Kolkata Metropolitan Development Authority-KMDA has published Overhauling , Dismantling And Repairing Of Vertical Turbine Pump No.02 ( Make: Flowmore , Discharge ; 1630 Cum / Hr., Head= 35.20 M , 250 Kw , 6Kvht Motor ) With Supplyingof Necessary Sparesalongwith Allied Work At Raw Waterpumping Stationat Gaskolgha. Submission Date for this Tender is 23-09-2022. Pump repair and Maintenance Tenders in 24 Paraganas North West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 20-Sep-2022 | date_corrigendum | Date | 23-09-2022 |
Sl. No. | Item Description |
1 | Removaland reinstallation of the 6 KV HT Motor ( Cap: 250 Kw , 1080 RPM Matharan make)for pump no.02after disconnecting themotor connection line and removing of motor stool , lower half coupling ajuctment nutsandstaking them in repairing bay as per direction of the EIC |
2 | Withdrawlingthe Pump No.02 ( Dis: 1630 m3/hr., Head: 35.20 m , Make: Flowmore)anddismantling the coloumn pipes, line shaft bushes and coupling, bellmouthand cutless bearingetc. part by part as per as per direction of EIC for RWPS Titagarh. |
3 | To and fro transportation charges of required items from pump house to workshop and return the same from workshop to pump house as per direction of the EIC |
4 | Supplyand delivery of Cutless rubber Bearing ( OD: 105 mm , L=165 mm) as per sample and technical specification for coloumn pipeand direction of the EIC |
5 | Supply ,delivery of Line Shaft Sleeve (L= 230 mm , ID= 68 mm , OD= 73 mm )as per sample and direction of the EIC |
6 | Supply ,delivery of HeadShaft Sleeve (L= 320 mm , ID= 68 mm , OD= 73 mm )as per sample and direction of the EIC |
7 | Supply ,delivery of Teflon Gland Packingas per sample and direction of the EIC |
8 | Supply, delivery of HT Bolt , Nut , Washer(M24 x 110 L ) as per sample and direction of the EIC |
9 | Supply ,delivery ofRetainer Gasketas per sample and direction of the EIC |
10 | Supplyand deliveryat site of Pump Stainer as per sample and direction of EIC. |
11 | Reinstallation of the Pump( Dis: 1630 m3/hr., Head: 35.20 m , Make: Flowmore)assembly after reassembling theBellmouth , cutless bearing ,line shaft , bushes , sleeve ,coloumn pipe and TBHaccessoriesetc.allcompleteand proper alignment with the pumpin the presence of Pump expart and direction of the EIC for RWPS Titagarh. |
12 | Painting the coloum pipes, bellmouthandmotor resting frame after chipping and one coat of weither coat epoxy primer as per direction of the EIC. |
13 | Add Labour Welfare Cess @ 1.00 % on Rs.277304.25i.e Total amount over item no. 1.00 to 12.00 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail