Construction Of Nature Interpretation And Training Centre ( Nitc ) - Cum- Laboratory For The Deptt. Of Forest Product At Dr Ysp University Of Horticulture And Forestry Nauni-Solan ( Sh Only Structure On The Top Of Apiculture Building )
Tender Overview
Project Description
Construction Of Nature Interpretation And Training Centre ( Nitc ) - Cum- Laboratory For The Deptt. Of Forest Product At Dr Ysp University Of Horticulture And Forestry Nauni-Solan ( Sh Only Structure On The Top Of Apiculture Building )
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Sep-2022 | Tender fee and EMD not exempted | Other | 20-Sep-2022 |
BOQ
| Sl. No. | Item Description |
| 1 | Centering and shuttering including strutting, propping etc. and removal of form for etc. complete in all respect as per satisfaction of Engineer-in-charge. a). Shelves (Cast in situ) |
| 2 | b). Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 3 | c). Stairs, (excluding landings) exceptspiral-staircases |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases andspiral stair cases above plinth level up to all floor level, excluding thecost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (one cement : one & half coarse sand : three graded stone aggregate 20 mm(twenty milimetre) nominal size) etc. complete in all respect as per satisfaction of Engineer-in-Charge. |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level etc. complete in all respect as per satisfaction of Engineer-in-Charge. a) Cold twisted bars. |
| 6 | Half brick masonry with common burntclay F.P.S. (non modular)bricksofclassdesignation7.5 in superstructure above plinth level up to all floor level with cement mortar 1:4 (one cement : four sand) etc. complete in all respect as per satisfaction of Engineer-in-charge. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender