Routine Maintenance And Repair Routine Mandr Works At 220 / 132 Kv Substation Ramnagar Roorkee- 1 Operation Of Tubwell ( For 8 Hrs. ) Daily By A Suitable Experienced Operator Continuously Or In Different Intervals As Per Programme Fixed By The E /
Tender Overview
Project Description
Routine Maintenance And Repair Routine Mandr Works At 220 / 132 Kv Substation Ramnagar Roorkee- 1 Operation Of Tubwell ( For 8 Hrs. ) Daily By A Suitable Experienced Operator Continuously Or In Different Intervals As Per Programme Fixed By The E / I Including Opening & Closing Of Valve, Changing Of Fuse Wire Etc. As Required For Proper Running Of Tubewell. 2 Sweeping Of Colony Roads And Srrounding Area Of Residences And Disposal Of Debris / Garbage Up To The Nearest Dustbin As Per Time Schedule Approved By E / I Including Cost Of All Labour And T&P Etc. Required For Proper Completion Of Work 3 Cleaning Of Drains Upto 0.3Mwide And Disposal Of Debris / Garbage Up To Nearest Dustbin Including Sprinkling Of Lime Powder Near Drains As Per Schedule Approved By E / I Including All Labour, Material And T&P Etc. Required For Proper Completion Of Work. 4 Cleaning Of Nala More Than 0.30 In Wide And Disposal Of Debris / Garbege Up To Nearest Dustbin Including Sprinkling Of Lime Powder Near Nala As Per Schedule Approved By E / I Including All Labour, Material T&P Etc. Required For Proper Completion Of Work. 5 Mannual Chlorination Of Water By Adding Bleaching Powder As Per Direction Of E / I Including Cost Of All Materials Labour And T&P Etc. Required For Proper Completion Of Work. 6 Cleaning Of Over Head Tank Capacity Ranging From 1001 Up To 30000 Ltrs. With Brush, Scraping Of Wall And Bottom & Disposal Of Rubbish Outside The Tank Including All Labour & T&P Etc. Required For Proper Completion Of The Work.
BOQ
| Sl. No. | Item Description |
| 1 | Operation of tubwell ( for 8 Hrs.) daily by a suitable experienced operator continuously or in different intervals as per programme fixed by the E/I including opening & closing of valve, changing of fuse wire etc. AS required for proper running of tubewell. |
| 2 | Sweeping of colony roads and srrounding area of residences and disposal of debris/garbage up to the nearest dustbin as per time schedule approved by E/I including cost of all labour and T&P etc. required for proper completion of work |
| 3 | Cleaning of drains upto 0.3mwide and disposal of debris/ garbage up to nearest dustbin including sprinkling of lime powder near drains as per schedule approved by E/I including all labour, material and T&P etc. required for proper completion of work. |
| 4 | Cleaning of Nala more than 0.30 in wide and disposal of debris/garbege up to nearest dustbin including sprinkling of lime powder near nala as per schedule approved by E/I including all labour, material T&P etc. Required for proper completion of work. |
| 5 | Mannual chlorination of water by adding bleaching powder as per direction of E/I including cost of all materials labour and T&P etc. required for proper completion of work. |
| 6 | Cleaning of Over Head tank capacity ranging from 1001 up to 30000 Ltrs. With brush, scraping of wall and bottom & disposal of rubbish outside the tank including all labour & T&P etc. Required for proper completion of the work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender