Ministry Of Road Transport And Highways has published Cs For Preparation Of Dpr, Carrying Out Fs, Detailed Survey/ Investigation, Alignment Option, Preparation Of Gad, Engineering Report For Construction Of Proposed Fob And Its Approaches Along With Service Road And Preparation Of La-Utility On Bathinda . Submission Date for this Tender is 28-10-2022. Detail Project Report Tenders in punjab Punjab. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 11-Oct-2022 | Corrigendum_I | Other | 28-10-2022 |
Sl. No. | Item Description |
1 | Profesional Staff |
2 | Team Leader cum Senior Bridge Engineer |
3 | Highway cum Pavement Engineer |
4 | Bridge/Structural Engineer |
5 | Meterial cum Geotechnical Engineer - Geologist |
6 | Senior Survey Engineer |
7 | Environmental Specilist |
8 | Quantity Surveyor / Documentation Expert |
9 | Land Acquistion Expert |
10 | Utility Expert |
11 | Sub-Total-1 |
12 | SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) |
13 | Sub-Professional-1 |
14 | Sub-Professional-2 |
15 | Sub-Professional-3 |
16 | Sub-Professional-4 |
17 | Sub-Professional-5 |
18 | Sub-Professional-6 |
19 | Sub-Professional-7 |
20 | Sub-Total-2 |
21 | Total(Sub Total 1 + Sub Total 2) |
22 | II. SUPPORT STAFF |
23 | Office Manager |
24 | Typist |
25 | Office Boy |
26 | Night Watch ment |
27 | Total: |
28 | III. Transportation (Fixed Costs) |
29 | The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants |
30 | Total: |
31 | IV. Duty Travel to Site(Fixed Costs): |
32 | Duty Travel to Site (LS) |
33 | Total: |
34 | V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month) |
35 | Office Rent (Fixed Costs) |
36 | Total: |
37 | VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) |
38 | Office Supplies |
39 | Drafting Supplies |
40 | Computer Running Costs |
41 | Domestic and International Communication |
42 | Total: |
43 | VII. OFFICE FURNITURE AND EQUIPMENT (Rental) |
44 | Office Furniture and Ecquipment (LS) |
45 | Total: |
46 | VIII. REPORTS & DOCUMENTS PRINTING |
47 | Monthly report (3 copies per Month) |
48 | Inception Report & QAP |
49 | Environment and Social Impact Screening Report |
50 | Draft Feasibility Report |
51 | Final Feasibility Report |
52 | Strip Plan with LA Reports |
53 | Draft LA and Clearances I Report |
54 | Final LA and Clearances I Report |
55 | Draft Environmental Assessment Report & RAP |
56 | Final Environmental Assessment Report and RAP |
57 | Draft Detailed Design Report & Drawings etc. |
58 | Draft EMP |
59 | Draft Bidding Documents |
60 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. |
61 | Final EMP. |
62 | Final Bidding Documents |
63 | Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each) |
64 | LA & Clearances II Report |
65 | Total: |
66 | IX. Survey and Investigation: A. Topographical Survey (Fixed Rate) |
67 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. |
68 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology |
69 | B. Investigation (Fixed Cost) |
70 | Road and Bridge Inventory |
71 | Axle Load Survey |
72 | Material Survey and Investigation |
73 | Sub-grade Investigation |
74 | Traffice Survey |
75 | Socio-economic & Census Survey/Studies |
76 | Land Acquisition Studies |
77 | Any other Investigations/Surveys |
78 | Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities. |
79 | a) Boring in all type of soils (other than hard rock) |
80 | b) Boring in hard rock |
81 | Total: |
82 | C. Network Survey and GPR |
83 | Network Survey of the existing Highways as a repository for civil works as per directions from Authority. |
84 | GPR Survey for detection of under ground utilities |
85 | Total: |
86 | X. Cost of Supply and Fixing Boundary pillars |
87 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
88 | Total: |
89 | XI. Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff : |
90 | Ex-Land Revenue Inspector/ Officer or equivalent |
91 | Ex-Kanoogo/Girdwar or equivalent |
92 | Ex-Patwari or Equivalent |
93 | Typist |
94 | Peon |
95 | Number of Land acquisition Teams (One Only) |
96 | Grand Total for All Land acquisition Teams(A) |
97 | B. Logistics for Land Acquisition Team |
98 | Computer including necessary peripherals |
99 | Printers |
100 | Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km |
101 | Number of Land acquisition Teams (One Only) |
102 | Grand Total (B) |
103 | Grand Total for All Land acquisition Teams and Logistics (A) + (B) |
104 | Note: The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for easch 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team). |
105 | Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances. |
106 | Staff |
107 | Sub-Professional-1 |
108 | Sub-Professional-2 |
109 | Sub-Professional-3 |
110 | Sub-Professional-4 |
111 | Sub-Professional-5 |
112 | Sub-Professional-6 |
113 | Sub-Professional-7 |
114 | Sub-Total-I |
115 | II. Mobiliation and Demobilization |
116 | A. International Airfares (Fixed costs) |
117 | B. Inland Travel in Home Country (Fixed costs) |
118 | C. Other Misscexpenses (like DA, internal travel expenses other incidentals) |
119 | Sub-Total-II |
120 | Total (I+II) |
121 | Total cost net of Tax |
122 | Taxes and Duties |
123 | A. Income Tax (Expatriate) |
124 | B. Other Taxes/Duties (if any) Specify clearly |
125 | Total |
126 | Total cost net of Goods and service Tax **Total cost net of Goods and Service Tax shall be considered for financial evaluation. |
127 | Goods and service Tax |
128 | TOTAL COSTS (Including GST) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail