Mazagon Dock Limited has published Docking Plugs, Steel Work And Welding, Hull Cleaning & Preparation, Hull Painting, Sea Chests, Anchor And Chains, Hull Anodes, Chain Locker, Load Line ( Ll ) Marks & Supply Of Domestic Fw For Commercial Vessel Offshore Adventure- . Submission Date for this Tender is 12-09-2022. Coats and Jackets Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Scrapping, Cleaning and Initial Removal of barnacle From Under Water Hull Area |
2 | HP Jet Water Washing |
3 | LP Jet Water Washing (Water Included) |
4 | Copper Slag Blasting (SA 2.5) |
5 | Copper Slag Blasting (SA 2.0) |
6 | Copper Slag Blasting (SA 1.0) |
7 | Spot blasting |
8 | Airless 5 Coat Spray Painting (1200x5=12020 M2) |
9 | Paint touch up |
10 | Painting Ship Name, Draft Mark & Plimsoll Mark |
11 | Line Cutting (LL) |
12 | Cleaning the Dry Docks and Removing the Mud, barnacles & Wastage Copper Slag from the Dry-dock to outside MDL (including Dumper/transport) |
13 | Anchor & Anchor Chain LoweringPort & STBD Side. |
14 | Anchor & Anchor Chain Washing & Painting |
15 | Chain Locker muck removal, scrapping, Cleaning, Washing (Port & STBD Side) |
16 | Chain Locker Painting (Port & STBD Side) |
17 | Supply of Fresh Water Tanker (10 Ton capacity tanker) for Galley & Jet Washing |
18 | Steel work and anode welding |
19 | Sea chest – 2 Nos Port & Stbd - 600x900 mm |
20 | Sea chest Port high suction 600 x 2000mm |
21 | Sea chest stbd high suction 600 x 2000mm |
22 | Sea chest centre port and stbd 2 nos 600 x 2200 mm |
23 | Sea chest centre 600 x 900 mm |
24 | Stern Hull – Anodes Type A-80 |
25 | Remainder Hull – Anodes Type A-80 |
26 | Rudder (2PCS) – Anodes Type A-50 |
27 | Rudder Flaps (2 PCS) – Anodes Type A-25 |
28 | Thruster Tunnel FR.8,5 – Anodes Type A -50 |
29 | Thruster Tunnel FR.9,4 – Anodes Type A -80 |
30 | FWD Sea Chest FR. 75-77, High – Anodes Type A-25 |
31 | FWD Sea Chest FR. 75-77, Low – Anodes Type A-25 |
32 | Aft Sea Chest FR. 16-17, High – Anodes Type A-25 |
33 | FI-FI Fr. 75-77 (PS & SB) – Anodes Type A-25 |
34 | Azimuth Nozzle – Anodes Type A-25 |
35 | Azimuth Body – Anodes Type A-25 |
36 | Azimuth Room – Anodes Type A-25 |
37 | Removal & Re-fitment of Tyre fenders |
38 | Low Sea Chest Valve Before Filter - E/R STBD SIDE – 300NB Butterfly Valve |
39 | Low Sea Chest Valve After Filter - E/RSTBD SIDE - 300NB Butterfly Valve |
40 | Compressed Air NR Stop Valve - E/R STBD SIDE – 15NB SDNR Valve |
41 | Compressed Air NR Stop Valve - E/R STBD SIDE – 15NB SDNR Valve |
42 | Chemical Dosing NR Stop Valve - E/R STBD SIDE – 25NB SDNR Valve |
43 | Chemical Dosing NR Stop Valve - E/R STBD SIDE – 25NB SDNR Valve |
44 | OWS OBD NR Stop Valve – E/R STBD SIDE AFT, ON TOP OF OWS – 25NB SDNR Valve |
45 | Sewage OBD Storm Valve – E/R PORT SIDE, ON TOP OF A/E#1 – 65NB Storm Valve |
46 | Air Vent Butterfly Valve(PORT) - E/R PORT SIDE – 65NB Butterfly Valve |
47 | Air Vent Butterfly Valve(STBD) - E/R STBD SIDE – 65NB Butterfly Valve |
48 | High Sea Chest Valve Before Filter - E/R STBD SIDE – 300NB Butterfly Valve |
49 | High Sea Chest Valve After Filter - E/R STBD SIDE – 300NB Butterfly Valve |
50 | Air Vent Butterfly Valve - E/R STBD SIDE – 65NB Butterfly Valve |
51 | Air Vent Butterfly Valve - Pump Room STBD SIDE AFT – 65NB Butterfly Valve |
52 | Sea Inlet Valve - Pump Room STBD SIDE AFT – 200NB Butterfly Valve |
53 | Bilge Pump suction Butterfly Valve - E/R STBD SIDE AFT – 100NB Butterfly Valve |
54 | EMGY Fire Pump suction Butterfly Valve - Pump Room STBD SIDE AFT – 100NB Butterfly Valve |
55 | Fi-Fi Sea Inlet Butterfly Vale PORT - E/R PORT SIDE – 450NB Butterfly Valve |
56 | Fi-Fi Sea Inlet Butterfly Vale STBD - E/R STBD SIDE – 450NB Butterfly Valve |
57 | Sounding system draft butterfly Valve (2) - Pump Room STBD SIDE AFT – 32NB SDNR Valve |
58 | L.T S.W OBD Butterfly Valve PORT - E/R PORT SIDE, NEAR PORT LT COOLER – 150NB Butterfly Valve |
59 | L.T S.W OBD Butterfly Valve STBD - E/R STBD SIDE, NEAR STBD LT COOLER – 150NB Butterfly Valve |
60 | Grey water OBD storm valve - E/R PORT SIDE CORNER – 65NB Storm Valve |
61 | L.T S.W cooling pump suction valves (4) - E/R STBD SIDE – 150NB Butterfly Valve |
62 | L.T S. W cooling pumps discharge. NRV (2) - E/R STBD SIDE – DN 150 NRV |
63 | BHS comp. S.W cooling OBD valve - CEMENT ROOM EMEY. EXIT PORT&STBD – 65NB Butterfly Valve |
64 | Emergency bilge suction valve - E/R STBD SIDE – DN 150 NRV |
65 | Cleaning of Azimuth Thruster |
66 | Supply of carry way pipes with adequate length including connection / disconnection along with pipe fittings as per vessel requirement. |
67 | Removal and Refitting of Docking Plugs |
68 | Plating renewal/crop and renew in way of settling tank Stbd ship side and carry out NDT after fitment |