Construction Of Compound For Govt Higher Primary School Of T Gopagondanahalli Village Construction Of Compound For Govt Higher Primary School Of T Gopagondanahalli Village , Transportation / Loading And Unloading Of Material / Lifting Of Mat
Tender Overview
Project Description
Construction Of Compound For Govt Higher Primary School Of T Gopagondanahalli Village Construction Of Compound For Govt Higher Primary School Of T Gopagondanahalli Village , Transportation / Loading And Unloading Of Material / Lifting Of Material / Wastage / Unforeseen Charges / Miscellaneous Which Are Necessary During Execution., Add Brush, Putty, Sand Paper At 2% On Cost Of Paint, Add Handling , Loading And Unloading At 2% On Material, Add Sundries Charges At 1 % On Material, Add Sundries Charges At 2 % On Material, Add Watering Charges At 1 % On Material, Broken Stone Aggregate 12 Mm To 10 Mm Size, Broken Stone Aggregate 20 Mm Size, Casurina Poles 100 - 150 Mm, Coarse Sand ( Zone Iii ) , Granite / Trap Broken Metal 100 Mm And Down Size, Mixer ( Concrete ) - 1 Cum Capacity, Portland Cement, Silver Oak Or Equivalent Planks 38 Mm Thick, Water Proofing Cement Paint, Add Providing And Removing Scaffolding At 3% Ii Labour, Add Handling , Loading And Unloading At 1% On Material, Binding Wire, Bolts And Nuts, Hom Of Vibrator 0.71 Days, Hollow Concrete Blocks ( 40*20*20 Cms ) -3.50 N / Sqmm, Jungle Wood Runners And Planks, Ms Flat, Mason Class I ( With Tools ) , Mixer ( Concrete Small Used In Culvert ) , Painter Class I, Plasticizer / Super Plasticizer, Tmt Bars Fe 500, Broken Stone Aggregate 40 Mm Size
BOQ
| Sl. No. | Item Name |
| 1 | \"Transportation/loading and unloading of material/lifting of material /Wastage/Unforeseen charges/Miscellaneous which are necessary during execution.\" |
| 2 | Add Brush, putty, sand paper at 2% on cost of paint |
| 3 | Add Handling , loading and unloading at 2% on Material |
| 4 | Add sundries charges at 1 % on Material |
| 5 | Add sundries charges at 2 % on Material |
| 6 | Add watering charges at 1 % on Material |
| 7 | Broken stone aggregate 12 mm to 10 mm size |
| 8 | Broken stone aggregate 20 mm size |
| 9 | Casurina poles 100 - 150 mm |
| 10 | Coarse sand (zone III) |
| 11 | Granite/trap broken metal 100 mm and down size |
| 12 | Mixer (concrete) - 1 cum Capacity |
| 13 | Portland Cement |
| 14 | Silver oak or equivalent planks 38 mm thick |
| 15 | water proofing cement paint |
| 16 | \"Add providing and removing scaffolding at 3% II Labour\" |
| 17 | Add Handling , loading and unloading at 1% on Material |
| 18 | Binding wire |
| 19 | Bolts and nuts |
| 20 | HOM of Vibrator 0.71 days |
| 21 | Hollow concrete blocks (40*20*20 cms)-3.50 N/Sqmm |
| 22 | Jungle wood runners and planks |
| 23 | MS flat |
| 24 | Mason Class I (with tools) |
| 25 | Mixer (concrete small used in culvert) |
| 26 | Painter Class I |
| 27 | Plasticizer / super plasticizer |
| 28 | TMT bars Fe 500 |
| 29 | Broken stone aggregate 40 mm size |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender