Construction Of Desliting Pond Work At Getticheviyur In Nambiyur Block Under Agamt Ii 2021-22
Tender Value
20.69 Lakhs
Estimated cost
Bid Submission
26 Sep 2022
0 days left
EMD
21000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nambiyur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Construction Of Desliting Pond Work At Getticheviyur In Nambiyur Block Under Agamt Ii 2021-22
BOQ
| Sl. No. | Item Description |
| 1 | Name of the Work : PROVIDING VILLAGE HAAT AT Getticheviyur H/o Getticheviyur |
| 2 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 3 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications. |
| 4 | Filling the Basement with conveyed Gritty Gravel in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete. |
| 5 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforRCCcolumn, column footing,plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc complete |
| 6 | Above Ground Level |
| 7 | RCC 1:1.5 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excludingcentering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixingfan clamps and ixtures in rcc works etc., complete. |
| 8 | Brickwork in CM 1:5 mix using country bricksof size83/4\"x43/8\"x23/4\" including cost and conveyance of all materials etc., complete. |
| 9 | Cement concrete 1:2:4 mix using 20mm iss HBG metal for foundation & flooring including labour charges etc., complete |
| 10 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 11 | Plastering with cm 1:5 mix to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 12 | Plastering with cm 1:3 mix to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 13 | Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete. |
| 14 | Supplying and fixing of roof struss for Tubular section 4\"x2\" -23 length and Tubular section size 7.00m including all cost and conveyance ofmaterials to site |
| 15 | Supplying and fixing of Purlin using Tubular section size 75x40mm long - 15m including all cost and conveyance ofmaterials to site . |
| 16 | Supplying and fixing of Powder coated GI sheet (Alloy sheet) 0.45mm thick with drilling holes by punchingetc.complete |
| 17 | Provision for Toilet |
| 18 | Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification |
| 19 | Collection and supply of sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for fillingas per standard speecifications |
| 20 | Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications. |
| 21 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete |
| 22 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforRCCcolumn, column footing,plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc complete |
| 23 | Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost ofsteel and binding wire also in all floors etc., complete |
| 24 | RCC 1:1.5 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excludingcentering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixingfan clamps and ixtures in rcc works etc., complete. |
| 25 | Brickwork in CM 1:5 mix using country bricksof size83/4\"x43/8\"x23/4\" including cost and conveyance of all materials etc., complete. |
| 26 | Refilling the basement with excavated earthother than sand complying the Standard specification |
| 27 | Supply and fixing indian type water closet including all cost and conveyance an all labour charges etc., complete |
| 28 | Supply and fixing European type water closet including all cost and conveyance an all labour charges etc., complete |
| 29 | Supply and fixing colour Wash basin including all cost and conveyance an all labour charges etc., complete |
| 30 | Plastering with cm 1:3 mix to 10 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 31 | Plastering with cm 1:5 mix to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 32 | Plastering with cm 1:4 mix to 20 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications. |
| 33 | Supply of Steel andPVCDoors inclusive of all charges of cost of materials, labour etc |
| 34 | Steel Door D1 - 1.00x1.80m |
| 35 | Steel Door D2 - 1.05x2.10m |
| 36 | PVC Door D3 - 0.75x2.10m |
| 37 | Labour Charges for Fixing Steel , PVC Doors and RCC Jolly etc Complete |
| 38 | Painting two coats using Ist quality readymix enamel paint of approved colour over new iron work including cost and conveyance and all labour charges etc. |
| 39 | Distember painting two coats with approved Distember including cost and conveyance of all materials to and all labour charges etc.complete |
| 40 | Exterier Emulsion painting two coats with approved emulsion paintincluding cost and conveyance of all materials to and all labour charges etc.complete |
| 41 | Providing and fixing P.V.C. Rainwater Downfall pipes of 110mm diametre with necessary shoes, bends and other speicals, clamps, screws, nails, teakwood plugs etc., complete including cost of all materials.The rate is to include cost of removable cast iron Gratings of appropriate size.The size of teakwood plugs to be used is 150mm * 25mm in front and 200mm * 75mm in rear and all other sides with a depth of 100mm.The pipe is to be fixed by means of \"U\" clamps at the cnetre of the pipe screwed to the plugs.The special type of \"U\" clamps at the centre of the pipe to be fixed in addition to these for more than three metres pipe length, complete complying with standard specification. |
| 42 | Dadooing walls with glazed tiles of size 150x150x6mm neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. |
| 43 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm with standard specification and as directed by the departmental officers. |
| 44 | Roofing with colour coated GI sheets with all necessary fittings including cost of \" J \" boltsand bitumen washer etc.complete. |
| 45 | Supply and Delivery of 1200mm dia RCC Ringsall charges for cost of materials etc complete |
| 46 | Supply and Delivery of 600mm dia RCC Ringsall charges for cost of materials etc complete |
| 47 | Provision for Name Board |
| 48 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |
AI Tender Summary
Tender Timeline
Sep 19, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedSep 26, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 26, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender