Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Thamarai Kuttai At Adc H / O Sayanapuram ( Ui-5124141P179a7 ) In Agamt - Ii 2021-22 Nemili Block, Ranipet District
Tender Value
10.94 Lakhs
Estimated cost
Bid Submission
22 Sep 2022
0 days left
EMD
11500
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
nemili → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Desilting And Construction Of Baby Pond With Retaining Wall , Bathing Ghat, At Thamarai Kuttai At Adc H / O Sayanapuram ( Ui-5124141P179a7 ) In Agamt - Ii 2021-22 Nemili Block, Ranipet District
BOQ
| Sl. No. | Item Description |
| 1 | Nemili Block |
| 2 | 1.Desilting and construction Of baby pond with Retaining Wall , Bathing Ghat, at Thamarai kuttai at ADC H/O Sayanapuram (UI-5124141P179A7) |
| 3 | Clearingthescrubjungle,JullifloraJungleanddisposingofthesameasdirectedbytheEngineer incharge of works and as per technical specification [ specification 2.2] |
| 4 | Earth work in all soils except hard rock requiring blasting and conveying and formation of bund with 0 to 100m deploying earth moving machineries and tippers including benching, formation of bunds breaking clods, sectioning, labour and Hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete |
| 5 | Total Earthwork Quantity |
| 6 | ChannelEarthwork Quantity |
| 7 | Supplying and fixing of RCC Boundrary Stone of Size 0.15 x0.15x1.60m |
| 8 | Construction of Retaining wall for Baby Pond |
| 9 | Earthworkexcavationanddepositingonbank with initial lead and lift in hard gravelly soil, hard stiffclay, blackcottonsoil,hardredearth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 10 | Cement Concrete 1:4:8 mix using 40mm metal includingcostandconveyanceofallmaterialsto work site and all labour charges etc. |
| 11 | Supplyinganderectingcenteringshutteringwith necessarysupportsincluding cost and conveyance and all labour charges etc. |
| 12 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 13 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 14 | Construction of Bathing Ghat, Steps, Outer Platform |
| 15 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 16 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 17 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. |
| 18 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 19 | CC 1:3:6 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 20 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 21 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 22 | Construction of Steps over Bund |
| 23 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 24 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 25 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. |
| 26 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 27 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 28 | Plastering with CM 1:4 20 mm Thickness including cost and conveyance and all labour charges etc., |
| 29 | Construction of Inlet Channel Structure-I |
| 30 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay,black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized bouldersas per SS 20B for narrow foundation. |
| 31 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc. |
| 32 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. Below GL |
| 33 | Supplying and erecting centering shuttering with necessary supports including cost andconveyance and all labour charges etc. Above GL |
| 34 | CC 1:3:6 mix using 40mm metal including cost and conveyance and all labour charges etc. |
| 35 | CC 1:2:4 mix using 20mm metal including cost and conveyance and all labour charges etc. |
| 36 | GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Sep 17, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedSep 22, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 22, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender