Central Mine Planning And Design Institute Limited-CMPDI has published Planning , Design, Engineering, Construction, Fabrication , Erection, Supply, Installation, Testing, Trial Run And Commissioning Of Stp Of 80 Kld( Incl. Etp Of 25 Kld For Pre-Treatment Of Chemical Effluent) At Central Hospital, Naisarai ,Ramgarh, Ccl . Submission Date for this Tender is 14-09-2022. Fabrication Work Tenders in ramgarh Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Surveying, Planning and design of STP of 80 KLD ( including ETPof 25 KLD for pre-treatment) , preparation of Structural Drawings, Design approval from CMPDI etc. |
2 | Supply, installation, testing and commisioning of STP of 80 KLD ( including ETPof 25 KLD for pre-treatment) of approprite technologyas per scope of work given , including civil work ( except Plant Room),Electrical , Mechanical works etc in all complete. |
3 | Construction of controlRoom of minimum size 3m x 3.5m x 3.0 m (min. ht), adequate foundation as required , 9” brick wall, sufficient windows, Doors, Roof: M20 RCC roof, Flooring:required flooring, internal/external electrifications, all complete as per direction of EIC |
4 | Pipe line network of hospital effluent through proposed sump including sufficient inspection chambers to the proposed ETP/STPApprox. 500m pipe line with 6"dia (Minimum ) as per design requirement with inspections chambers as per site requirement |
5 | Comprehensive operation in 24x7, maintenance contract including necessary servicing and replacement of spare parts (OEM) etc. |
6 | Operation charges during warranty period of 12 months as per scope of workincluding disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
7 | Ist Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
8 | 2nd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work & disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
9 | 3rd Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work & disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
10 | 4th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one year as per scope of work & disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
11 | 5th Year of Comprehensive operation and maintenance charges after security period/ warranty period of one yearas per scope of work& disposal of sludge as per the CPCB guidelines/ Hazardous and Other Wastes [Management and Transboundary Movement] Amendment Rules, 2016. |
12 | Total impact of GST for the purpose of CTC |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail