Indian Navy-IN has published Rfp For Erdd 22 Of In Asset - Hull Sow - In Asset ( Erdd 22 ) 001 Docking- Vessel To Be Docked In Both Versions.Note 1:- Firms Not To Quote View Docking, Undocking And Dock Blocks Preparation Will Be Done By Navy And The Job Is Required To Be Carried . Submission Date for this Tender is 29-09-2022. Coats and Jackets Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | HULL SOW - IN ASSET (ERDD 22) 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises [i.e ND(V)/slipway]. |
2 | 002 Hull Cleaning Under Water, Boot Top Area, Shipsideabove water, Weather Deck and Superstrcture (a) jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey. |
3 | 002 Hull Cleaning Tanks (b) Manually clean of all internal tanks. The tanks should be washed out with fresh waterand soap water to remove any sediment or dirt present in the tank. Qty 06 Nos |
4 | 003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull including boot top area, above water hull, super structure, all internal compartmentsweather decks including deck fittings(i.e. bollards. cable reel anchor windlass foundation )Firm to submit 04 copies of Hull survey report . |
5 | 004 UTG Survey Carry out UTG survey in the presence of QC representatives of U/W hull, Internal Tanks and weather deck and wherever recquired ie.superstructure,above water hull, tank top etc.as directed by survey team. Firm to submit 04 copies of Hull survey report. |
6 | 005 Steel Renewals Quote for steel renewal at various locations as per survey report Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2" MFMB) material in the budgetary cost for 50 sqm each. |
7 | 006Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm - 150Nos |
8 | 006 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor(b) 50 x50 mm - 150 Nos |
9 | 007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor |
10 | 008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT. |
11 | 009Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted. |
12 | 010Sacrificial Anodes (a) Renew MK - II sacrificial anodes which are perished over 50%. Note:- Anodes will be supplied by Firm. |
13 | 010Sacrificial Anodes (b) Renew MK - III sacrificial anodes which are perished over 50%. Note:- Note:- Anodes will be supplied by Firm. |
14 | 011 Surface preparation Under Water area including Boot top area with Grit Blasting Grit blasting to SA 2.5on complete UW area including boot top for renewal of paint as per NO-53/16 |
15 | 012Painting - Jotun SchemeUnder Water area including Boot top area Complete UW Paint scheme renewal view last paint scheme done in 2012 while induction and due for renewal as per NO-53/16 :- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat:Primer - penguard primer - 50 microns |
16 | 012Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium)- 150 microns |
17 | 012Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns |
18 | 012Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns |
19 | 012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT |
20 | 012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT |
21 | 012 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Black)-1x150 microns DFT Note: 7th Coat is only for boot top area. |
22 | 013 Surface Preparation Above Water Area, super structure and Deck fittings (a) surface preparation of area to ST3 standard wherever required and as directed by paint OEM rep. |
23 | 013 Surface Preparation Above Water Area, super structure and Deck fittings (b) Carry out surface preparation with sweep blasting to ST1 standard for paint application as recommended by paint OEM. |
24 | 014Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat:Penguard primer - 50 microns DFT |
25 | 014Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT |
26 | 014Painting - JOTUN Scheme Above Water Area, super structure and Deck fittings Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT |
27 | 014Painting - JOTUN Scheme. Above Water Area, super structure and Deck fittingsPaint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP RAL 9011(black) - 60 microns DFT |
28 | 015Surface Preparation Weather Decks and Bridge TopCarry out Hydrojet ballasting toWJ 2.5 standard. |
29 | 016Painting - JOTUN SchemeWeather Decks and Bridge TopPaint weather decks and bridge Top with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat:primer - Penguard Primer -50 microns DFT |
30 | 016 Painting - JOTUN SchemeWeather Decks and Bridge TopPaint weather decks andbridge Top with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotacote Universal N10 (Aluminium)- 2X150 microns |
31 | 016 Painting - JOTUN SchemeWeather Decks and Bridge TopPaint weather decks andbridge Top with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Non Slip Epoxy D.A. Grey with hardner (HDNS)- 2X250 Microns |
32 | 017Surface Preparation Internal Tanks Carry out mechanical cleaning toST3 standard as per survey report of Paint OEM for paint application. (Only 25% area for Touch-up painting). |
33 | 018 Painting -JOTUN Scheme Internal Tanks Paint internal tanks with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat:primer - Penguard Primer -50 microns DFT |
34 | 018 Painting -JOTUN Scheme Internal Tanks Paint internal tanks with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns |
35 | 018 Painting -JOTUN Scheme Internal Tanks Restore final coat of Paint after necessary surface preparation in internal tanks with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3nd Coat: Anticorrosive Balloxy (HB light) - 150 microns |
36 | 019 Drain Plugs Drain plugs of internal taks jammed, To be renewed as per sample. |
37 | 020 NWT Doors NWT Wooden door broken, to be renewed including Door frame/ coaming. |
38 | 021 Sky Lights Sky lights rubber beading and B/F Nut / T bolts damage ( B/F/T/B 20mmX6 inch, Rubber beading 12 ft X 16 mm thick) Rubber coaming size 16 mm - 15 ft) |
39 | 022 Cable Guide Roller Overhaulling of Cable guide roller assembly including gear box and driving chain assembly. |
40 | 023 Cable Reel (a) Overhaulling of Cable Reel assembly including gear box and driving chain assembly. |
41 | 023 Cable Reel (b) Overhaulling of manual operating machenism of Cable Reel. Note: trials to be conducted post overhaulling in presence of QC. |
42 | 024 Gauardrail and Stanchions (a) Fixed guardrail stanchions and pipes damaged/ broken to be renewed. Pipe Dia - 2 inch |
43 | 024 Gauardrail and Stanchions (b) Fixed guardrail stanchions and MS rod damaged/ broken to be renewed. Rod Dia - 1 inch |
44 | 024 Gauardrail and Stanchions (c) Guardrails Securing chain damaged/ broken to be renewed. |
45 | 024 Gauardrail and Stanchions (d) D- Shackles for guardrails Securing chain damaged/ broken to be renewed. |
46 | 025 WT Hatch Renewal of butterfly Nuts of WT hatches |
47 | 026 WT Door Overhauling of WT Door including clips(06 Clips). |
48 | 027 Rubber Beading Renewal of rubber beading of WT doors and WT hatches. Note: post renewal of rubber beading Chalk Test to be prooved |
49 | 028 Furniture (a) Wooden Panelling with Sunmica at various location damaged, to be renewed. |
50 | 028 Furniture (b) fitment of plywood for 02 Bunks. |
51 | 029 MFMB Lagging MFMB lagging perished at various location, to be renewed. |
52 | 028 Wiremess (b) Wiremess of mushroom head damaged, to be renewed. |
53 | 029 Linoleum sheet Linoleum sheet to be renewed. |
54 | 030 Sliding Window Slinding glass of window jammed to be repaired |
55 | 031Tank Vent Pipe(a)Vent pipes of various tanks on upper deck corroded and thinned, to be repaired.(Mat. GI pipe)Pipe dia 50MM |
56 | 031Tank/Vent Pipe (b) Distance piece and flanges of vent corroded and thinned, to be repaired : Dia 50mm(including rubber joints) |
57 | 032BollardsSingle bollards (a)Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Size: Dia-12", Height- 1.4 Mtr Note: Serviceability checks to be carried out post renewal. |
58 | 032 BollardsSingle bollards (b)Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Size: Dia-12", Height- 1.4 Mtr Note: Serviceability checks to be carried out post renewal. |
59 | 033Bollards Twin bollards(a) Twin Bollards including foundation corroded, thinned to be repaired as per Hull survey report. Size :900X350 MM, Dia 250MM |
60 | 033Bollards Twin bollards(b) twin Bollards including foundation corroded, thinned to be renewed as per Hull survey report. Size :900X350 MM, Dia 250MM |
61 | 034 Anchor windlass Overhaul anchor windlass (including lub oil renewals), renew brake linings, refit and prove for satisfactory operation. Note :- Overhaul involves removal of drum, gearbox, brake lining, motor, renwal of grease nipples (20Nos), and refitment. |
62 | 035 Guide Roller Guide Roller of chain cable jammed to be Overhauled |
63 | 036D SHAPED FENDERS (a) "Removal of all D shaped fenders for survey of C channels and necessary repairs is to be attended on securing channels including nut and bolts). Post repair of C channels fenders is to be fitted |
64 | 036D SHAPED FENDERS (b)Post repair of C channels damaged fendersto be renewed Details of D shaped rubber fender and associated fittings are as follows:- D shaped fenders of 1500 X200 internal Dia -3". |
65 | 036 D shaped fenderssecuring arrangement nut and bolts (c) Fender securing arrangement i.e nut and boltscorroded/thinned , to be renewed for securing of D fenders around ship side. Size: Length- 300MM` |
66 | 037 Surface Preparation Fresh Water Tanks (02 Nos) (a) Carry out mechanical cleaning toST3 standardfor paint application. |
67 | 038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT |
68 | 038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat:Penguard HB(Grey) -100 microns DFT |
69 | 038 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos)Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3rd Coat: Penguard HB (white) -100 microns DFT |
70 | 039 Manhole Cover (a)Manhole cover of various tanks corroded/thinned, to be renewed as per survey report. |
71 | 039 Manhole Cover (b) Nut and Bolts of Manhole cover to be renewed as. Mat-SS |
72 | 039 Manhole Cover (c) Rubber Joints of manhole cover to be renewed |
73 | 039 Manhole Coaming (d) Manhole coaming not holding WT integrity. Carryout necessary repairs and all tanks to be proved for APT. |
74 | 040 Surface Preparation Internal Compartment (a) Carry out mechanical cleaning toST3 standard (Bare Metal) for paint application. |
75 | 040 Painting - JOTUN Scheme. Internal Compartment Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard Primer -50 microns DFT |
76 | 040 Painting - JOTUN Scheme. Internal Compartment Paint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat:Jotamastic 80 (Grey) -150 microns DFT |
77 | 040 Painting - JOTUN Scheme. Internal CompartmentPaint two in no. fresh water tanks with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also.(c) 3rd Coat: Middle burnswick green finishing paint -100 microns DFT |
78 | 041Weather Protective Cover (a) Manufacturing of water proof canvas cover for cable reels as per sample. |
79 | 041Weather Protective Cover (b) Manufacturing of water proof canvas cover for motors as per sample. |
80 | 042 Cable guiding mechanism Cable guide mechanism (06 nos) are mounted on angle bar foundation. Complete angle bar foundation is to be replaced with C Channels foundations. Alignment of complete guide mechanism to be undertaken post replacement of foundations and trials to be conducted in presence of SS. |
81 | ENGINEERING SCOPE OF WORK 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, POWER-28KW @ 1500 RPM |
82 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, a) Engine lub oil to be drained,sump to be cleaned & fresh lub oil to be charged in sump. Lub oil 15W40, Qty-100 Ltrs (Lub Oil to be provided by Firm) |
83 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, b) Replacement of air filter to be carried out . (Filters to be provided by Firm |
84 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, c) Radiator fins to be cleaned. |
85 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, d) Renewal coolant inhibitor with zinc plugs to be carried out. |
86 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, e) Replacement of Engine Oil filters & fuel oil filtersto be carried out. (Filters to be provided by Firm) |
87 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, f) Valve clearance to be checked and adjusted |
88 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, g) Tightening of all external fasteners to be checked & Tightned if necessary. |
89 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, h) Injectors to be overhauled. |
90 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, i) Injectors to be replaced with new. |
91 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, k) Engine cooling water tan cooling water with additives.(10:2 standard) to be replaced. |
92 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, l) Replacement of belts to be carried out. |
93 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, m) Engine starting motor to be overhauled and prove for satidfactory operation. |
94 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, n) Cooling Fresh water Pump to be overhauled and prove for satidfactory operation. |
95 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (p) Replace all rubber hoses & rubber clips. (Qty-06) |
96 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (r) Remove & chemical cleaning oflub oil cooler to be carried out.Replacement ofgasket,seals/ "o" rings t be undertaken. Cooler to be pressure tested & prove for satisfactory Performance. |
97 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (s) Radiator to be cleaned with air. (Do not use Water & chemicals for cleaning).& Radiator pressure Cap to be replace with rubber ring. |
98 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (t) Fuel shut off solenoid valve to be overhauled. |
99 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA, (u) Coolant replinish tank to be repaired/fabricated |
100 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA (v) Post completion of routine, engine to be proved for satisfactory perfomance |
101 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA,Following gauges of DG control panel to be renewed (w) Lub oil pressure gauge.(Range - 0 to 4 kg/cm2) |
102 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA,Following gauges of DG control panel to be renewed (x) Fresh water pressure gauge.(Range - 0 to 4 kg/cm2) |
103 | 1001DIESEL GENERATOR,MAKE-GREAVES,MODEL-3G11NA,Following gauges of DG control panel to be renewed (y) Ignition switch with key |
104 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. |
105 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm |
106 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm |
107 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (c) Dia 50 mm |
108 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Domestic fresh water system/ fire hydrant system (d) Dia 50 mm |
109 | 1002Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Fuel System e) Dia 50 mm |
110 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. |
111 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (a) Dia 80 mm |
112 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (b) Dia 50 mm |
113 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (c) Domestic fresh water system/ fire hydrant system Dia 50 mm |
114 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (d) Domestic fresh water system/ fire hydrant system Dia 50 mm |
115 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. e) Fuel systemDia 50 mm |
116 | 1003 Following system pipes are to be chemically cleaned & pressure tested upto 1.5 times of working pressure. (f) Fuel system Dia 25 mm |
117 | 1004 MISCELLANEOUS: (a) Exhaust laging ofDG exhaust system to be renewed,Dia-50mm |
118 | 1004 MISCELLANEOUS: (b) Chemical cleaning of exhaust systemofDG(Dia-50mm) |
119 | 1004 MISCELLANEOUS: (c) Fuel RU tank & storage tank level indicator sight glass to be provisioned with new end cocks/fittings. |
120 | 1004 MISCELLANEOUS: (d) Cleaning of fuel storage tankto be carried out. |
121 | 1004 MISCELLANEOUS: (e) Cleaning ofRU tank to be carried out. |
122 | 1004 MISCELLANEOUS: (f)Fuel system hand pump overhaulingto be carried out. Hand pump to be proved for satisfactory operation |
123 | 1004 MISCELLANEOUS: (g) Cleaning of both domestic fresh water tank to be carried out.Post cleaning paint to be applied. |
124 | 1004 MISCELLANEOUS: (h)Overhauling of Cable drum guide mechanism to be undertaken. Roller & Chain arrangement to repaired and bearings to be renewed.Track and foundation to be sufficientely strengthen. Operation of Cable drum guide mechanism to be proved for satisfactory performance. |
125 | Electrical Work Package 2001 Diesel Alternator 20KVA,415V,3PH,50HZ (a) Engine electrical starter (12V) to be overhauled. |
126 | 2001 Diesel Alternator 20KVA,415V,3PH,50HZ (b) Callibration of Electrical Control Panel & Engine safety unit to be carried out. |
127 | 2001 Diesel Alternator 20KVA,415V,3PH,50HZ (c) Oil Pressure Gauge, Water Pressure gauge and indicators to becallibrated |
128 | 2001Diesel Alternator 20KVA,415V,3PH,50HZ (d) Battery (12V,180 Amp-Hr capacity) to be renewed |
129 | 2002 Switch Board Main Switch Board 415V, 3Ph,Make: Switch control Gear Calibrate the following Meters to be undertaken andcalibration certificate to be rendered(a) 0-300 V Voltmeter |
130 | 2002 Switch Board Main Switch Board 415V, 3Ph,Make: Switch control Gear Calibrate the following Meters to be undertaken andcalibration certificate to be rendered(b) 0-500 V Voltmeter |
131 | 2002 Switch Board Main Switch Board 415V, 3Ph,Make: Switch control Gear Calibrate the following Meters to be undertaken andcalibration certificate to be rendered(c) 0-60 A Ammeter |
132 | 2003Windlass control System Windlass Motor (5Hp,415V,3Ph)(a) Windlass motor to be overhauled and prove for satisfa tory performance |
133 | 2003Windlass control System Windlass Motor (5Hp,415V,3Ph) (b) Windlass control Panel: Make-Geeta Engg,Mumbai , Overhauling of Control Panel to be carried out. |
134 | 2003Windlass control System Windlass Motor (5Hp,415V,3Ph) (c)Windlass Controller on upper deck to be overhauled. Controller protection cover (weather protection box) to be fabricated. |
135 | 2004 Cable Drum Motors and Control System (a) Complete overhauling of Drum motor to be undertaken and prove for satisfactory operation Motor Type M24120415V,3Ph,7HP |
136 | 2004 Cable Drum Motors and Control System (b)Cable drum control panel and controller to be overhauled. (Cable Drum control panel Type:CP-3 Make: IS control system limited, Kolkata) |
137 | 2004 Cable Drum Motors and Control System(c) Cable drum reduction gear to be overhauled and prove for satisfactory operation |
138 | 2004 Cable Drum Motors and Control System(d) Cable drum clutch to be repaired. |
139 | 2004 Cable Drum Motors and Control System(e) Cable drum gearing mechanismchain to be replaced with new Chain |
140 | 2005 LightingFollowing light fittings are corroded and holder perished to be renewed with weather proof equipment |
141 | 2005 LightingFollowing light fittings andholder to be repaired (a) Light Fittings in Anchor Chain Compartment |
142 | 2005 LightingFollowing light fittings andholder to be repaired (b) LED reflectors on upper deck to be replaced. |
143 | 2005 LightingFollowing light fittings andholder to be repaired (c) Reflectors(port and stbd) on roof top to renewed. |
144 | 2005 LightingFollowing light fittings andholder to be repaired (d) Navigational Lights i.e. Mast head, Stern and Bow lights light fittings corroded, to be replaced with new |
145 | 2006 Battery (a)Serviceability checks of 12V X 2 batteries to be carried out |
146 | 2006 Battery (b) Battery Charger to be repaired Capacity 12V,8Amps |
147 | 2006 Battery (c) New Battery Charger to be provisioned Capacity 12V,8Amps |
148 | 2006 Battery (d)Newbatteries (12V , 180 AH) to be provided . |
149 | 2007 Transformer Transfer to be overhauled. Transformer12 KVA, 415/230V : |
150 | 2008 Shore Supply connection box Shore supply connection Box to be Fabricated. Shore Supply connection box 415 V, 3Ph Make: Switch control gear Mumbai. size (2 x 2.5 x 3 feet) : |
151 | 2009Battery Rack Battery rack for stowing DA starting batteries to be factricated |
152 | DRY DOCK AND ALLIED SERVICES WORK PACKAGE 1 (A) Docking and undocking charges (Both Versions) |
153 | 1 (B) Dock blocks preparation & laying out as per docking plan |
154 | 2 Dock hire charges for an estimated duration of 60 Days |
155 | 3 Wet basin/alongside hire charges for the remaining duration each (i.e. total refit duration of 120 days – 60 days docking period) |
156 | 4 Provision of sufficient lighting for duty staff |
157 | 5 Quote for maintenance of two in no. fire lines for the refit duration . |
158 | 6 Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 10 hrs or 100KM/day whichever is less |
159 | 7 QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. as per QIS Firms not to quoted for this serial since QC will be by ND(V)/MQC Dept. |
160 | 8 Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 3000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail