On Turn Key Basis Construction Of Hatpipaliya Pressurized Pipe Lift Irrigation Project
Tender Overview
Project Description
On Turn Key Basis Construction Of Hatpipaliya Pressurized Pipe Lift Irrigation Project
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-Sep-2022 | Amendment | Technical Bid | 07-Oct-2022 |
| 2 | 23-Sep-2022 | AMENDMENT AS PER ATTACHED DOCUMENT | Other | 07-Oct-2022 |
| 3 | 30-Sep-2022 | AMENDMENT ACCORDING TO ATTACHED DOCUMENT | Technical Bid | 07-Oct-2022 |
| 4 | 04-Oct-2022 | AMENDMENT PRICE ADJUSTMENT | Technical Bid | 14-Oct-2022 |
| 5 | 04-Oct-2022 | Date Amendment | Date | 14-Oct-2022 |
| 6 | 04-Oct-2022 | INDEX MAP | Other | 14-Oct-2022 |
| 7 | 06-Oct-2022 | amendment volume 2 and vol 3 | Technical Bid | 14-Oct-2022 |
| 8 | 07-Oct-2022 | Amendment in Additional Affidavit | Technical Bid | 14-Oct-2022 |
| 9 | 10-Oct-2022 | amendment as per attached document | Other | 14-Oct-2022 |
| 10 | 10-Oct-2022 | amendment regarding GST | Other | 14-Oct-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Construction, operation and maintenance of Piped Irrigation system to supply water through pressurized pipeline system for Hatpipliya Micro Lift Irrigation Scheme |
| 2 | Construction, operation and maintenance of Piped Irrigation system to supply water through pressurized pipeline system for micro Irrigation (Drip/Sprinkler) to deliver at farmer’s fields up-to centerof2.50 Ha.Chak with a duty of 0.33 Lit/Sec/Ha. and maintained upto 20 Ha chak keeping the dischare of minimum 10 times the duty at 2.5 Ha and at least 23 Meter Residual Head at highest point of each 2.50 Ha. chak with total power requirement of 119.30 MW in Culturable command area of 129903 Ha, out of gross command area 173850 Ha. Fully covering the entire compact and contiguous possible arable area and any arable area found in excess should be dropped at the tail end as indicated in index map for micro irrigation system. The work includes all activities i.e. survey, investigation, designing drawing, obtaining approval from competent authority, procurement, construction of pump houses ,laying of rising/ gravity mains, branch lines , distribution network, controlling and regulation of system with SCADA with full automation. Preparation of land acquisition cases and compliances, pursuing for final award, preparing, complying and pursuing cases for obtaining statutory clearances including forest, environmental clearances from respective departments of GoI and GoMP, construction of permanent & temporary buildings for official and residential purpose, approach roads and other required works as directed by Engineer in charge. Work also includes upgradation, operation & maintenance of existing chandrakeshar, koop and paras tank to serve as balancing reservoirs. The work also includes Management, Operation and Maintenance (MOM) for the period of 60 months after completion and further extendable for another 60 months including 60 months defect liability period running simultaneously. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender