Jumper/ Droppers using a)Moose /Zebra /panther Conductors including Modification of End clamps, providing holes etc wherever necessary as directed by the field engineer.( LC period 30 % extra)
20Labour for the Erection of Jumper/ Droppers using a)Moose /Zebra /panther Conductors including Modification of End clamps, providing holes etc wherever necessary as directed by the field engineer.( LC period 30 % extra)
21Supply and provision of M8,M10,M12 and M16 (full /Half thread)G.I.bolt and nuts of various sizes including plate/spring washers as required and as directed by the field engineer.
22Supply of Aluminium Power connectors / clamps/ fittings with ss bolts and nuts , freight including modification if any etc., confirming to ISas per the drawing and specifications .( SL 83) a) ACSR Panther conductor
23Supply of steel items and AB Switches as per TNEB specification including cost of materials, loading, transporting, unloading and delivery at site,complete. A) 50 X 8 mm M.S. Flat
24B) 65 X 10 mm M.S. Flat
25C) 200 X 100 mm R.S. Joists
26D) 50 X 50 X 6 mm M.S. Angle
27F) 100 X 50 mm M.S. Channel
28SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as \"0\" only
29CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as \"0\" only
30Inter-state GST to be quoted in percentage (value alone) Ex. 18%, it should be entered as 18 only for other than Tamil Nadu contractor. If the contractor is within Tamil Nadu may be quoted as \"0\" only

AI Tender Summary

OUR REF NO 34073457
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 06-10-2022
Authority
Authority Name Tamil Nadu Transmission Corporation Limited
Work Description Specification For Supply Of Materials, Fabrications And Erection Of 230 Kv Bus Side Ab Switch In 230 Kv Autotransformer I Of Theni 230 110 Kv Ss Under Theni Operation Division Tantransco Under Psdf Scheme Ii - 1 Earth Work Excavating Depositing On Bank With An Initial Lead Of 10M And Lift Of 2 M In ( As Per Pwd Schedule Of Rates- Double Rate For Narrow Excavation And Data A ) Hard Stiff Clay, Stiff Black Cotton , Hard Red Earth , Shales Muram, Grave Stoney Earth And Earth Mixed With Small Size Boulders And Hard Gravelly Soil ( Pwd Sch .Rates ) Sl No 60 2 B ) Soft Disintegrated Rock , Latterite Soft Rock Or Kankar Not Requiring Blastingsl.No: 62 3 C ) Earth Work Excavating Depositing On Bank With An Initial Lead Of 10M And Lift Of 2 M In Medium Rock And Dense Medium Rock Not Requiring Blasting ( As Per Pwd Schedule Of Rates - Double Rate For Narrow Excavating And Data A ) Sl No 64 4 Pcc 1:3:6 Using 40 Mmhbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete With Form Work. 5 Pcc 1:3:6 Using 40 Mmhbs Jelly Including Cost Of All Materials, Lead, Lift, Etc., Complete With Form Work. 6 Plastering With Cm 1:3, 12 Mm Thick Including Cost Of All Materials, Lead, Lift, Curing Etc., Complete ( As Per Data D & G ) 7 Supplypaint Of Reputed Make And Labour, Consumables For First Primer Coat Using Red Oxide Paintand First Finish Coat Of Painting Using Aluminium Paintincluding Consumables, After Proper Surface Preparation Using Appropriate Machinery To Remove Rust / Scales Etc As Directed By The Field Engineer 8 Supply Of Paint Of Reputed Make ( Ieasian, Dulux, Nerolec Paint ) And Labour For Second Coat Of Painting Using Aluminium Paint Including Consumables 9 White Washing Two Coats Using Cement Paint Over Primer Coat Using White Cement Including Cost Of All Materials Labour Lead Lift Etc Complete. 10 Colour Washing Two Coats With Approved Exterior Emulsionover One Coat Of White Cement Primer For Structure Plinth Including Cost Of All Materials, Labour, Lead, Lift Etc., Complete. 11 Labour, Machinery, Consumables For The Fabrication For Steel Structures.With Electricity Supplied By Department At Free Of Cost. A ) Heavy Section ( 14 Kg / M And Above ) 12 Labour, Machinery, Consumables For The Fabrication For Steel Structures.With Electricity Supplied By Department At Free Of Cost. B ) Light Section ( Below 14 Kg / M ) 13 Labour For The Erection Of The Fabricated Steelstructures With Electricity Supplied By Department At Free Of Cost. A ) Heavy Section ( 14 Kg / M And Above ) 14 Labour For The Erection Of The Fabricated Steelstructures With Electricity Supplied By Department At Free Of Cost. B ) Light Section ( Below 14 Kg / M ) 15 Labour, Machinery, Consumables For Fabrication, Erection Of Earthmat, Earth Connection, Earth Electrode, Earthspike ( Including Sharpening Of Earth Spike ) . As Directed By The Field Engineer With Electricity Supplied By Department At Free Of Cost. 16 Labour For Excavating And Refilling Of Earth / Trench For Earthmat, Cable, Etc., Of Any Size / Depth Narrow Excavation As Directed By The Field Engineer. Normal Clay / Hard Gravel Soil. 17 Labour For Dismantling Of Isolators Including Accessories, Cost Ofconsumables And Lubricants And As Directed By The Field Engineer. With Electricity Supplied By Department At Free Of Cost. 230 Kv With Earth 18 Labour For Erection Of Isolators With Proper Allingmentsincluding Accessories, Meggering And Cost Ofconsumables And Lubricants And As Directed By The Field Engineer. With Electricity Supplied By Department At Free Of Cost. 230 Kv With Earth 19 Labour For The Dismantling Of Jumper / Droppers Using A ) Moose / Zebra / Panther Conductors Including Modification Of End Clamps, Providing Holes Etc Wherever Necessary As Directed By The Field Engineer. ( Lc Period 30 % Extra ) 20 Labour For The Erection Of Jumper / Droppers Using A ) Moose / Zebra / Panther Conductors Including Modification Of End Clamps, Providing Holes Etc Wherever Necessary As Directed By The Field Engineer. ( Lc Period 30 % Extra ) 21 Supply And Provision Of M8, M10, M12 And M16 ( Full / Half Thread ) G.I.Bolt And Nuts Of Various Sizes Including Plate / Spring Washers As Required And As Directed By The Field Engineer. 22 Supply Of Aluminium Power Connectors / Clamps / Fittings With Ss Bolts And Nuts , Freight Including Modification If Any Etc., Confirming To Isas Per The Drawing And Specifications . ( Sl 83 ) A ) Acsr Panther Conductor 23 Supply Of Steel Items And Ab Switches As Per Tneb Specification Including Cost Of Materials, Loading, Transporting, Unloading And Delivery At Site, Complete. A ) 50 X 8 Mm M.S. Flat 24 B ) 65 X 10 Mm M.S. Flat 25 C ) 200 X 100 Mm R.S. Joists 26 D ) 50 X 50 X 6 Mm M.S. Angle 27 F ) 100 X 50 Mm M.S. Channel
Basic Detail
Tender No ET/EEOTHENI/007
Bidding Type Tender
Location
City theni
State Tamil Nadu
Key Dates
Publish Date 23 Sep 2022
Submission Date 06 Oct 2022
Open Date 07 Oct 2022
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 3000
Exemption Not Available
Document List
1aa834e2-c878-4c45-9f50-d00fb316bd5d.html
BOQ_299592.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 23, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 06, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 07, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

1aa834e2-c878-4c45-9f50-d00fb316bd5d.html

xls

BOQ_299592.xls

pdf

Tendernotice_1.pdf

TenderDetail
Loading tenders