| 1 | RGNDWM to Thottumugham- Design, manufacture, Supply, installation, trial running and commissioning of 0.50 mld Dual media pressure filter with IRON Removable Plant & Chlorination unit |
| 2 | Design, fabrication, supply, installation and commissioning of Dual Media Pressure Filter vertical, cylindrical with top and side pressure vessel of dia 2500 mm, HOS 2300 mm, shell thickness 10 mm, dish thickness 10 mm, frontal piping 6 inches(MS) 6 inches for Pneumatic Activated Butterfly Valves and SS Liquid filled Pressure gauge. Filter media is of graded quartz sand(8-16 & 16-30 mesh) Anthracite with 2 years warranty period.( with average pumping hours 6 to 7 hours / day) including Providing Pneumatic controlled butterflyvalves with activator, Air Compressor and PLC Panel for Dual media Pressure filter unit for operating system. |
| 3 | Design, fabrication, supply, installation and commissioning of Iron Removal Plant of capacity 80m3/Hr(Maximum), specific flow rate 1500 lit/sq.m/hr, automatic operation, PLC Controlled Electrical panel with touch screen HMI, and 2 nos of Air compressor with 2 years warranty period. |
| 4 | Supplying,installation ,trial run and commissioning Vaccum feed Gas Chlorinator (2kg/hr) with 2 Nos of 100 Kg capacity chlorine cylinders of wall mounted type, capacity 2 Kg/cm2 and 2 nos(100kg capacity each) of filled chlorine cylinders of ISI Standards |
| 5 | Supplying and erecting of filter feed pumps(20 lps @ 40m head) of CI Centrifugal pump including connecting the necessary suction line for a length of 15m(appx) and necessary delivery line for a length of 20m(appx) including testing and commissioning etc complete withcost of necessary all pipes and specialsand supplying necessary control panel, switches, indicator lamps, starter and lightning indicator and as per norms of EI |
| 6 | Supplying,installation ,trial run and commissioningof filter feed pumps(10 lps @ 8m head - 14 hours) of CI Centrifugal pump including connecting the necessary suction line for a length of 15m(appx) and necessary delivery line for a length of 20m(appx) including testing and commissioning etc complete with cost of necessary all pipes and specials and supplying necessary control panel, switches, indicator lamps, starter and lightining indicator and as per norms of EI |
| 7 | Supplying,installation ,trial run and commissioningof Electrical Control Panel with necessary all indicators, starter, lightning arrester and voltage trip indicator and all condition with EI Standardssuitable for operating two pumps sets but one pump at a time including electrical system for chlorine dozing system with standard wiring. |