Renovation Works Of Buildings 11 Nos Under Sids 2021-22 In Kodavasal Block , Seethakamangalam Panchayat, Tiruvarur District - Package -7
Tender Value
6.39 Lakhs
Estimated cost
Bid Submission
15 Sep 2022
0 days left
EMD
6390
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
kodavasal → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Renovation Works Of Buildings 11 Nos Under Sids 2021-22 In Kodavasal Block , Seethakamangalam Panchayat, Tiruvarur District - Package -7
BOQ
| Sl. No. | Item Description |
| 1 | 1.Repairs to the PUE School RCC building (West Facing) at Vellamandapam Habitation in Seethagamangalam Panchayat |
| 2 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 3 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 4 | Dismantling the execting Flooringincluding cost and conveyance and all labour charges etc., completed |
| 5 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 6 | Pointing with CM 1:3 mix, to full depth of tiles using 10% coude oil 10% by weight of cement including cost and conveynace of all material etc., completed |
| 7 | Providing Antiskid Tilesfinish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 8 | White washing two coats using shell lime including cost of materils and all labour charges etc., completed |
| 9 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 10 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 11 | Provision forwindow repairsincluding cost and conveyance of all charges |
| 12 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 13 | Painting the black board painting including cost of materils and all labour charges etc., completed |
| 14 | Provision for Name Board Charges |
| 15 | 2.Repairs to the PUE School RCC building (West Facing) at Seethagamangalam Habitation in Seethagamangalam Panchayat |
| 16 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 17 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 18 | Dismantling the exectingFlooringincluding cost and conveyance and all labour charges etc., completed |
| 19 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 20 | Pointing with CM 1:3 mix, to full depth of tiles using 10% coude oil 10% by weight of cement including cost and conveynace of all material etc., completed |
| 21 | White washing two coats using shell lime including cost of materils and all labour charges etc., completed |
| 22 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 23 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 24 | Provision forwindowrepairs including cost and conveyance of all charges |
| 25 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 26 | Painting black boardincluding cost of materils and all labour charges etc., completed |
| 27 | Provision for Name Board Charges |
| 28 | 3.Repairs to PUE school Gents Toilet (East facing ) at Seethagamangalam in Seethagamangalam Panchayat. |
| 29 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 30 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 31 | Paving the floor with ceromic tiles including all labour charges etc completed |
| 32 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 33 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 34 | Painting two coats over newiron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 35 | Provisionfor ToiletDoor |
| 36 | Provisionfor iwc |
| 37 | Provision for Name Board Charges |
| 38 | 4.Repairs to PUE school Toilet Ladies ( West facing ) at Seethagamangalam in Seethagamangalam Panchayat |
| 39 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 40 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 41 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 42 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 43 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 44 | Painting two coats over oid iron Urinal Doorworks including cost of materils and all labour charges etc. |
| 45 | Provisionfor newDoor |
| 46 | Provisionfor iwc |
| 47 | Provision for Name Board Charges |
| 48 | 5.Repairs to PUE school Staff Toilet ( West facing ) at Seethagamangalam in Seethagamangalam Panchayat |
| 49 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 50 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 51 | Paving the floor with ceromic tiles including all labour charges etc completed |
| 52 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 53 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 54 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 55 | ProvisionforDoor repairs |
| 56 | Provision for Name Board Charges |
| 57 | 6.Repairs to PUE school Toilet PHC (East facing ) Seethagamangalam in Seethagamangalam Panchayat |
| 58 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 59 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 60 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 61 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 62 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 63 | Provisionfor newDoor |
| 64 | Provisionfor Western Closet |
| 65 | Provision for Name Board Charges |
| 66 | 7.Repairs to PUE school Girls Toilet at Melaramansethi in Seethagamangalam Panchayat |
| 67 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 68 | Brick workwith CM 1:5 mix, using country brickincluding cost and conveynace and all laour charges etc., completed |
| 69 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 70 | Paving the floor with ceromic tiles including all labour charges etc completed |
| 71 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 72 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 73 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 74 | Provision for Name Board Charges |
| 75 | 8.Repairs to PUE school Gents Toilet at Vellamandapam in Seethagamangalam Panchayat |
| 76 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 77 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 78 | Providing precast slab cm 1:2:4 mix using 20mm ISS Metal including all labour charges |
| 79 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 80 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 81 | Painting two coats over new iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 82 | Provisionfor newDoor |
| 83 | Provision for Name Board Charges |
| 84 | 9.Repairs to PUE school Toilet at Meelaramansethi in Seethagamangalam Panchayat |
| 85 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 86 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 87 | Paving the floor with ceromic tiles including all labour charges etc completed |
| 88 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 89 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 90 | Provision for Toilet Door |
| 91 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 92 | Provision for Name Board Charges |
| 93 | 10.Repairs to Kitchen Shed in Vellamandapam PUE school in Seethagamangalam Panchayat |
| 94 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 95 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 96 | Dismantling the exectingFlooringincluding cost and conveyance and all labour charges etc., completed |
| 97 | Dismantling the execting damaged weathering course pressed tilesincluding cost and conveyance and all labour charges etc., completed |
| 98 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 99 | Pointing with CM 1:3 mix, to full depth of tiles using 10% coude oil 10% by weight of cement including cost and conveynace of all material etc., completed |
| 100 | White washing two coats using shell lime including cost of materils and all labour charges etc., completed |
| 101 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 102 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 103 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 104 | Provision for doorRepairs |
| 105 | Provision for Windows Repairs |
| 106 | Provision for CFL |
| 107 | Provision for Name Board Charges |
| 108 | 11.Repairs to Kitchen Shed at Melaramansethi PUE school in Seethagamangalam Panchayat |
| 109 | Dismantling the execting CementPlasteringincluding cost and conveyance and all labour charges etc., completed |
| 110 | Platering with CM 1:5 mix, 12mm thick including cost and conveynace and all laour charges etc., completed |
| 111 | Dismantling the execting Flooringincluding cost and conveyance and all labour charges etc., completed |
| 112 | Dismantling the execting damaged weathering course pressed tilesincluding cost and conveyance and all labour charges etc., completed |
| 113 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete |
| 114 | Weathering course lime concrete including all labour charges |
| 115 | Finishing the Top Proof with one course of machine Pressed tiles includng all labour charges |
| 116 | White washing two coats using shell lime including cost of materils and all labour charges etc., completed |
| 117 | Distemberingtwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 118 | Exterior emulsiontwo coats with best approvde distembering including cost of materils and all labour charges etc., completed |
| 119 | Painting two coats over oid iron works using ready mixed enamel paintincluding cost of materils and all labour charges etc., completed |
| 120 | Provision for doorRepairs |
| 121 | Provision for Windows Repairs |
| 122 | Provision for Light Point |
| 123 | Provision for CFL |
| 124 | Provision for Name Board Charges |
| 125 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |
AI Tender Summary
Tender Timeline
Sep 03, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedSep 15, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 15, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender