}

Tender For Bundelkhand Expressway Street Light Connection- 1 ( Part-A ) Carriage Offollowing Line Materials From Store Center Orai To Site With Work Including Measuring Weiging Loading Unloading At Both Ends And Proper Stacking At Safe Site. 2 Carria, orai-Uttar Pradesh

Dakshinanchal Vidyut Vitran Nigam Limited has published Tender For Bundelkhand Expressway Street Light Connection- 1 ( Part-A ) Carriage Offollowing Line Materials From Store Center Orai To Site With Work Including Measuring Weiging Loading Unloading At Both Ends And Proper Stacking At Safe Site. 2 Carria. Submission Date for this Tender is 26-09-2022. Forming Tools Tenders in orai Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

33902084
Tender For Bundelkhand Expressway Street Light Connection- 1 ( Part-A ) Carriage Offollowing Line Materials From Store Center Orai To Site With Work Including Measuring Weiging Loading Unloading At Both Ends And Proper Stacking At Safe Site. 2 Carria
Open Tender
NCB
Uttar Pradesh
Orai
26-09-2022

Tender Details

Tender For Bundelkhand Expressway Street Light Connection- 1 ( Part-A ) Carriage Offollowing Line Materials From Store Center Orai To Site With Work Including Measuring Weiging Loading Unloading At Both Ends And Proper Stacking At Safe Site. 2 Carriage Of St Pole 11 Mtr Long From Orai Store To Site 3 Carriage Of Pcc Pole 8.5 Mtr Long From Orai Store To Site 4 Carriage Of Acsr Weasel Conductor 5 Carriage Of 25 Kva T / F 6 Carriage Of 63 Kva T / F New 7 ( Part-B ) Supply Of The Following Line Item As Per Resspo Drawing & Dimension:- 8 Stone Pad ( 300X300x75mm ) 9 11 Kv V Type Cross Arm With Holding Clamp And Nut And Bolts 10 Stay Set Complete With Stay Clamp And Nut Bolts 11 11Kv Pin Insulator With G-I Pin 12 11Kv Disc Insulator With Fitting 13 M.S. Earthing Complete ( 16Mm Dia, 3Mtr Long ) 14 F - Bracket For 11Kv Line With Nut & Bolt 15 Barbed Wire ( No Of Pole X1.5Kg ) 16 Danger Board With Clamp Of Size ( 250X200x2mm Thick ) 17 Number Plate ( 250X200x2mm Thick ) With Nuts & Bolts 18 11 Kv Tpmo 19 T-Off Channel Of Size ( 125X65x1300mm ) With Clamp 20 M.S. Dropper Channel ( 100X50x2028mm ) With Clamp 21 M.S. Top Channel ( 125X65x2240mm ) With Clamp 22 Transformer Base Angle ( 75X75x6x2028 Mm ) 23 Ms Angle Cross Bracing Of Size ( 65X65x6x3200 Mm Long ) With Clamps, Nut & Bolts. 24 11 Kv Fuse Set. 25 Clamps For Distribution Box With Nuts & Bolts 26 Distribution Box 27 Off Size Nut, Bolts & Washer 28 ( Part-C ) Erection Of The Following Supports After Making Of Pits As Per Resspo Norms & Filling Of Pits By Concrete Of Ratio 1:4:8 ( Cement Brick Balast & Sand ) . Fitting Of All Accessories As Cross Arm, Top Channel, Bracing Angle, Pin Insulator, Disc Insulator, Danger Board, Number Plate, Barbed Wire & Clamps Etc. Plinthing Of Support Above 300Mm Ground Level By Concrete Of Ratio 1:4:8 ( Cement Brick Balast & Sand ) Will Be Done At The Time Of Erection Of Pole. Painting Of St Pole Structure As Per Resspo Norms Also ( All Type Of Nut, Bolts & Grouting Material Etc. Will Be Provided By Contractor ) . 29 Erection Of Single Support Of St Pole 11 Mtr Long With All Fitting 30 Erection Of Double Pole Structure On St Pole 11 Mtr Long Complete With Bracing 31 Erection Of Single Support Of Pcc Pole 8.5 Mtr Long With All Fitting 32 Erection Of Four Pole Structure On Pcc Pole 8.5 Mtr Long Complete With Bracing 33 Erection Of Double Pole Structure On Pcc Pole 8.5 Mtr Long Complete With Bracing 34 Charging Of 11 / 0.4 Kv 25 / 63 Kva T / F With All Fitting 35 Cemical Earthing Of 11 / 0.4 Kv 25 / 63 Kva T / F 36 Erection Of Stay Set With Stay Wire, Stay Clamp & Stay Insulator Including With Grouting Of Stay Set By Concrete Of Ratio 1:4:8 As Per Resspo Norms Before Back Filling Of The Pits Including Binding, Climbing, Clamping, Tightening And Nozzeling Of Stay Wire In All Respect As Per Resspo Norms. All Clamps, Nuts, Bolts, Stay Insulator, Cement. Brick, Ballast, Sand Etc Would Be Provided By The Contractor. 37 Laying And Sagging Of 3 Phase Acsr Rabbit Conductorfrom Double Pole At 33 / 11 Kv Substation To Double Pole At Tapping Point Of 11 Kv Feeder Line Including Jumpering, Hoisting Fixing All Type Of Insulators, Binding Jointing And Its Clamping Etcin All Respect. 38 Earthing Of Each St / Pcc Poles Of The Line Is To Be Done By Inserting The Ms Earth Rod ( 1800X20mm ) Into Soil By Hammering And Properly Fastning With Gi Wire To Each Support & Its Accessories By Nut & Bolt. Earthing Rod Must Be 0.15 Mtr. Above From The Plinth Of The Support. All Type Nut & Bolt, Earthing And Gi Wire Will Be Suppliedby The Contractor. 39 Grouting Of St Pole 11Mtr Long As Per Resspo Norms And Filling Pits By Concrete Of Ratio 1:4:8 ( Cement, Brick Blast And Sand ) 40 Grouting Of Pcc Pole 8.5Mtr Long As Per Resspo Norms And Filling Pits By Concrete Of Ratio 1:4:8 ( Cement, Brick Blast And Sand ) 41 Clearing Of The Line Route By Cutting Of Tree Branches During Erection Of Line And Also Upto The Time Of Energisation Completely As Per Direction Of Site Incharge.

Key Value

Document Fees
INR 3540 /-
EMD
INR 13250.0 /-
Tender Value
INR 13.25 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail