Repairs To Joint Filling , Epoxy And Other Connected Works At Main Runway, Orp And Certain Other Aircraft Movement Area At Af Stn Kalaikunda Under Ge ( Af ) Kalaikunda Repairs To Joint Filling , Epoxy And Other Connected Works
Tender Overview
Project Description
Repairs To Joint Filling , Epoxy And Other Connected Works At Main Runway, Orp And Certain Other Aircraft Movement Area At Af Stn Kalaikunda Under Ge ( Af ) Kalaikunda Repairs To Joint Filling , Epoxy And Other Connected Works
BOQ
| Sl. No. | Item Description |
| 1 | M&L for preparing pavement joints by removal of (taking out) the existing polyurethene sealant or any other compound to a depth as directed , by chiseling from the joints, cleaning the joint surface thoroughly and grinding side of joint with grinding machine to make the surface free from dust faces of bitumen or any other sealing compound without disturbing the pavement , then finally cleaning the joint withcompressedair by air blower and vacuum cleaner etc . Providing backup material (polyprophylene backup rod) of suitablewidth and depthas per available space in the pavement joints andalso to maintain a depth (min 10 mm)to accommodate joint sealant as specified. Priming both sides of the joint surface upto the top level of backup materialwith specified primer andapply polyurethene base joint sealant properly leaving 3mm gap from top surface of concrete as per manufacturer\"s instructionusing masking tape to avoid accidental spillage , size of joint is 26 to 30 mm wide and 50 mm average depth complete all as specifed and directed by Eng-in-charge. Note:- i)Tenderer attention is invited to the depth of pavement joint required to be cut, in case of extra cutting tenderer needs to make good with suitable filler as directed at his own cost. (ii) Filling of joints to be done 2 to 3 mm recessed during summer and in winter it should be filled upto top up.(iii) Fly wheel , spatula , trangular pallet Knife etc to be used to maintain the recess and to give aesthetics. |
| 2 | All as per item No 1.00 above but, size of joint is 21 to 25 mm wide and 44 mm average depth complete all as specified and as directed. |
| 3 | All as per item No 1.00 above but, size of joint is 16 to 20 mm wide and 38 mm average depth complete all as specified and as directed . |
| 4 | All as per item No 1.00 above but, size of joint is 10 to 15 mm wide and 32 mm average depth complete all as specified and as directed . |
| 5 | All as per item No 1.00 above but, size of joint is below 10 mm wide and 26 mm average depth complete all as specified and as directed . |
| 6 | Repair to broken spalled edges of joints pot holes etc of existing concrete slab by forming square/rectangular grooveswith diamond/Machine cutter wider towards bottom to from key with the existing quality concrete cleaning / dusting the grooves using compressed air to remove all dust and dirt by air blower and repairing with Epoxy mortarafter applying epoxy primerand applying one coat of Epoxy resin (Base & hardner Ratio 2:1) over epoxy mortor , finished complete all as manufacturer\"s instructions and as directed . |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender