| 1 | LAYING OF PIPE LINE |
| 2 | Earth work in all kinds of soil in excavation of foundation with in 50m initial lead & 1.50m initial lift including rough dressing & breaking clods to max 5cm to 7 cm & layers not exceeding 0.30mtr. in depth & as per direction of Engineer-in charge. |
| 3 | Supplying all labour, T&P for filling in foundation & plinth with excavated materials, moorum including watering, ramming etc. as directed by Engineer-in-charge of the department. |
| 4 | Supplying all labour, T&P, laying of HDPE pipes and specials in pipe line trenches of the out side following diameter for all classes including cost of HDPE fitting of (PE 80 PN-08) presure ratingjointing, fitting and fixing of pipes, testing of pipe line etc all complete (earth work and refilling of excavated material in trenches to be measured (separately ) |
| 5 | 110mm HDPE pipe(PE 80,PN- 08) |
| 6 | Supplying all labour T&Pfor fixing of C.I. sluice valve /Non-return valve with double flanged ends for water works purposes for the following rating & nominal dia. (including cost of bolts, nuts, rubber insertion, but excluding cost of C.I.S.V./N.R.V. )as per specification complete as per direction of engineer-in-charge of the department. |
| 7 | .100mm Sluice Valve |
| 8 | .100mm N.RValve |
| 9 | 15 mm to 25mmdia single air valve |
| 10 | Supply all labour T&P for construction of brick masonry sluice valve chamber and N.R valve chamber of inside dimesion. (0.9 x 0.9 x 1.2mtr) as spicification drawing. |
| 11 | Supply all labour T&P for construction of brick masonry Air valve chamber of inside dimesion. (0.75 x 0.75 x 1.2mtr) as per spicification drawing. |
| 12 | Transporting and supplying all materials labour and T & P fabricating, fitting and fixing with special at the required site using electic resistence welded pipes of medium quality and standard weight of reputed make ( TATA/ BANSAL/ZINDAL/SAIL) confirming to including cutting the pipes and flanges, drilling the bolt holes matching the pipes flanges and jointing with proper gradient and alignment, welding with using eloctrodes, fitting, fixing using mobile disel generator set etc. complete as per direction of engineer in charge to be used for connection with water tank, the cross drainage work,lowering of pumps etc. complete. |
| 13 | 100mm G.IPipe |
| 14 | Cutting |
| 15 | Welding |
| 16 | 20mm (3/4\") thick cement plaster (1:4) finished smooth to out side of RCC wall inside the tank after raking out the joint including, watering and curing with cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalties etc. complete as per the direction of the Engineer-in-charge.(Fouth Floor) |
| 17 | Supplying all materials, labour and T&P for providingplastic emulsion painting two coat over plastered surface including cost, lead and royalty of all materialsetc. complete as per the direction of the Engineer-in-charge. |
| 18 | Supplying all labour, T&P, materials providing painting two coats on new works withapproved enamel paint including cost of paint. |
| 19 | Boundary wall around OGR |
| 20 | Earth work in all kinds of soil in excavation of foundation with in 50m initial lead & 1.50m initial lift including rough dressing & breaking clods to max 5cm to 7 cm & layers not exceeding 0.30mtr. in depth & as per direction of Engineer-in charge. |
| 21 | Supplying , all labour material &T&P for filling of sand in foundation and plinth including watering & ramming etc all complete . |
| 22 | Supplying all labour T&P materials providing cement concrete (1:4:8) with 40mm HBG metals including cost, conveyance & royalty of materials etc. all complete. |
| 23 | Supplying all labourT&P, materials providing random rubble HG stone masonry in CM(1:6) in foundation & plinth including cost conveyance & royalty of materials etc. all complete. |
| 24 | Rigid & smooth Centering & Shuttering for RCC Works including false work & dismantlingthen after casting including cost ofmaterials complete in ground floor. |
| 25 | Supplying all labour, T&P materials providing RCC work of M-20 grade with 20mm & down grade black hard granite hand broken stone chips including hosting & laying cost, conveyance and royalty of materials etc. all complete. |
| 26 | Supplying all labour, T&P, materials providing brick work with C.B. Bricks of size having crushing strength not less then 35kg/Cm2 in C.M (1:6) in super structure including cost, conveyance royalty of materials etc. all complete. |
| 27 | Supplying , fitting & Placing uncoated HYSD Bar reinforcement complete as per Drawing & Technical Specification etc. all complete |
| 28 | Supplying of all materials,labour and T&P for fabricating and fixing of M.S doors ,windows and grillsmade out of suitable size of M.S.angles and plate with grills for windows with necessary fittings like hinges,aldrops,tower bolts etc all complete and painted with one coat of primer including fixing in the wall with cement concrete grouting |
| 29 | Supplying all labour, T&P materials providing 12mm thick cement plastering in C.M (1:6) including cost, conveyance & royalty of materials etc. all complete. |
| 30 | Supplying all labour, T&P materials providing 20mm thick cement plastering in CM(1:6) including cost, conveyance & royalty of materials of stone masonry work. |
| 31 | Finishing walls with two coats water proof cement paintincluding cost of paint |
| 32 | Supplying all labour, T&P, materials providing painting two coats on new works withapproved enamel paint including cost of paint. |