| 1 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 2 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 3 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 15 kms |
| 4 | Excavation of Pole pit9.0Mtr |
| 5 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 6 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeveconcreting |
| 7 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Stay concreting |
| 8 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 9 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 10 | Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
| 11 | Transporting of Distribution Transformer / Line materials from stores to office / site above 10 KM and upto 10 km distance by engaging 1 Ton capacity Minidor (Lorry) |
| 12 | Fixing of HT \"V\" cross arms( 3-1/2\") |
| 13 | Fixing of Tapping Channel cross arms |
| 14 | Fixing of HT / LT Ti fitting |
| 15 | Fixing of 11 KV Pin Insulators with Pin |
| 16 | Fixing of 11KV strain Disc with M/P |
| 17 | Excavation of Stay pit of 4.5 \" to 5 \"depth using JCB / Manual |
| 18 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 19 | Paving and stringing of conductors of 7/3.15 mm AAAC or other equivalent conductor |
| 20 | Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM |
| 21 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 22 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 10 kms |
| 23 | Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor |
| 24 | Loading of conductor in drum |
| 25 | Unloading of conductor in drum |
| 26 | Fixing of LT 3 Phase X arm |
| 27 | Fixing of Aluminimu Knob |
| 28 | Fixing of LT Pin Insulator with Pin |
| 29 | Fixing of LT Shackle with Strap Set |
| 30 | Paving and stringing of conductors of sizes upto 7/2.50 mm AAAC or other equivalent conductor |
| 31 | Excavation of Stay pit of 4.5 \" to 5 \"depth using JCB / Manual |
| 32 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc. |
| 33 | Excavation of Pole pitof size 2\"x2\"x1/6 of the height of the pole upto 8.0 mtr pole by using JCB or Manual |
| 34 | Erection of RCC, REC, PSC poles upto 8.00m length by using JCB / Manual |
| 35 | Earthing of poles with GI wires 4 or 6 SWG by coil earthing |
| 36 | Erection of 11 KV single pole transformer structure complete with out centre support |
| 37 | Loading of DTs & Erection of DT\"s |
| 38 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 39 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 15 kms. |
| 40 | Erection of 11 KV single pole transformer structure complete with out centre support |
| 41 | Loading of DTs & Erection of DT\"s |
| 42 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 43 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 15 kms. |
| 44 | Erection of 11 KV single pole transformer structure complete withcentre support |
| 45 | Loading of DTs & Erection of DT\"s |
| 46 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 47 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 15 kms. |
| 48 | Erection of 11KV Single pole D.P structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc.,With single earth |
| 49 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
| 50 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) Above 5 KM and upto 15 kms. |