|
| 1 | E/W in Excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading ,removal of stumps and other …….do..do… all complete job. Ordinary Soil |
| 2 | Soft Rock |
| 3 | Plain / Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications .do…do..all complete job.(PCC Gr- M-20) |
| 4 | Plain / Reinforced cement concrete in Sub-structure complete as per drawing and Technical Specifications .do…do..all complete job.(PCC Gr- M-20) |
| 5 | Plain / Reinforced cement concrete in Sub-structure complete as per drawing and Technical Specifications .do…do..all complete job.(PCC Gr- M-20)do-----do--------all complete job. |
| 6 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 7 | Backfilling behind abutment ,wing wall and return wall with Sandy material complete as per drawings & technical specification clause 1204.3.8 |
| 8 | Plain / Reinforced cement concrete in sub - structure complete as per drawing and Technical Specifications……do……do..all complete job.(PCC GRADEM-25 IN deck Slab) |
| 9 | Providing and layingcement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. |
| 10 | Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate,true to line and grade,tolurence of vertical RCC post not to exceed 1 in 500,centre to centre spacing between vertical post not to exceed 2000 mm,leaving adequate space between vertical post for expansion,complete as per approved drawings and technical specifications.do-----do--------all complete job |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications do-----do--------all complete job. |
| 12 | Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 do-----do--------all complete job. |
| 13 | Plaster with C.M (1:3) on Brick work in sub -structure as per Technical specifications.do-----do--------all complete job. |
| 14 | Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification. |
| 15 | Dewatering During working period with 10H.P diesel set |
| 16 | E/W in Excavation in Foundation Trenches in all kinds of soil do-----do--------all complete job. |
| 17 | Providing and laying P.C.C M-150 with nominal mix of (1:2:4) in foundation do-----do--------all complete job. |
| 18 | Providing rough dressed course stone masonry in cement mortar (1:4) in foundation and plinth with hammer dressed stone of less than 0.03m3 in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening, raking out joints to 20mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 19 | Providing rough dressed course stone masonry in cement motar (1:4) in superstructure with designation 75A brick and approved quality of clean coarse sand of F.M 2 to 2.5 including the cost of screening, carriage of materials, scaffolding, raking out joint to 20mm depth, curing, taxes and royalty (but excluding the cost of reinforcement) all complete as per building specification and direction of E/I. |
| 20 | Providing 25mm. Thick cement plaster (1:3) with clean caorse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 21 | Earth Work in Filling foundation trenches or back filling of masonary structure .............. with 30 m Leadall complete as per direction of E/I. |
| 22 | Earth Work in Filling foundation trenches or back filling of masonary structure .............. with ½ Km. Leadall complete as per direction of E/I. |
| 23 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick well watered, rammed,fully compactted and fine dressesd with earth obtained after cutting within a lead of 50 M and direction of E/I(Mode of measurement compacted volume) Extra for each subsequent lead upto 25M beyond the initial lead of 50M (maximum upto 150M by head load) as per specification and direction of E/I |
| 24 | Embankment construction with material obtained from Borrow Pits (Construction of embankmentwith approved material obtained from borrow pits with all lifts and leads, transporting to site, spreadinggrading to required slope and compacting to meet requirement of table 300-2) Rolling with smooth wheeled roller |
| 25 | Construction of granular sub-base by providing close graded materials, spreading in uniform layers withmotor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) |
| 26 | Water Bound Mecadam (Providing, laying, spreading and compacting stone aggregate of specific sizes to water bound mecadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes/Smooth 3 wheeled Steel Roller in stages to proper grade and camber, applying and brooming requisite type of screening/binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density) Using Screening Crushable Type such as Moorum or Gravel with smooth 3 wheeled steel Roller. Grading – I. |
| 27 | Providing P.C.C. M-200 with nominal mix of (1:1.5:3)in road surface with approved quality of stone chips 20 mm to 6 mm size grades and clean coarse sand of FM 2.5 to 3 includig screening, shutterig, mixing cement concrete in mixer and placing in position , virating, striking, curing, taxes and royalty all complete as per building specifications and direction of E/I. job. |
| 28 | Carriage of Materialcement |
| 29 | Steel |
| 30 | sand |
| 31 | Boulder |
| 32 | Stone chips |
| 33 | Metal |
| 34 | Morrum |
| 35 | GST @ 18% |
| 36 | Labour cess @ 1% |