Drinking Water And Sanitation Department has published Supply, Installation, Testing And Commissioning Of Following Pumping Plant With Acessories For Various Pumping Stations At Kwilipalkot Phase-I Reorganization Gov Pumping Water Supply Scheme.- 1 Raw Water:-Electric driven horizontal split case centrifug. Submission Date for this Tender is 10-10-2022. Cutting Crimping and Punching Tools Tenders in Tehri Garhwal Uttarakhand. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-Sep-2022 | Corrigendum3 | Date | 06-10-2022 |
2 | 27-Sep-2022 | Corrigendum2 | Other | 06-10-2022 |
3 | 27-Sep-2022 | Corrigendum | Other | 06-10-2022 |
4 | 06-Oct-2022 | Corrigendum5 | Date | 10-10-2022 |
Sl. No. | Item Description |
1 | Raw Water:- Electric driven horizontal split case centrifugal raw water pump capable of delivering 3750 Lpm dischargeagainst a total head of 100 mtr (2900 rpm as per existing motor of MPS/ IPS-I) complete with coupling, coupling guards & MS fabricated heavy duty base plate for mounting above pump and motor.(2 install + 1 spare) |
2 | shifting 03 no. & Installation of 02 no existing 150 KW motor from MPS to Raw water |
3 | shifting & Installation of 02 no. existing 150 KW Starter from MPS to Raw water |
4 | Repair / modification of existing control MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel . |
5 | Power wiring and earthing material. |
6 | 70 Sq. mm ,PVC insulated 3- core, Cu conductor submersible cable (Multirun) |
7 | Jointing material |
8 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
9 | replacement of existing main piping /common header including repairing of valves |
10 | Guages each Set Consist following items- |
11 | Pressure guageof range 0-20 Kg/cm2. |
12 | Compound guageof range 0- (+/-) 1 kg./cm2 -1 Nos. |
13 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
14 | Tools such as spanner set, pliers, hammers, screw drivers, crimping tools, bearing pullers etc. required for maintenance of pumping plants. |
15 | 3 Ton capacity, 25 m lift chainpulley |
16 | Testing of pumps at works |
17 | Testing of pumping plants at site |
18 | Internal and external electrification of pump house |
19 | Painting of pumping plants |
20 | Intermediate Raw Water:- Electric driven horizontal split case centrifugal raw water pump capable of delivering 3750 Lpm dischargeagainst a total head of 100 mtr (2900 rpm as per existing motor of MPS/ IPS-I) complete with coupling, coupling guards & MS fabricated heavy duty base plate for mounting above pump and motor.(2 install + 1 spare) |
21 | shifting 03 no. & Installation of 02 no existing 150 KW motor from IPS to intermediate Raw water |
22 | shifting & Installation of 02 no. existing 150 KW Starter from MPS & IPS to intermediate Raw water |
23 | Repair / modification of existing control MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel . |
24 | Power wiring and earthing material. |
25 | 70 Sq. mm ,PVC insulated 3- core, Cu conductor submersible cable (Multirun) |
26 | Jointing material |
27 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
28 | replacement of existing main piping /common header including repairing of valves |
29 | Guages each Set Consist following items- |
30 | Pressure guageof range 0-20 Kg/cm2. |
31 | Compound guageof range 0- (+/-) 1 kg./cm2 -1 Nos. |
32 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
33 | Tools such as spanner set, pliers, hammers, screw drivers, crimping tools, bearing pullers etc. required for maintenance of pumping plants. |
34 | Rubber resistance sheet size 1 m x 2 m x 0.025m. |
35 | 3 Ton capacity, HOT crane with travelling arrangement. |
36 | Testing of pumps at works |
37 | Testing of pumping plants at site |
38 | Internal and external electrification of pump house |
39 | Painting of pumping plants |
40 | MPS:- Electric driven horizontal multi stage centrifugal clear water pump capable of delivering 1900 lpm dischargeagainst a total head of 440 mt complete withbase frame, coupling and coupling guards (3 installed+1 spare) |
41 | 250 kw Electric motor squirrel cage,TEFC type, 2980 rpm suitable to operate on 415+/- 10% volts, 3 phases 50 c\sAC supply (3 installed+1 spare) |
42 | upgradation of existing 150 KW starter to 250 KW capcity starter including replacement of Contactors/ relay/ATS/ wiring etc. |
43 | repairing of existing MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel and converting it to single pump outgoing (making 2 outgoing blind) and 03 no output for light/ Automation/ External lighting |
44 | fabrication of cubical type floor mountingpanelfor installation of 1 no ACB 630 A (from existing panel) for controlling power supply to one no starter including all required meters and protectios etc including repairing of ACB as reqiured . |
45 | Power wiring and earthing material. |
46 | 400 mm2 size 3.5 core aluminium conductor armoured XLPE sheathed cable of 1.1 KV grade. (multirun) |
47 | 95 mm2 ,PVC insulated 3 core Flat submersible Copper cable (multirun .) |
48 | Jointing material |
49 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing of 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
50 | replacement of existing main piping /common header including repairing of valves |
51 | Guages (each set consist following items) :- |
52 | Pressure guage with control cock and fittings of range 0 - 100 kg/cm2 - 2 Nos. |
53 | Compound guage with control cock and fittings of range 0 - (+/-) 1 kg/cm2 -1 No. |
54 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
55 | Internal and external electrification of pump house |
56 | Testing of pumps at works |
57 | Testing of pumping plants at site |
58 | Painting of pumping plants |
59 | IPS-I:- Electric driven horizontal multi stage centrifugal clear water pump capable of delivering 1700 lpm dischargeagainst a total head of 460 mt complete withbase frame, coupling and coupling guards (3 installed+1 spare) |
60 | 250 kw Electric motor squirrel cage,TEFC type, 2980 rpm suitable to operate on 415+/- 10% volts, 3 phases 50 c\sAC supply. |
61 | upgradation of existing 150 KW starter to 250 KW capcity starter including replacement of Contactors/ relay/ATS/ wiring etc. |
62 | repairing of existing MS sheet steel fabricated dust and vermin proof cubical type floor mounting control panel and converting it to single pump outgoing (making 2 outgoing blind) and 03 no output for light/ Automation/ External lighting |
63 | fabrication of cubical type floor mountingpanelfor installation of 1 no ACB 630 A (from existing panel) for controlling power supply to one no starter including all required meters and protectios etc including repairing of ACB as reqiured . |
64 | Power wiring and earthing material. |
65 | Complete power wiring to carry out wiring from Transformer to pump house control panel to starters to motors as below |
66 | 400 mm2 size 3.5 core aluminium conductor armoured XLPE sheathed cable of 1.1 KV grade. (multirun) |
67 | 95 mm2 ,PVC insulated 3 core Flat submersible Copper cable (multirun .) |
68 | Jointing material |
69 | Earthing with GI earth plate 600 mm x 600 mm x 6 mm including accessories, and providing masonry enclosure with providing and fixing of 25 mm x 5 mm GI strip on surface or in recess for connections with charcoal, salt as required. |
70 | replacement of existing main piping /common header including repairing of valves |
71 | Guages (each set consist following items) :- |
72 | Pressure guage with control cock and fittings of range 0 - 100 kg/cm2 - 2 Nos. |
73 | Compound guage with control cock and fittings of range 0 - (+/-) 1 kg/cm2 -1 No. |
74 | Heavy duty brass control cock, MS nipple,pipe,elbow etc. |
75 | Internal and external electrification of pump house |
76 | Testing of pumps at works |
77 | Testing of pumping plants at site |
78 | Painting of pumping plant |
79 | Transformers:- S.I.T.C. of transformers at different pumping stations including carting etc. |
80 | FOR MPS-500KVA |
81 | FOR IPS-I -500KVA |
82 | Earthing as per I.E rules for transformer at MPS and IPS-I |
83 | Supply and laying of 150 mm2, AI conductor, 3 core PVC sheathed XLPE HT cable(FOR MPS and IPS-I) |
84 | HT cable jointing kit |
85 | Fencing of transformer (MPS and IPS-I) |
86 | Operation and Maintenance for a period of 06 months |