Power Government Departments Closing in 0 days TDR #33986111

E-Tendering On Turn Key Basis For Development Of Distribution Infrastructure For Loss Reduction In District Sirmaur, Himachal Pradesh Under Rdss ( Revamped Reforms Based And Results Linked, Distribution Sector Scheme )

Issued by Government Departments · nahan, Himachal Pradesh
Tender Value
77.34 Crore
Estimated cost
Bid Submission
23 Sep 2022
0 days left
EMD
1.54 Crore
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
nahan → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

E-Tendering On Turn Key Basis For Development Of Distribution Infrastructure For Loss Reduction In District Sirmaur, Himachal Pradesh Under Rdss ( Revamped Reforms Based And Results Linked, Distribution Sector Scheme )

BOQ

Name of Work: -E-Tendering on Turn Key basis for development of Distribution Infrastructure for “Loss Reduction in District Sirmaur, Himachal Pradesh under RDSS (Revamped Reforms Based and Results Linked, Distribution Sector Scheme)
Sl. No. Item Description
1AB Cablingworks ,11 KV overhead line Ab Cabling Works as per technical specification, approved drawings and scope of work. LTAB Cable on poles [Size: (3x95 Sq, mm ) (total Qty 62 KMs)
2LT AB Cable on poles [Size: (3x95 Sq, mm ) {inclusive 3% sagging & wastage)
3Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
4Muffs with concerete filling
5Stay Set Complete
6Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
7Full Clamp for stay
8Anchoring Assembly for LT
9Suspension Assembly for LT
10Facade Hooks for LT
11Distribution Boxes as per T.S.
12Piercing Connector as per TS
13Cable for SMDB 3.5Core X 35sqmm
14T-Jointing kit
15LTEarthing set complete (preferbly coil earthing)
16Red Oxide
17Aluminium paint
18HT, UG armoured cable Cable [Size: (3x120 Sq, mm)Total 4.5 Kms
1911 kV XLPE Cable [Size: (3x120 mm²) {inclusive 1% wastage)]
2011 kV Cable Straight Through Jointing Kit [Size: 3x120 mm²]
2111 kV Cable Indoor Termination Kit [Size: 3x120 mm²]
2211 kV Cable Outdoor Termination Kit [Size: 3x120 mm²]
23RCC Hume pipe.
24RCC collar pipe
25RCC cable cover (2 feet long)
26Sand Bag (50 Kg)
27Route and Joint indicating stone
28Inspection Chamber
29GI Pipe earthing 40 mm x 2.5/3 m \"B\" class
30Pipe HDPE Size 150 mm
31Lug AL Crimping 70 SQMM XLPE Single HOLE
32Flat GI Size 25x6 mm
33Cleat HDPE for Cable Support
34G.I. Pipe 100 mm DIA \"B\" CLASS
35Flat GI Size 50x6 mm
36Channel MS Size 75x40 mm
37Restoration charges to be paid to authoroties such as local bodies, HPPWD, NHAI etc.
38HT, XLPE AB Cable [Size: (3x240Sq, mm) Total 2 Kms
39HT , AB Cable [Size: (3x240Sq, mm ) {inclusive 1% sagging & wastage)
40Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
41Muffs with concerete filling
42Stay Set Complete
43Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
44Full Clamp for stay
45X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]
46Half Clamp for Cross Arm
47Anchoring Assembly for HT
48Suspension Assembly for HT
49Facade Hooks for HT
50Heat Shrinkable Straight Through Jointing Kit
51Cable Termination kit
52T-Jointing kit
53HT Earthing set complete (preferbly coil earthing)
54Red Oxide
55Aluminium paint
56HVDS
57Conversion of LT line to 11 KV line -11kv line on Steel Tublar pole with DOG Conductor -100 Sq. mm Total 178 Kms
58ACSR 6/1/4.72 (100mm²) {Includes 3 conductor lengths for 3F and inclusive 3% (Sag, Jumpering and wastage}
59Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro\" and 3 No. Double Pole Dead End Structures)
60Muffs with concerete filling
61Run Thro\" Structures (? Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km) -
62Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 8 structure
63Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
64Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
6511 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
6611kV GI Pin.
67Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side)
68Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
69X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
70X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ? Formation
71Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
7211 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
73HT Stay / Guy Arrangement
74Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
75Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
76Earthing
77HT Earthing set complete (REC Constr. Stand. J-1)
78Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
79Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}
80Eye Hook for earth wire
81Earth Wire Clamp
82MS Channel Iron: 75x40x6, Length : 2400 mm for Road crossing
83Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro\" structure: 2 No ]
84Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro\" structure: 2 No]
85Danger Plate (250X200X1.6 mm)
86Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
87Barbed Wire
88Red Oxide
89Aluminium Paint
90New 11kv Line - 11kv line on steel tublar pole with DOG conductor Total 110 Kms
91ACSR 6/1/4.72 (50mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage}
92Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro\" and 3 No. Double Pole Dead End Structures)
93Muffs with concerete filling
94Run Thro\" Structures (? Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km) -
95Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 8 structure
96Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
97Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
9811 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
9911kV GI Pin.
100Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side)
101Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
102X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
103X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ? Formation
104Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
10511 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
106HT Stay / Guy Arrangement
107Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
108Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
109Earthing
110HT Earthing set complete (REC Constr. Stand. J-1)
111Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
112Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}
113Eye Hook for earth wire
114Earth Wire Clamp
115MS Channel Iron: 75x40x6, Length : 2400 mm for Road crossing
116Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro\" structure: 2 No ]
117Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro\" structure: 2 No]
118Danger Plate (250X200X1.6 mm)
119Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
120Barbed Wire
121Red Oxide
122Aluminium Paint
123Installation of New DT Total 765 Nos
124Distribution Transformer (Ordinary), 11/0.4 kV,10 KVA
125Distribution Transformer (Ordinary), 11/0.4 kV,16 KVA
126Distribution Transformer (Ordinary), 11/0.4 kV,25 KVA
127Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA
128Distribution Transformer (Ordinary), 11/0.4 kV,100 KVA
129Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
130Muffs with concerete filling
131X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
132MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s
133X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
134Transformer Bed, Belting & Knee Bracing
135X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
136X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer]
137MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
138MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
139MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
140Transformer LT Distribution Box and GO Switch fixing Assembly
141MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
142MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
143GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
144GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
145D.O Fuse Unit
146Lightening Arrester, 9 kV Station Class(Porcelain Type)
147Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
148Stay set complete
149Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
150Pipe Earthing Set
151LT Distribution Panel Box with MCCB(50A, 25 kA, 4P)
152LT Distribution Panel Box with MCCB(100A, 25 kA, 4P)
153LT Distribution Panel Box with MCCB(160A, 25 kA,1No) and outgoing 2 nos 100A, 25kA MCCB
154Half Clamp (M.S. Flat 50X6 mm)
155Full Clamps (M.S. Flat 50X6 mm)
156Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
157Aluminium Thimble
158Aluminium Thimble
159Danger Plate
160Barbed Wire
161Red Oxide paint.
162Aluminium Paint.
163LT Switched Capacitors 9- KVAr for 25 KVA(rate per KVAr)
164LT Switched Capacitors 9- KVAr for 63 KVA(rate per KVAr)
165LT Switched Capacitors 9- KVAr for 100 KVA(rate per KVAr)
166LT Cable (3.5 Core) 50 mm²
167LT Cable (3.5 Core) 95 mm²
168LT Cable (3.5 Core) 185 mm²
169Conversion of bare conductor with AB Cabling 3x70 Sq. mm Total 142 Kms
170LT AB CableCable on poles [Size: (70 mm²) x 1 Cables {inclusive 3% sagging & wastage)
171Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
172Muffs with concerete filling
173Stay Set Complete
174Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
175Full Clamp for stay
176Anchoring Assembly for LT
177Suspension Assembly for LT
178Facade Hooks for LT
179Distribution Boxes
180Piercing Connector as per TS
181Cable for SMDB 3.5Core X 35sqmm
182T-Jointing kit
183LTEarthing set complete (preferbly coil earthing)
184Red Oxide
185Aluminium paint
186Feeder bifurcation
187New 11kv line on 11mtr. STP pole with DOG Conductor -100 Sq. mm Total 20 Kms
188ACSR 6/1/4.72 (100mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage}
189Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro\" and 3 No. Double Pole Dead End Structures)
190Muffs with concerete filling
191Run Thro\" Structures (? Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km) -
192Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 8 structure
193Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
194Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
19511 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
19611 KV GI Pin
197Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side)
198Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
199X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
200X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ? Formation
201Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
20211 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
203HT Stay / Guy Arrangement
204Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
205Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
206Earthing
207HT Earthing set complete (REC Constr. Stand. J-1)
208Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
209Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}
210Eye Hook for earth wire
211Earth Wire Clamp
212MS Channel Iron: 75x40x6, Length : 2400 mm for Road crossing
213Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro\" structure: 2 No ]
214Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro\" structure: 2 No]
215Danger Plate (250X200X1.6 mm)
216Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
217Barbed Wire
218Red Oxide
219Aluminium Paint
220Cabling of LT line with AB Cable 3X95 Sq. mm. Total 5 Kms
221LT AB Cable/XLPE Cable on poles [Size: (95 sqmm arial bunched cable) x 1 Cables {ainclusive3% sagging & wastage)
222Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
223Muffs with concerete filling
224Stay Set Complete
225Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
226Full Clamp for stay
227Anchoring Assembly for LT
228Suspension Assembly for LT
229Facade Hooks for LT
230Distribution Boxes
231Piercing Connector as per TS
232Cable for SMDB 3.5Core X 35sqmm
233T-Jointing kit
234LTEarthing set complete (preferbly coil earthing)
235Red Oxide
236Aluminium paint
237New Distribution transformers Total 10 Nos
238Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA
239Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
240Muffs with concerete filling
241X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
242MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s
243X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
244Transformer Bed, Belting & Knee Bracing
245X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
246X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer]
247MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
248MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
249MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
250Transformer LT Distribution Box and GO Switch fixing Assembly
251MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
252MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
253GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
254GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
255D.O Fuse Unit
256Surge Arrester, 9 kV Station Class(Porcelain Type)
257Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
258Stay set complete
259Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
260Pipe Earthing Set
261LT Distribution Panel Box with MCCB(100A, 25 kA, 4P)
262Half Clamp (M.S. Flat 50X6 mm)
263Full Clamps (M.S. Flat 50X6 mm)
264Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
265Aluminium Thimble
266Aluminium Thimble
267Danger Plate
268Barbed Wire
269LT Cable (3.5 Core) 95 mm²
270Red oxide paint
271Aluminium Paint.
272LT Switched Capacitors 27- KVAr for 63KVA(rate per KVAr)
273New LT Lines- 3phase -4 wire with rabbit conductor=-50 Sq. mm Total 5 kms
274ACSR 6/1/3.35 (50mm²) inclusive 3% sagging & wastage
275Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (with Ruling Span 67 m)
276Muffs with concerete filling
277Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.02 Mtr]
278Shackle Insulator (16 kN)
279D-Iron (U- Clamps)
280Earth Knob
281LT Stay Set
282Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
283Kit KatI.C.
284Full Clamps [ 2 No for A.I + 1 No for Stay Set]
285Earthing Set complete
286Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
287Spool Tie
288Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
289Red oxide paint.
290Aluminium Paint
291Spiral PVC Spacer
292Feeder Segrigation works
293New 11kv line on 11 mtr. STP pole with DOG Conductor -100 Sq. mm Total 30 Kms
294ACSR 6/1/4.72 (100mm²) {Includes 3 conductor lengths for 3F and Additional 1% (Sag, Jumpering and wastage}
295Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro\" and 3 No. Double Pole Dead End Structures)
296Muffs with concerete filling
297Run Thro\" Structures (? Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km) -
298Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/ctolerance of 100 mm either side) x 8 structure
299Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
300Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
30111 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
30211 KV GI Pin
303Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side)
304Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
305X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
306X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ? Formation
307Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
30811 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
309HT Stay / Guy Arrangement
310Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
311Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
312Earthing
313HT Earthing set complete (REC Constr. Stand. J-1)
314Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
315Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}
316Eye Hook for earth wire
317Earth Wire Clamp
318MS Channel Iron: 75x40x6, Length : 2400 mm for Road crossing
319Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro\" structure: 2 No ]
320Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro\" structure: 2 No]
321Danger Plate (250X200X1.6 mm)
322Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
323Barbed Wire
324Red Oxide
325Aluminium Paint
326New Distribution transformers Total 20 Nos
327Distribution Transformer (Ordinary), 11/0.4 kV,63 KVA
328Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
329Muffs with concerete filling
330X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
331MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s
332X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
333Transformer Bed, Belting & Knee Bracing
334X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
335X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer]
336MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
337MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
338MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
339Transformer LT Distribution Box and GO Switch fixing Assembly
340MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
341MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
342GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
343GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
344D.O Fuse Unit
345Surge Arrester, 9 kV Station Class(Porcelain Type)
346Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
347Stay set complete
348Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
349Pipe Earthing Set
350LT Distribution Panel Box with MCCB(100A, 25 kA, 4P)
351Half Clamp (M.S. Flat 50X6 mm)
352Full Clamps (M.S. Flat 50X6 mm)
353Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)]
354Aluminium Thimble
355Aluminium Thimble
356Danger Plate
357Barbed Wire
358LT Cable (3.5 Core) 95 mm²
359Red oxide paint
360Aluminium Paint.
361LT Switched Capacitors27- KVAr for 63 KVA(rate per KVAr)
362Cabling of LT line with AB Cable 3X95 Sq. mm.Total 10 Kms
363LT AB Cable/XLPE Cable on poles [Size: (70 mm²) x 1 Cables {inclusive 3% sagging & wastage)
364Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
365Muffs with concerete filling
366Stay Set Complete
367Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
368Full Clamp for stay
369Anchoring Assembly for LT
370Suspension Assembly for LT
371Facade Hooks for LT
372Distribution Boxes
373Piercing Connector as per TS
374Cable for SMDB 3.5Core X 35sqmm
375T-Jointing kit
376LTEarthing set complete (preferbly coil earthing)
377Red Oxide
378Aluminium paint

AI Tender Summary

OUR REF NO 33986111
AUTHORITY Government Departments
TENDER VALUE 77.34 Crore
LAST DATE 23-09-2022
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description E-Tendering On Turn Key Basis For Development Of Distribution Infrastructure For Loss Reduction In District Sirmaur, Himachal Pradesh Under Rdss ( Revamped Reforms Based And Results Linked, Distribution Sector Scheme )
Basic Detail
Tender No OCN/DB-RDSS/NIT-No-27/2022-23
Bidding Type Tender
Location
City nahan
State Himachal Pradesh
Key Dates
Publish Date 17 Sep 2022
Submission Date 23 Sep 2022
Open Date 24 Sep 2022
Finance
Tender Value 77.34 Crore
Tender Fee 2950
EMD 1.54 Crore
Exemption Not Available
Document List
Tendernotice_1.pdf
BOQ_98020.xls
corrigendumandquriesreply.rar
RDSSSBDPART1AND3SIRMOUR.rar
SBDRDSSPart2AandBSIRMOUR.rar
d4dd113f-3776-44b9-833f-b63b2336d1c8.html
8InfraSBETenderDrawingsVe.rar

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 17, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 23, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 24, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf

xls

BOQ_98020.xls

rar

corrigendumandquriesreply.rar

rar

RDSSSBDPART1AND3SIRMOUR.rar

rar

SBDRDSSPart2AandBSIRMOUR.rar

html

d4dd113f-3776-44b9-833f-b63b2336d1c8.html

rar

8InfraSBETenderDrawingsVe.rar

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail