Power Government Departments Closing in 0 days TDR #33873010

Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edd-I, Aligarh.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To The Respective Site Of W

Issued by Government Departments · aligarh, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
14 Sep 2022
0 days left
EMD
5000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
aligarh → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edd-I, Aligarh.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Roadincluding The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc / St Poles 8.5 / 11 Mtr. 3 Cartage Of Line Material Viz Cable, Conductor / Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps, Cable, Stone Pad & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective End, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 4 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 5 Pcc / St Poles 8.5 / 11 Mtr. 6 Erection Of Double Pole On Following Poles Including The Work Of Complete Line As Per Respo Norm Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 7 Pcc / St Poles 8.5 / 11 Mtr. 8 Installation & Fixing Of 11 Kv Tpmo. 9 ( A ) Erection & Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 10 ( B ) Providing And Fixing Of Stay Insulator. 11 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 12 Acsr Weasal Conductor. 13 Acsr Dog Conductor. 14 Abc Conductor 3X50+1X35+1X16 Sq.Mm. / 3X95+1X70+1X16 Sq.Mm. / 3X120+1X95+1X16 Sq.Mm. 15 Grouting Of Pcc / St Poles 8.5 / 11 Mtr. Long As Per Respo Norms 16 Making The Plinth Of Steel Poles. 17 Drilling And Cutting Of Tee Off Channel, V Cross Arms, Top Channel, Cross Bracing Angle, Ms Garding Angle, Dropper Chanel, Stone Pad. As Per Specification Of Uppcl Construction Manual Including Including Loading And Unloading At The Both Ends. 18 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Chopping Of Tree Branches Which Are Touching To Ht / Lt Lines. 20 Complete Chemical Earthing Of 11 / 0.4 Kv, Distribution Transformer By Digging Pits 6” Dia Upto 3 Mtr. Deep Including Chemical Filled Pipe In Between ( Pipe-In-Pipe ) Isi Mark B Grade & Connecting With G.I Strip Of Size 50Mm X 6Mm With Neutral / Body Of 11 / 0.4 Kv Distribution Transformer To Above Pipe-In-Pipe ( Pip ) And Filling Of Chemical Crystalline Conductive Mixture Containing Highly Conductive Material Around The ( Pipe-In-Pipe ) Up To 3 Mtr. Including Making Of Chamber At The Top Of The Earthing. Other Details Are As Below:-1. Earth Pipe Material – Mild Steel, Galvanized.2-Main Electrode Diameter – 42.4Mm.3-Auxiliary Electrode Pipe, Diameter – 76Mm. 4-Wall Thickness Of Main Electrode: - 2.6Mm.5-Wall Thickness Of Auxiliary Hole: - 3.2Mm.6- Length Of Earthing Electrode ( Pip ) :- 3 Meter. 21 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 22 Providing & Fixing Ofclamps Of Lt, Cross Arm Holding, F-Clamp, Stay Clamp, Danger Board Clamp With Nut & Bolts. 23 Providing Of Fixing Of Lt Shackle Insulator. 24 Providing / Fixing Of Missing Nut Bolts And Washer 25 Carriage & Mounting From Site To Store / Store To Site Following Capacity Transformer Including The Work Of Its Loading & Unloading, Dragging Etc. And Also Including The Cost Of Labour And T&P Etc. Required For Proper Completion Of Work. 26 10 / 16 Kva T / F 27 25 Kva T / F 28 63 Kva T / F 29 100 Kva T / F 30 Safe Carriageof Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 31 Providing & Fixing Of 3X70 / 3X120 / 3X185 Sq.Mm. 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 32 Providing & Fixing Of 3X300 Sq.Mm. 33 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 33 Safe Carriageof 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kvxlpe Cable From Store Center To Respective Site Of Work Including Loading & Unloading At Both Ends For Proper Completion Of Work. 34 Laying Of 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 35 Guarding Of 11 Kv Lineby Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Etc. Required For Proper Completion Of Work. 36 Carriage & Installation Of 33Kv / 11 Kv Ct-Pt Pole Mountedmetering Unit On Double Pole After Fixing Of Channel With M.S. Clamps And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1 / 8X1 Finally Connected To Earthing Rod Of Size 20Mm X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae ( M ) . The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. 37 Safe Carriage & Installation Of 33Kv / 11 Kvpilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work. 38 Providing & Fixing Wearing Gi Pipe 6” Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply. 39 Road Restoration Charges For Pucca Road Crossing. 40 Road Cutting For Laying 33Kv / 11 Kv Under Ground ( Size 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm ) Inside Pipe Afterdigging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 41 Installation Of Extra “T”Onthe Old Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. The “T”Pole Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement.

BOQ

Name of Work:Electricity Line Construction & Other related Works for Issued of new electricity connections under deposit scheme in the jurisdiction of EDD-I, Aligarh.
Sl. No. Item Description
1Cartage of followingpoles from Store centre or from any other place to the respective site of work through the Kachha Pacca roadincluding the work of its loading & unloading at the respective ends, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
2PCC/ST poles 8.5/11 Mtr.
3Cartage of line material viz Cable,Conductor/ GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps, cable, Stone pad & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective end, also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.).
4Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
5PCC/ST poles 8.5/11 Mtr.
6Erection of double pole on following poles including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work.
7PCC/ST poles 8.5/11 Mtr.
8Installation & fixing of 11 KV TPMO.
9(a) Erection & Grouting of stay set including the work of nozzling etc. as per RESPO manual and also including the cost of arrangement of all grouting material, labour, T&P etc. required for proper completion of work.
10(b)Providing and fixing of stay insulator.
11Laying, sagging, stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work.
12ACSR Weasal Conductor.
13ACSR Dog Conductor.
14ABC Conductor 3x50+1x35+1x16 Sq.mm./3x95+1x70+1x16 Sq.mm./ 3x120+1x95+1x16 Sq.mm.
15Grouting of PCC/ST poles 8.5/11 Mtr. Long as per RESPO norms
16Making the plinth of Steel poles.
17Drilling and cutting of tee off channel, V cross arms, Top channel, cross bracing angle, MS garding angle, Dropper chanel, Stone pad. as per specification of UPPCL construction manual including including loading and unloading at the both ends.
18Fixing of earthing rod as per RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. Required for proper completion of work.
19Chopping of tree branches which are touching to HT/LT lines.
20Complete chemical earthing of 11/0.4 KV,Distribution Transformer by digging pits 6” dia upto 3 mtr. deep including chemical filled pipe in between (pipe-in-pipe) ISI mark B Grade & connecting with G.I strip of size 50mm X 6mm with neutral/body of 11/0.4 KV distribution transformer to above pipe-in-pipe (PIP) and filling of chemical crystalline conductive mixture containing highly conductive material around the (pipe-in-pipe) up to 3 Mtr. including making of chamber at the top of the earthing. Other details are as below:-1. Earth pipe material – mild steel, Galvanized.2-Main Electrode diameter – 42.4mm.3-Auxiliary Electrode pipe, Diameter – 76mm. 4-Wall Thickness of main Electrode: - 2.6mm.5-Wall thickness of auxiliary hole: - 3.2mm.6- Length of earthing electrode (PIP):- 3 Meter.
21Erection of section Tee pole including fixing of all fittings as per RESPO norms.
22Providing & Fixing ofClamps of LT,Cross Arm Holding, F-Clamp, Stay Clamp, Danger board clamp with Nut & Bolts.
23Providing of Fixing of LT shackle insulator.
24Providing/Fixing of missing Nut bolts and washer
25Carriage & Mounting from site to Store/store to site following capacity transformer including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work.
2610/16 KVA T/F
2725 KVA T/F
2863 KVA T/F
29100 KVA T/F
30Safe carriageof LT distribution box (three phase) from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESPO norms.
31Providing & fixing of 3x70/3x120/3X185 Sq.mm. 11 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
32Providing & Fixing of 3x300 Sq.mm. 33 KV XLPE heat shrinkable cable jointing kits indoor & outdoor type including the cost of labour T&P carrier etc for proper completion of work.
33Safe carriageof 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KVXLPE Cable from Store Center to respective site of work including loading & unloading at both ends for proper completion of work.
34Laying of 3x70/3x120/3X185/3x300 Sq.mm.33 KV/11 KV under ground cable by straight through after digging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
35Guarding of 11 KV Lineby laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work.
36Carriage & Installation of 33KV/11 KV CT-PT Pole Mountedmetering unit on double pole after fixing of channel with M.S. Clamps and nuts bolts for holding the channel angle etc. The unit body shall be earthed by connecting M.S. strip of size 1/8x1 finally connected to earthing rod of size 20mm x2540 mm. 11 KV line shall be connected to unit as per instructions of SDO/AE(M). The M.S. Strip & earth rod shall be included in the scope of work.
37Safe carriage & Installation of 33KV/11 KVpilfer proof metering cubicle from store centre, Sarsol to site of work.
38Providing & Fixing Wearing GI pipe 6” dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply.
39Road Restoration charges for pucca road crossing.
40Road Cutting for laying 33KV/11 KV under ground (Size 3x70/3x120 /3X185/3x300 Sq.mm) inside pipe afterdigging trench of 600 mm. wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable. The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling. Spare cable shall be left and buried in the trench in the shape of rings at both ends. All material (except cable), labour, T&P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost.
41Installation of extra “T”onthe old erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. The “T”pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement.

AI Tender Summary

OUR REF NO 33873010
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 14-09-2022
Authority
Authority Name Dakshinanchal Vidyut Vitran Nigam Limited
Work Description Electricity Line Construction & Other Related Works For Issued Of New Electricity Connections Under Deposit Scheme In The Jurisdiction Of Edd-I, Aligarh.- 1 Cartage Of Followingpoles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Roadincluding The Work Of Its Loading & Unloading At The Respective Ends, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 2 Pcc / St Poles 8.5 / 11 Mtr. 3 Cartage Of Line Material Viz Cable, Conductor / Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Clamps, Cable, Stone Pad & Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective End, Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. ( Dist. 0 To 50 Kms. ) . 4 Erection Of Single Support Including Complete H.T / L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 5 Pcc / St Poles 8.5 / 11 Mtr. 6 Erection Of Double Pole On Following Poles Including The Work Of Complete Line As Per Respo Norm Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T & P And Carrier Etc. Required For Proper Completion Of Work. 7 Pcc / St Poles 8.5 / 11 Mtr. 8 Installation & Fixing Of 11 Kv Tpmo. 9 ( A ) Erection & Grouting Of Stay Set Including The Work Of Nozzling Etc. As Per Respo Manual And Also Including The Cost Of Arrangement Of All Grouting Material, Labour, T&P Etc. Required For Proper Completion Of Work. 10 ( B ) Providing And Fixing Of Stay Insulator. 11 Laying, Sagging, Stringing, Binding And Jumpering Etc. Of Old Line Conductor On The Newly Erected Pole As Per Respo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. 12 Acsr Weasal Conductor. 13 Acsr Dog Conductor. 14 Abc Conductor 3X50+1X35+1X16 Sq.Mm. / 3X95+1X70+1X16 Sq.Mm. / 3X120+1X95+1X16 Sq.Mm. 15 Grouting Of Pcc / St Poles 8.5 / 11 Mtr. Long As Per Respo Norms 16 Making The Plinth Of Steel Poles. 17 Drilling And Cutting Of Tee Off Channel, V Cross Arms, Top Channel, Cross Bracing Angle, Ms Garding Angle, Dropper Chanel, Stone Pad. As Per Specification Of Uppcl Construction Manual Including Including Loading And Unloading At The Both Ends. 18 Fixing Of Earthing Rod As Per Respo Manual And As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. 19 Chopping Of Tree Branches Which Are Touching To Ht / Lt Lines. 20 Complete Chemical Earthing Of 11 / 0.4 Kv, Distribution Transformer By Digging Pits 6” Dia Upto 3 Mtr. Deep Including Chemical Filled Pipe In Between ( Pipe-In-Pipe ) Isi Mark B Grade & Connecting With G.I Strip Of Size 50Mm X 6Mm With Neutral / Body Of 11 / 0.4 Kv Distribution Transformer To Above Pipe-In-Pipe ( Pip ) And Filling Of Chemical Crystalline Conductive Mixture Containing Highly Conductive Material Around The ( Pipe-In-Pipe ) Up To 3 Mtr. Including Making Of Chamber At The Top Of The Earthing. Other Details Are As Below:-1. Earth Pipe Material – Mild Steel, Galvanized.2-Main Electrode Diameter – 42.4Mm.3-Auxiliary Electrode Pipe, Diameter – 76Mm. 4-Wall Thickness Of Main Electrode: - 2.6Mm.5-Wall Thickness Of Auxiliary Hole: - 3.2Mm.6- Length Of Earthing Electrode ( Pip ) :- 3 Meter. 21 Erection Of Section Tee Pole Including Fixing Of All Fittings As Per Respo Norms. 22 Providing & Fixing Ofclamps Of Lt, Cross Arm Holding, F-Clamp, Stay Clamp, Danger Board Clamp With Nut & Bolts. 23 Providing Of Fixing Of Lt Shackle Insulator. 24 Providing / Fixing Of Missing Nut Bolts And Washer 25 Carriage & Mounting From Site To Store / Store To Site Following Capacity Transformer Including The Work Of Its Loading & Unloading, Dragging Etc. And Also Including The Cost Of Labour And T&P Etc. Required For Proper Completion Of Work. 26 10 / 16 Kva T / F 27 25 Kva T / F 28 63 Kva T / F 29 100 Kva T / F 30 Safe Carriageof Lt Distribution Box ( Three Phase ) From Store Centre Sarsol To Pit Site Including Loading And Unloading At Both Ends Mounting And Fixing On Pole Also By Making Connections As Per Respo Norms. 31 Providing & Fixing Of 3X70 / 3X120 / 3X185 Sq.Mm. 11 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 32 Providing & Fixing Of 3X300 Sq.Mm. 33 Kv Xlpe Heat Shrinkable Cable Jointing Kits Indoor & Outdoor Type Including The Cost Of Labour T&P Carrier Etc For Proper Completion Of Work. 33 Safe Carriageof 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kvxlpe Cable From Store Center To Respective Site Of Work Including Loading & Unloading At Both Ends For Proper Completion Of Work. 34 Laying Of 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm.33 Kv / 11 Kv Under Ground Cable By Straight Through After Digging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 35 Guarding Of 11 Kv Lineby Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings ( Tilli ) At A Distance At 2-3 Mtr. As Per Respo Manual And Also Including The Cost Of Arragement Of Labour, T & P Etc. Required For Proper Completion Of Work. 36 Carriage & Installation Of 33Kv / 11 Kv Ct-Pt Pole Mountedmetering Unit On Double Pole After Fixing Of Channel With M.S. Clamps And Nuts Bolts For Holding The Channel Angle Etc. The Unit Body Shall Be Earthed By Connecting M.S. Strip Of Size 1 / 8X1 Finally Connected To Earthing Rod Of Size 20Mm X2540 Mm. 11 Kv Line Shall Be Connected To Unit As Per Instructions Of Sdo / Ae ( M ) . The M.S. Strip & Earth Rod Shall Be Included In The Scope Of Work. 37 Safe Carriage & Installation Of 33Kv / 11 Kvpilfer Proof Metering Cubicle From Store Centre, Sarsol To Site Of Work. 38 Providing & Fixing Wearing Gi Pipe 6” Dia On The Feeder Cable Before Mounting The Cable On The Double Pole Lifting, Mounting And Clamping Of 11 Kv Feeder Cable With Boxes On The Feeder Double Pole Structure And Making Connections Including Supply. 39 Road Restoration Charges For Pucca Road Crossing. 40 Road Cutting For Laying 33Kv / 11 Kv Under Ground ( Size 3X70 / 3X120 / 3X185 / 3X300 Sq.Mm ) Inside Pipe Afterdigging Trench Of 600 Mm. Wide, 1500 Mm Deep, Providing The Fine Sand Cushion Beneath And Above The Cable. The Cable Shall Be Duly Protected By Ist Class Bricks, Two On Either Side And Third On Top Of The Cable, Laid In Series One After The Other. The Work Includes Supplying Of Fine Sand And Bricks, Filling And Ramming Of The Left Out Soil, Closing The Trench And Levelling. Spare Cable Shall Be Left And Buried In The Trench In The Shape Of Rings At Both Ends. All Material ( Except Cable ) , Labour, T&P Carrier Etc, Required For Proper Completion Of Work Will Be Arranged By The Contractor At His Own Cost. 41 Installation Of Extra “T”Onthe Old Erected Poles Wherever Required Alongwith All Fitting As Per Direction Of Supervising Engineer Including The Cost Of Labour, T&P Etc. Required For Proper Completion Of Work. The “T”Pole Shall Be Grouted With Cement, Sand And Brick Ballast / Stone Ballast In Ratio 1:4:8 Including The Cost Of Arrangement Of Cement, Sand, Brick Ballast / Stone Ballast, Stone Pad Etc. As Per Actual Site Requirement.
Basic Detail
Tender No EDCA-37/2022-23
Bidding Type Tender
Location
City aligarh
State Uttar Pradesh
Key Dates
Publish Date 09 Sep 2022
Submission Date 14 Sep 2022
Open Date 14 Sep 2022
Finance
Tender Value Ref. Documents
Tender Fee 1180
EMD 5000
Exemption Not Available
Document List
Tendernotice_1.pdf
a29ee17b-2d47-4bf7-8a87-f6db7d1c83fd.html
BOQ_1173459.xls
Doc37.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 09, 2022
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 14, 2022
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 14, 2022

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

Tendernotice_1.pdf