1.Providing Paver Block Work From Alagappagoundenpudur Kanagaraj House To Mani House H / O Pogalur Panchayat 2. Providing C.C.Road With Drain And Soakpit From Araan House To Kavitha House H / O Pogalur Panchayat 3.Construction Of Drain From Muthulaksh 1.Providing Paver Block Work From Alagappagoundenpudur Kanagaraj House To Mani House H / O Pogalur Panchayat 2. Providing C.C.Road With Drain And Soakpit From Araan House To Kavitha House H / O Pogalur Panchayat 3.Construction Of Drain From Muthulaksh , Name Of Work: 1.Providing Paver Block Work From Alagappagoundenpudur Kanagaraj House To Mani House H / O Pogalur Panchayat , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10M And Lift Of 2M In Hard Gravelly Soil As Per Ss 20 B For Foundation ( 0M-0.30M ) , Supplying Erecting Centering And Shuttering For Sides And Including All And Fixing Labour Charges Etc., , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Construction Of Granular Sub Base By Providing Well Graded Material ( 25 Mm To 4.75 Mm Irc Hbg Metal @ 65 %, 4.75 To 2.36Mm Irc Hbg Metal@20%&2.36 Mm Below Irc Hbg Metal @15% ) & ( The Material Passing 425 Microns Sieve Shall Have Liquid Limit And Plasticity Index Not More Than 25 & 6% Repectively ) Spreading In Uniform Layers With Motor Grader On Prepared Surface Mixing By Mix In Place Method With Rotovator At Omc And Compacting With Three Wheel 80-100 Kn Capacity And Finished In Accordance With The Requirements Of The Specification And Thickness As Per Approved Plans Or As Directed By The Engineer ( Mix -In - Place Method ) . , Providing And Laying Of Interlocking Concrete Block Pavements Having Thickness 80Mm And Compacted Over A Thin Bedding Sand Layer Of 25Mm Thickness And Joints Shall Be Filled By Fine Sand Of Specified Grading As Per Table 1500.6 Of Specification Of Rural Roads-2014 Andtechnical Specification Clause 1504. , Name Of Work:2. Providingc.C.Road With Drain And Soakpit Fromaraan House To Kavitha Househ / O Pogalur Panchayat , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10M And Lift Of 2M In Hard Gravelly Soil As Per Ss 20 B For Foundation ( 0M-0.30M ) , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Supplying Erecting Centering And Shuttering For Sides And Including All And Fixing Labour Charges Etc., , Cement Concrete 1:2:4 Mix Using 20Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Plastering With Cement Mortar 1:5Mixto 20 Mm Thick Includingcost And Conveyance Of All Materials To Site And All Labour , Earth Work Excavation & Depositing On Bank With In Initial Lead And Lift Etc. , Cement Concrete 1:3:6 Mix Using 20Mm Size Hbgs Metalincludingcuring Etc.Complete , Supplying Erecting And Centering For Sides And Soffits Including All Charges Etc. , Filling With 225Mm Hbg Bouldersl Including All Conveyance Of All Materials To Site And All Labour Charges Etc Complete , Filling With 40Mm Hbg Metal Including All Conveyance Of All Materials To Site And All Labour Charges Etc Complete , Filling With 20Mm Hbg Metal Including All Conveyance Of All Materials To Site And All Labour Charges Etc Complete , Supplying And Fixing 900Mm Diarcc Rings With Necessary Shoes, Bends, & Clamps Etc., , Supplying And Fixing 900Mm Diarcc Cover Slab With Necessary Shoes, Bends, & Clamps Etc., , Name Of Work: 3.Construction Of Drain From Muthulakshmi House To Maheswari House@ Alagappakavundanputhur H / O Pogalur Panchayat , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10M And Lift Of 2M In Hard Gravelly Soil As Per Ss 20 B For Foundation ( 0M-0.30M ) , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Supplying Erecting Centering And Shuttering For Sides And Including All And Fixing Labour Charges Etc., , Plastering With Cement Mortar 1:5Mixto 20 Mm Thick Includingcost And Conveyance Of All Materials To Site And All Labour , Name Of Work: 4.Construction Of Drain From Old Ad Colony Krishnan Pusari House To Kattan So Nanchimuthu House @ Mudukanthurai H / O Pogalur Panchayat , Earth Work Excavation And Depositing On Bank With In Initial Lead Of 10M And Lift Of 2M In Hard Gravelly Soil As Per Ss 20 B For Foundation ( 0M-0.30M ) , Cement Concrete 1:4:8 Mix Using 40Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Cement Concrete 1:3:6 Mix Using 20Mm Iss Metal Including Cost Andconveyance Of All Materials To Site And All Labour Charges For Mixing, Laying And Curing Etc Completefor 10 Cum. , Supplying Erecting Centering And Shuttering For Sides And Including All And Fixing Labour Charges Etc., , Plastering With Cement Mortar 1:5Mixto 20 Mm Thick Includingcost And Conveyance Of All Materials To Site And All Labour , Gst Amount For Providing Service To Government Contract Works For The Above Construction Works. { Gst Amount Is The Total Gst Amount For Total Overall Quoted Amount Above This Row In Column Bb For All Works In This Package }