Sales : +91-777 804 8217
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 15-09-2022 | Amendment to Class of Contractors and Critical Dates | Date | 27-09-2022 |
| 2 | 06-09-2022 | Minimum Eligibility Criteria | Technical Bid | 20-09-2022 |
| Sl. No. | Item Description |
| 1 | Sinking of11 Nos of 8\" dia Production Well through Rotary Rig (Gravel packing) :- Supplying all labour for drilling a perfectly vertical bore hole of specified diameter for a specified depth below G.L. in alluvial soil strata by mud rotary rig drilling as required to suit the site condition as per the direction of E.I.C including use of rig with its accessories, T&P and all consumable etc. for lowering of finished bore suitable for lowering of 200mm dia GI/ PVC pipe for housing, fited with sockets and with or without well screen as per necessity for soft, medium, hard and boulder formation (GI/PVC casing pipe if required by the contractor to prevent collapse of over burden portion) including lowering and withdrawing of casing pipe after drilling 200mm dia to 450mm dia in over burden portion. [at (a) Baligohiri-4 nos (b) Raigoan-3 nos, (c) Kahailia-3 nos and (d) Gopinathpur (Nuasahi)-1 no.]Labour for Drilling of 11 Nos. PWs each 100 mtr depth each (100 x 11 = 1100 Mtr) |
| 2 | Supply of all Labour & T&P for Lowering the following size GI/PVC casing pipes with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position, including cutting and threading pipes and slotted pipes and fixing all jointing materials, etc., complete and keeping the top of casing pipe threaded including plugging tube well to prevent entry of foreign materials from above excluding cost of fitting & jointing materials. Lowering of 200mm dia PVC pipe for 11 Nos. PWs each 100 mtr depth each |
| 3 | Cleaning and developing the tubewell their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer in charge. |
| 4 | Supplying all materials, labour and T&P and grouting with cement slurry for sanitary sealing around the GI/PVC casing pipe up to 3 mtrs. below ground level including cost of cement,all complete as per specifications &direction of Engineer-in-Charge. |
| 5 | Supplying all labour, T&P and materials for packing the bore with washed gravel (size P-6)around the pipes in good quality excluding cost of gravel etc, all complete as per specifications &direction of Engineer-in-Charge. ( For 11 nos PWs) |
| 6 | Supplying all Materials including transportation to site including loading & unloading etc., all complete8\" dia PVC pipe including cost of threading [ASTM(Sch-80) ] |
| 7 | 8\" dia PVC strainer ( slotted pipe ) with all fittings. [ASTM(Sch-80) ] |
| 8 | 8\" dia PVC End cap [ASTM(Sch-80) ] |
| 9 | 8\" dia PVC cone [ASTM(Sch-80) ] |
| 10 | 8\" dia PVC short piece 30 cm long [ASTM(Sch-80) ] |
| 11 | Sinking of2 Nos of 200mm x 150mm dia Production well through Odex Method:- Supplying all labour and drilling perfectly vertical bore hole in boulder formation areas with Down The Holes (DTH) hammer drilling rigs or combination drilling rigs to suit the site condition with deployment of rigs necessry accessories and consumable for a specified depth below the ground level including supply of necessary cashing shoe ODEX tools and plants jointing material extra sockets where required withdrawing of pipes lowering the M.S. (ERW) pipes and fitting and fixing in perfectly vertical position including cutting and welding for jointing the pipes for simultaneously casing lowering in over burden boulder formation till encounter of hard rock and to drill 200mm DTH upto the desired depth as may be necessary clearing the site and washing bore etc. all complete providing sanitary sealing upto 5 meter depth below ground level as per the site condition of E.I.C. [at Rajbati Area -2 Nos.]Labour for Drilling of 2 Nos. PWs. of 200mm dia 40.00 mtrs depth each (40 x 2 = 80 Mtr) |
| 12 | Supplying Labour for drilling a perfectly vertical bore hole of 150mm dia for a specified depth below boulder zone through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc.Labour for Drilling of 2 Nos. PWs. of 150mm dia 50.00 mtrs depth each (50 x 2 = 100 Mtr) |
| 13 | Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer in charge. |
| 14 | Supplying all Materials including transportation to site including loading & unloading etc., all complete200mm dia ERWPipe 6mm thick 80 Mtrs |
| 15 | Sinking of9 Nos of 200mm x 150mm dia Production well through DTH Rig:- Supplying all Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination drilling rigs (1200 cfm/ 300 psi) as required to suit the site condition as per the direction of Engineer-in-charge including use of own rigs with its accessories, tools and plant and consumables etc., for lowering of 200 mm dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (GI/PVC casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tube well). [at (a) Aleichandi-3 nos (b) Betsul-2 nos, (c) Mirigini-1 no, (d) Medical campus-2 nos, and (e) Gopinathpur -1 no.]Labour for Drilling of 9 Nos. PWs. of 200mm dia 90.00 mtrs depth each (90 x 9 = 810 Mtr) |
| 16 | Supplying for Labour for lowering the following sizes of MS/PVC casing pipes with or without slotted pipes as per the necessity of from ground level and fitted & fixed up in perfectly vertical position including cutting & threading pipes and slotted pipes and supplying & fixing of all jointing materials, extra sockets and T & P etc. all complete and keeping the top of the casing pipe threaded including plugging tubewells to prevent entry of foreign materials from above.Lowering of 200mm dia PVC pipe for 9 Nos. PWs each 30 mtr depth each (30 x 9 = 270 mtrs) |
| 17 | Cleaning and developing the tubewell using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipment and labour as per the direction of Engineer in charge. |
| 18 | Supplying all Materials including transportation to site including loading & unloading etc., all complete200 mm dia ASTM Pipe(Sch-80) |
| 19 | 8\" dia PVC End cap [ASTM(Sch-80) ] |
| 20 | 8\" dia PVC short piece 30 cm long [ASTM(Sch-80) ] |
| 21 | PUMPING MACHINERY for Production Well & UGR:- Supply, Installation & Testingof pumping set of approved make & following rating, head & discharge including supply of all labour, material, tools & plants all complete as per specification and direction of Engineer In-ChargeVertical/Horizontal Submersible |
| 22 | Supply, Installation & Testingof Star Delta control Pannel board with APFC arrangement for running of hoz & vertical submersible pump set, of approved make & following rating, head & discharge including supply of all labour, material, tools & plants all complete as per specification and direction of Engineer In-Charge. |
| 23 | Supplying fitting fixing and laying of Three Core Flat Cable with bare Bunched copper conductor Insulated with PVC and sheathed with PVC for Submersible Pump motors with voltage grade upto 1100 volt conforming to IS : 694 : 1990 :- 10 mm2 Flat Cable (for Submersible Pump) |
| 24 | COMMISSIONING OF PUMP AND MOTOR for 22 nos Production Wells:- Supplying all, materials labour T&P such as providing fitting,fixing of medium grade G.I. pipe cutting to the required size each with threading, welding of flanges with 5/8\" dia hole in flanges. The flanges should be in a horizontal position including cutting grooves for cable with the pipe so that each flanges when joint with rubber insertion packing shall remain water tight etc.completed as per specification and direction of E.I.C.80mm (3\" dia) x 3.0 mtr long G.I./M.S. Column Pipe welded with M.S. flanges/Socket joint both side (medium grade reputed make)(10 Nos. 80mm dia 3.0 M long pipe per each PW for 22 Nos. PWs (10 x 3 x 22 = 660 Mtr)/(10 x 22=220 Nos.) |
| 25 | Supplying all materials labour T&P & fitting, fixing of following materials etc.completed as per specification and direction of E.I.C.a) 100mm (4\" dia) x 1.0 mtr long G.I. pipe (Medium Grade) |
| 26 | b) Supplying of 100mm (4\" dia) G.I. Bend |
| 27 | c) Supplying of 90mm (3\" dia) M.S. Clamp |
| 28 | d) Supplying of MS well cover plate (P/W) |
| 29 | e) Supplying of 100mm (4\" dia) 10 mm thick MS flange |
| 30 | f) Supplying of 100mm (4\" dia) G.I. Socket |
| 31 | g) Supplying of Rubber insertion (3mm thick) |
| 32 | h) Supplying of 3/4\" Garware Nylon rope |
| 33 | i) Supplying of 5/8\" x 3\" Nut bolts |
| 34 | j) Supplying of 75mm dia 450mm long GI/MS Short piece |
| 35 | Supplying all labour, materials T&P for welding the 100mm dia socket with MS flange compt. as per specification and direction of E.I.C. |
| 36 | Supplying all labour T&P for lowering ofsubmersible motor with pump with required nos. of column pipe jointing by applying rubber insertion between the flanges with nut bolts to make it air tight perfectly, cable & garware nylon rope should be water tight perfectly including transportation charges of all materials. |
| 37 | Supplying all labour, materials, T&P for fitting fixing C.I Sluice Valve with double flanged ends for water works purposes confirming to IS: 14846-2000 for the following rating and nominal diameter as per specification complete.100mm (4\" dia) C.I. Sluice valve (PN - 1.0) |
| 38 | Supplying all labour, materials, T&P for fitting fixing swing check type Reflux valves (Non-Return Valves) with double flanged ends confirming to IS: 5312(Part-I)-2004 for water work purposes for the following rating and nominal diameter as per specififcation complete.100mm (4\" dia) C.I. NR valve |
| 39 | Supplying all labour, materials T & P and providing laying in trenches Double Flanged Duck foot 100 mm dia C.I Duck Foot Bend confirming to IS: 1538-1993 (Part-XVIII) of the following nominal diameter as per specification complete. 100mm dia. x 90° C.I Duck foot bend |
| 40 | CONSTRUCTION OF UGR including commissioning:- Design, Construction, Testing & Commissioning of 2 Nos. 2.0 lakh ltrs and 3 Nos. 1.0 lakh liters capacity R.C.C. Ground Storage Reservoir (UGR/GSR)for all works such as soil investigation, design, excavation, filling & disposal of earth, RCC & PCC of required grade, shuttering, bonding binding of MS work, painting, finishing etc. including supply of all labours, materials, tools & plants includingtesting & commissioning etc. all complete as per design drawing & direction of EIC.a) At Aleichandi Pump House - 1.0 Lakhb) At Betsul Pump House - 1.0 Lakhc) At Baligohiri Pump House - 2.0 Lakhd) At Gopinathpur Pump House - 1.0 Lakhe) At Kahalia Pump House - 2.0 Lakh |
| 41 | A. Internal Electrification of Pump House at UGR:- a. Internal electrical wiring to Pump House (Single Phase) |
| 42 | b. medium point |
| 43 | c. long point |
| 44 | Surface wiring to fan point in 1sq mm PVC single core multi stand copper wire run inside the casing capping with 6 amp switch incl. cost of all materials, labour charges & taxes as applicable (medium point) |
| 45 | Surface wiring to 3 pin 5amp plug point in 1sqmm pvc single core multi strand copper wire in existing board with connecting of running earth. |
| 46 | S/F of backlight angle holder |
| 47 | S/F of 10amp fuse unit |
| 48 | S/F of indicator lamp |
| 49 | S/F of 16amp Elemeek main switch of ISO 9002 on casing board incl. cost of all materials & labour incl. taxes as applicable. |
| 50 | Internalelectrical wiring (3 phases) Supplying of 100amp 415 volt TPN main switch with fuse unit & neutral bar. The switch to be fixed on MS frame with nut & bolt by drilling holes on MS frame complete with all accessories incl. cost of all materials & earthing connection. |
| 51 | Supplying for MS clamp set for fixing of 4nos of 100amp MCCB, inside Pump House. |
| 52 | Supplying for 100amp MCCB of good quality to be fixed inside Pump House. |
| 53 | C. Surface wiring to motor point, pannel board from 100 amp MCCB, main switch by 10mm sq. PVC copper wire of ISI marked with the materials required as detailes below( with materials required for earth connection) a. 10mm sq PVC single core multi strand copper wire. |
| 54 | b. PVC flexible pipe |
| 55 | c. Flexible pipe saddle |
| 56 | d. No10 earthing copper wire |
| 57 | e. Brass bolt 4\" |
| 58 | f. Nut bolt 1/4\" |
| 59 | g. Nut bolt 3/16\" |
| 60 | h. 10mm earthing socket |
| 61 | i. 10mm ring socket |
| 62 | j. 25mm ring socket |
| 63 | k. Nail & different sizes |
| 64 | l. 4mm thick copper bus bar plate 12\" length |
| 65 | m. HS 48\" Ceiling Fan(Usha/Havells/Orient) |
| 66 | Supplying, Fitting & Fixing of standard earthing conforming to IS:3043.1987 incl. supply & fixing of 38mm/40 dia heavy duty GI pipe 3mtrs long confirming to IS1239 part-1/1990. The pipe shall have 12mm dia perforated holes as 15cm interval center to center up 2.5mtr height from the bottom site of 0.75 x 0.75 x 3mtr the earth pit shall have alternative layer of charcoal & salt around the electrode upto depth of 466mm from the bottom with fitting & fixing of 8nos copper wire of soldering with earthing socket. |
| 67 | C. Bleaching Pump wiring. 1. 1.5mm PVC wire copper make. |
| 68 | 2. PVC flexible pipe |
| 69 | 3. PVC Shaddle |
| 70 | 4. PVC Grip |
| 71 | 5. Screw 1\" & 1.5\" |
| 72 | 6. Earthing wire no.8 copper make |
| 73 | 7. 8\" x 10\" casing board |
| 74 | D. Add labour charges of item B&C |
| 75 | Supply, installation, testing & commissioning of 60watt LED Street light fitting including Bulb & necessary connection as per specification & direction of EIC. |
| 76 | Construction of ESR including Commissioning:- Supplying all Materials labour T&P for Soil testing, Providing of Engineering drawing design & drawing, construction, erection, testing & Commissioning etc. of RCC elevated storage reservoir of 100000 ltr capacity with stagging height of 24.0 mtrand circular Dome Using Cement Concrete M-30 for the container & M-25 for other components with water proofing treatment to to the interior surface of the water container by applying a coat of crystalline water proofing products like xypex or equivalent crystaline products before plastering/ finishing, piping arrangement with supply of pipes, fittings (flanged CI pipe Class-A of 100mm dia & C.I. Puddle collar) for inlet, outlet, over flow & wash out arrangement & length upto 5.0 mtr beyond fce of the structure with provision of ISI marked CI Sluice valve/ Butter fly Valve & its RCC valve Chamber. [6 Nos. 1.0 lakh ltrESR above 24 mtr at (a) Aleichandi (b) Betsul, (c) Station sahi, (d) Kahalia, (e) Rajbati and (f) Gopinathpur.]There should be RCC outer stair case with Stainless steel hand rail (both sides) and support railing at dome and landing level, stainless steel ladder inside and out side the ESR using SS tublar section of size 40mm-50mm (as horizontal and vertical members) respectively. Provision of lighting arrester using copper lightining spike rod 25mm x 3mm GI flat, standard earthing using 40mm dia and 3.0 mtr long GI earth pipe, digital water level indicator, 0.6 m dia CI manhole cover at dome, RCC vent with alluminium jally, painting of the structure with two coats of weather coat over a coat of primer as per the approved colour and opattern of H & UD department etc. all complete as directed by the Engineer-in-charge. N.B.:-The structural design should be made as per the local environmental condition [Considering the design wind speed calculated based on the different risk co-efficient as Topography factor, tarrain co-efficient, cyclonic region factor etc. as per relevant IS codes. Pile foundation or raft type foundation should be proposed considering the soil bearing capacity (test report shall be witnessed by concerned field officer) and the design shall be vatted from approved state technical agency as recomended by the concerned Engineer-in-charge] |
| 77 | CONSTRUCTION OF RCC FRAMED PUMP HOUSE - 7 NOS. [SIZE 10.5 X 3.0 X 3.60 MTR HT WITH R.C.C. ROOFING]:- Double under reamed pile foundation with RCC (1:1.5:3) using 12 mm bhg CB chipse including cost of boring and excluding cost of M.S/Tor steel and labour charges for cutting, bending and binding of steel. etc completed and as per direction of EIC.a. at Aleichandib. at Betsulc. at Kahaliad. at Gopinathpure. at Baligohirif. at Rajbatig. at Baligohiri (Crusher)300 mm dia and 3.5 mtr long Double under reamed pile |
| 78 | Earth work in all kinds of soil in excavation of foundation trenches within 50 m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 in depth and as per direction of EIC .Initial lift upto 1.50m |
| 79 | Supplying all materials, labour T&P and filling in F&P with river sandwell watered and rammed including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. |
| 80 | Supplying all materials, labour T&Pand providing c.c (1:3:6) using 4cm h.g. metal including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 81 | Supplying all materials, labour T&Pand providing c.c (1:1.5:3) using 12 mm h.g. chips including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 82 | Supplying all materials, labour, T&P and providing brick work with F.A. bricks having c.s. not less than 75kg/cm2 with dimensional tolerance ± 2 % in c.m. including watering,curing conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. In F&P (1:6) |
| 83 | In Superstructure(1:6) |
| 84 | Supplying all materials, labour, T & P and providing 2.5 cm thick Damp proof course with (1:2:4) using 12mm size bhg CB chipse including curing etc. all complete as per Specification and direction of E.I.C. |
| 85 | Supplying all materials, labour, T & P and providing 2.5 cm thick grading concrete with (1:2:2) on roof slab with 6mm size bhg CB chipse including curing etc. all complete as per Specification and direction of E.I.C. |
| 86 | Supplying all materials, labour, T &P and providing C.C (1:1.5:3) using 12mm h.g. chips for R.C.C. works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc, all complete as per specification and direction of E.I.C. |
| 87 | Supplying all materials, labour, T&P and providing M.S. Reinforcement for R.C.C. works including cutting, bending, binding and tying the grills and placing in position including cost of binding wire18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 88 | Supplying all materials, labour, T&P and providingrigid & smooth centering & shuttering for R.C.C.works including false work and dismantling them after casting including conveyance of all material, to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C.Lintel |
| 89 | G.Beam |
| 90 | Column |
| 91 | Slab |
| 92 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. 12 mm thick C.P in (1:4) |
| 93 | 12 mm thick C.P in (1:6) |
| 94 | Supplying all materials, labour, T&P and providing cement punning including watering,curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C., |
| 95 | Supplying all materials, labour, T&P and providing25mm thick artificial stone flooring with c.c (1:2:4) including punning using 12mm size h.g. chips including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 96 | Supplying all materials, labour, T&P and providing and fixing M.S. pannel door single leaf with M.S. framed over all size including frame 1830 mm height X 910mm width including conveyance of all materials to worksite, payment specification and direction of E.I.C. |
| 97 | Supplying all materials, labour, T&P and providing and painting two coats with enamel paint over a coat of primer to iron works etc. complete as per direction of E.I.C. |
| 98 | Supplying all materials, labour T&Pand providing and fixing in position 50 mm thick precast cement concret jally (1:1.5:3) with hard granite chips including fitting and fixing of cement mortar (1:3) etc. all complete as per specification and direction of E.I.C. |
| 99 | Supplying all materials, labour T&P and priming 1 coat with any approaved primer including cost of primer & labor etc. all complete as per specification and direction of E.I.C. |
| 100 | Supplying all labour T&P, materials and finishing wall with2 Coats of water proofing cement paint of approved shade on NEW workto give an even shade including cost of paint & labour etc. complete as per direction of E.I.C. |
| 101 | Supplying all labour T&P, materials and finishing wall with weather paint of approve shade on new work two coats to give an even shade including cost of brushes and putty with cost of paint and direction of E.I.C. |
| 102 | CONSTRUCTION OF RCC FRAMED PUMP HOUSE- 3 NOS [SIZE 2.40 x 2.40 x 3.25 MTR HT WITH R.C.C. ROOFING]:- Earth work in all kinds of soil in excavation of foundation trenches within 50 m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding o.30 in depth and as per direction of EIC.a. at Ghataghar Adibasi Sahib. at Mirigini Khaparabanic. at Mirigini Bandha SahiInitial lift upto 1.50m |
| 103 | Supplying all materials, labour T&P and filling in F&P with river sandwell watered and rammed including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. |
| 104 | Supplying all materials, labour T&Pand providing c.c (1:3:6) using 4cm h.g. metal including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 105 | Supplying all materials, labour T&Pand providing c.c (1:1.5:3) using 12 mm h.g. chips including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 106 | Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. works including cutting, bending, binding and tying the grills and placing in position including cost of binding wire18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 107 | Supplying all materials, labour, T&P and providing brick work with F.A. bricks having c.s. not less than 75kg/cm2 with dimensional tolerance ± 2 % in c.m. including watering,curing conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. In F&P (1:6) |
| 108 | In S/S (1:6) |
| 109 | Supplying all materials, labour, T & P and providing 2.5 cm thick grading concrete with (1:2:2) on roof slab with 6mm size bhg CB chipse including curing etc. all complete as per Specification and direction of E.I.C. |
| 110 | Supplying all materials, labour, T&P and providingrigid & smooth centering & shuttering for R.C.C.works including false work and dismantling them after casting including conveyance of all material, to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. Lintel |
| 111 | G.Beam |
| 112 | Column |
| 113 | Beam |
| 114 | Slab |
| 115 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. 12 mm thick C.P in (1:4) |
| 116 | 20 mm thick C.P in (1:4) |
| 117 | 12 mm thick C.P in (1:6) |
| 118 | Supplying all materials, labour, T&P and providing cement punning including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C.Qnty as per item no.9a |
| 119 | Supplying all materials, labour, T&P and providing25mm thick artificial stone flooring with c.c (1:2:4) including punning using 12mm size h.g. chips including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 120 | Supplying all materials, labour, T&P and providing and fixing M.S. pannel door single leaf with M.S. framed over all size including frame 1830 mm height X 910mm width including conveyance of all materials to worksite, payment specification and direction of E.I.C. |
| 121 | Supplying all materials, labour, T&P and providing and painting two coats with enamel paint over a coat of primer to iron works etc. complete as per direction of E.I.C. |
| 122 | Supplying all materials, labour T&P and priming 1 coat with any approaved primer including cost of primer & labor etc. all complete as per specification and direction of E.I.C. |
| 123 | Supplying all labour T&P, materials and finishing wall with2 Coats of distemper of approved shade on NEW worktwo coats to give an even shade including cost of paint & labour etc. complete as per direction of E.I.C. |
| 124 | Supplying all labour T&P, materials and finishing wall with weather paint of approve shade on new work two coats to give an even shade including cost of brushes and putty with cost of paint and direction of E.I.C. |
| 125 | A. Internal Electrification of Pump House - 7 Nos.a. Internal electrical wiring to Pump House (Single Phase) |
| 126 | b. medium point |
| 127 | c. long point |
| 128 | Surface wiring to fan point in 1sqmm PVC single core multi stand copper wire run inside the casing capping with 6 amp switch incl. cost of all materials, labour charges & taxes as applicable (medium point) |
| 129 | Surface wiring to 3 pin 5 amp plug point in 1 sqmm pvc single core multi strand copper wire in existing board with connecting of running earth. |
| 130 | S/F of backlight angle holder |
| 131 | S/F of 10amp fuse unit |
| 132 | S/F of indicator lamp |
| 133 | S/F of 16amp Elemeek main switch of ISO 9002 on casing board incl. cost of all materials & labour incl. taxes as applicable. |
| 134 | Internalelectrical wiring(3 phases) Supplying of 100amp 415volt TPN main switch with fuse unit & neutral bar. The switch to be fixed on MS frame with nut & bolt by drilling holes on MS frame complete with all accessories incl. cost of all materials & earthing connection. |
| 135 | Supplying for MS clamp set for fixing of 4nos of 100amp MCCB, inside Pump House. |
| 136 | Supplying for 100amp MCCB of good quality to be fixed inside Pump House. |
| 137 | B. Surface wiring to motor point, pannel board from 100 amp MCCB, main switch by 10mm sq. PVC copper wire of ISI marked with the materials required as detailes below( with materials required for earth connection) a. 10mm sq PVC single core multi strand copper wire. |
| 138 | b. PVC flexible pipe |
| 139 | c. Flexible pipe saddle |
| 140 | d. No10 earthing copper wire |
| 141 | e. Brass bolt 4\" |
| 142 | f. Nut bolt 1/4\" |
| 143 | g. Nut bolt 3/16\" |
| 144 | h. 10mm earthing socket |
| 145 | i. 10mm ring socket |
| 146 | j. 25mm ring socket |
| 147 | k. Nail & different sizes |
| 148 | l. 4mm thick copper bus bar plate 12\" length |
| 149 | m. HS 48\" Ceiling Fan(Usha/Havells/Orient) |
| 150 | Supply & Fixing of standard earthing conforming to IS:3043.1987 incl. supply & fixing of 38mm/40 dia heavy duty GI pipe 3mtrs long confirming to IS1239 part-1/1990. The pipe shall have 12mm dia perforated holes as 15cm interval center to center up 2.5mtr height from the bottom site of 0.75 x 0.75 x 3mtr the earth pit shall have alternative layer of charcoal & salt around the electrode upto depth of 466mm from the bottom with fitting & fixing of 8 Nos. copper wire of soldering with earthing socket. |
| 151 | C. Bleaching Pump wiring. 1. 1.5mm PVC wire copper make. |
| 152 | 2. PVC flexible pipe |
| 153 | 3. PVC Shaddle |
| 154 | 4. PVC Grip |
| 155 | 5. Screw 1\" & 1.5\" |
| 156 | 6. Earthing wire no.8 copper make |
| 157 | 7. 8\" x 10\" casing board |
| 158 | D. Add labour charges of item B&C |
| 159 | Supply, installation, testing & commissioning of 60watt LED Street light fitting incl. Bulb & necessary connection as per sp. & dir. of EIC. |
| 160 | Dismantling, Supplying, Fitting, Fixing, Erection, Testing & Commissioning (UP-GRADATION) OFEXISTING 25 KVA TO 63 KVA TRANSFORMER SUB-STATION - 4 Nos. [at (a) Gopinathpur, (b) Rajbati, (c) Kahalia, and (d) Stationsahi]: Dismentalling existing Tranformer for up gradation as required as per enhancement of load factor including its supporting accessories etc. completed, as per Section- 8 & 9 of DTCN. (Work to be executed as per TPNODL Specification, procedure & supervision). |
| 161 | Dismantling, Supplying, Fitting, Fixing, Erection, Testing & Commissioning (UP-GRADATION) OFEXISTING 25 KVA TO 100 KVA TRANSFORMER SUB-STATION - 3 Nos. [at (a) Aleichand, (b) Betsule and (c) Talakahalia] : Dismentalling existing Tranformer for up gradation as required as per enhancement of load factor including its supporting accessories etc. completed, as per Section- 8 & 9 of DTCN. (Work to be executed as per TPNODL Specification, procedure & supervision). |
| 162 | CONSTRUCTION OF COMPOUND WALL-1568.00 mtrs with MS Gate [at a. Aleichandi, b. Betsul, c. Kahalia, d. Gopinathpur, e. Baligohiri, f. Rajbati, g. Baligohiri (Crusher)]:- Single under reamed pile foundation with RCC (1:1.5:3) using 12 mm bhg CB chipse including cost of boring and excluding cost of M.S/Tor steel and labour charges for cutting, bending and binding of steel. etc completed and as per direction of EIC . 300 mm dia and 3.5 mtr long single under reamed pile |
| 163 | Earth work in all kinds of soil in excavation of foundation trenches within 50 m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30 in depth and as per direction of EIC .Initial lift upto 1.50m |
| 164 | Supplying all materials, labour T&P and filling in F&P with river sandwell watered and rammed including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. |
| 165 | Supplying all materials, labour, T&P and providing brick work with F.A. bricks having c.s. not less than 75kg/cm2 with dimensional tolerance ± 2% including watering, curing conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. In F&P (1:6) |
| 166 | In Super Structure (1:6) |
| 167 | Supplying all materials, labour, T & P and providing 2.5 cm thick Damp proof course with (1:2:4) using 12mm size bhg CB chipse including curing etc. all complete as per Specification and direction of E.I.C. |
| 168 | Supplying all materials, labour, T &P and providing C.C (1:1.5:3) using 12mm h.g. chips for R.C.C. works including hoisting, laying, watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc, all complete as per specification and direction of E.I.C. |
| 169 | Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. works including cutting, bending, binding and tying the grills and placing in position including cost of binding wire18 to 20 gauge, conveyance of all materials to worksite, payment of taxes etc. all complete as per specification and direction of E.I.C. |
| 170 | Supplying all materials, labour, T&P and providingrigid & smooth centering & shuttering for R.C.C.works including false work and dismantling them after casting including conveyance of all material, to worksite, payment of taxes etc. all complete as per specification and direction of E.I.C.Foundation & Plinth |
| 171 | Column |
| 172 | G. Beam |
| 173 | Slab |
| 174 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C.12 mm thick C.P in (1:6) |
| 175 | Supplying all materials, labour, T&P and providing cement punning including watering,curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 176 | Supplying all materials, labour, T&P and providing and fixing one double leaf M.S. Grill gate (at Front) with M.S. framed over all size including frame 1.80 m height X 3.65 m width & one M.S. Grill gate (at Back) with M.S. framed over all size including frame 1.80 m height X 1.20 m width made out of the following materials confirming to relevant I.S. specification, Hinges size: 100 mm - 6 Nosincluding conveyance of all materials to worksite, payment specification and direction of E.I.C.[two gates at each pump house a. Aleichandi, b. Betsul, c. Kahalia, d. Gopinathpur, e. Baligohiri, f. Rajbati, g. Baligohiri (Crusher)] |
| 177 | Supplying all materials, labour, T&P and providing and painting two coats with enamel paint over a coat of primer to iron works etc. complete as per direction of E.I.C. |
| 178 | Supplying all materials, labour T&P and priming 1 coat with any approaved primer including cost of primer & labor etc. all complete as per specification and direction of E.I.C. |
| 179 | Supplying all labour T&P, materials and finishing wall with weather paint of approve shade on new work two coats to give an even shade including cost of brushes and putty with cost of paint and direction of E.I.C. |
| 180 | BLEACHING DOZING ARRANGEMENT - 7 Nos. :- Chlorination, Supplying, Installation, Testing & Commissioning of Chemical dozing system Chlorinator consisting of Mechanically actuated diapharam type metering pump having capacity to discharge 30 LPH of chemical solution (Bleaching/ Sodium hypochlorite solution) with injection pressure of 10 kg/cm 2 all complete to run the system as per direction of Engineer-in- charge. including supply of in/out suction discharge, NR valve & flexible dozing pipe 5.0 mtr |
| 181 | Supplying all materials labout T & P for fitting and fixing of 25mm dia CPVC flow guard pipes, grade conforming to IS 15778/2007 (SDR-11) with 100 % lead free with NSF & CBRI approved with good quality fittings on walls, floors and mending good the damages after laying as per site requirement etc. complete including testing as per specification and ditection of Engineer-in-charge. |
| 182 | Supplying all materials labout T & P for fitting and fixing of 25mm dia GM/Brass Ball Valve including cost of materials & taxes etc. all complete and testing at site as per site requirement etc. complete including testing as per specification and ditection of Engineer-in-charge. |
| 183 | Supplying all materials labout T & P for construction of RCC tank foundation & Padestal for installation of RCC tank in RCC (1:1.5:3) of size 1.0m x 1.0m x 0.60 mtr over PCC (1:3:6) including certering and shuttering, cost of street, curing & supply of required materials in proper alignment and level etc. all complete as per specification and ditection of Engineer-in-charge. |
| 184 | Supplying all materials labout T & P for construction of RCC Pump foundation &installation of Pump set in RCC (1:1.5:3) of size 1.0m x 1.0m x 0.60 mtr over PCC (1:3:6) including certering and shuttering, cost of steel, curing & supply of required nos of S/S foundation bolt & nuts, fixing the pump base plate in proper alignment and level and level etc. all complete as per specification and ditection of Engineer-in-charge. |
| 185 | Supplying all materials, labour, T & P for fitting and fixing of S/S or special quality PVC check Valve or Non-return valve, Class-2 suitable for pipes etc. complete as per specification and ditection of Engineer-in-charge. |
| 186 | Supplying all materials labout T & P for construction of RCC storage tank in RCC (1:1.5:3) of following size including centering and shuttering, plastering, punning, cost of steel, Curing in proper alignment and level etc. all complete as per specification & direction of Engineer-in- charge-500 ltr capacity RCC storage tank500 ltr capacity RCC storage tank |
| 187 | Accessories for pump sets like coupling, coupling guard, Y type strainer and Pressure release valve (Safty type) complete with installation & testing as per direction of Engineer-in- Charge |
| 188 | Supplying, fitting and fixing of electrical wiring for 3-phase power including supply of necessary electrical cable, plugs etc. from nearest 3-phase power point to work site etc. as per direction of Engineer-in- charge |
| 189 | [Procurement of Automatic Water Level Controller]:- Supplying all materials, labour T & P and installation of automatic water level controller (Sensor) for three phase pump set including round cable, electronic flot & sensor unit etc. all complete including testing & commissioning etc. all complete as per direction of Engineer-in- charge) |
| 190 | [Procurement of DG Set ]:- Supply of 100 KVA/KW three phase radiator coolled silent sterling DG set comprised of ISI Mark Diesel Engine model- G/30-II, coupled with crompton make alternator mounted on a common base frame along with other standard accessories i.e. residential Silencer, batteries with leads, fuel tank, AVM pads with SG1100 Controller With inbuilt Auto start Auto Stop system & Static Battery Charger with Acouistic Enclouser details as per Specification. |
| 191 | Supply of 82.5 KVA/KW three phase radiator coolled silent sterling DG set comprised of ISI Mark Diesel Engine model- G/30-II, coupled with crompton make alternator mounted on a common base frame along with other standard accessories i.e. residential Silencer, batteries with leads, fuel tank, AVM pads with SG1100 Controller With inbuilt Auto start Auto Stop system & Static Battery Charger with Acouistic Enclouser details as per Specification. |
| 192 | Supply of 62.5 KVA/KW three phase radiator coolled silent sterling DG set comprised of ISI Mark Diesel Engine model- G/30-II, coupled with crompton make alternator mounted on a common base frame along with other standard accessories i.e. residential Silencer, batteries with leads, fuel tank, AVM pads with SG1100 Controller With inbuilt Auto start Auto Stop system & Static Battery Charger with Acouistic Enclouser details as per Specification. |
| 193 | Supplying all labour T&P fitting and fixing of on load Change Over Switch Four pole, AC (side handle) in sheet encloser 415 volt AC, 50Hz as per IS mark.:- 200 AMP Change Over |
| 194 | Supplying fitting and fixing and laying of 3.5 core Armoured Cable solid Aluminium conductor upto 10 sqmm, PVC inner sheathed and outer sheathed 650/1100 volt grade as per IS 7098 (part-1) 1988.:- 50 mm2 Armourd Cable |
| 195 | [Commissioning of 6 Nos of UGR ]:- Commissioning of UGR including Installation of pump set with cutting and threading and welding of 4\" dia G.I. pipe (medium), fitting and fixing of valve 4\" dia G.I. bend, and specials including transportation of materials to site etc. including laying of cable line fromUGR to pump house etc. all complete, Supplying all labour T & P with transportation for 10 HP Submersible pump set with motor and fitting and fixing of flat cable tagingfixing M.S. clamp and M.S. plate and necessary materials |
| 196 | Labour for 4\" dia flange joint to socket and bend |
| 197 | Labour for welding of 4\" dia flange with 4\" G.I.socket to column pipe etc. completed |
| 198 | Labour for Flame Cutting and facing of MS Plate or pipes upto 8mm thick etc. completed |
| 199 | Earthwork Variable for 30.0 mtr length |
| 200 | Metal road cutting |
| 201 | Labour for cable joint |
| 202 | Labour for laying of cable pipe up to pump house |
| 203 | Supplying all, materials labour T&P such as providing fitting, fixing of medium grade G.I. pipe cutting to the required size each with threading, welding of flanges with 5/8\" dia hole in flanges. The flanges should be in a horizontal position including cutting grooves for cable with the pipe so that each flanges when joint with rubber insertion packing shall remain water tight etc.completed as per specification and direction of E.I.C.80mm (3\" dia) x 3.0 mtr long G.I.pipe welded with M.S. flanges/Socket joint both side (medium grade) (3 Nos. Pipes x 6 Nos. UGR x 3.0 Mtr. length GI Pipe = 54 Mtr pipes or 3.0 M length pipes 18 Nos.) |
| 204 | 100mm (4\" dia) x 1.0 mtr long G.I.pipe welded with M.S. flanges joint both side (medium grade)(5 Nos. Pipes x 6 Nos. UGR x 1.0 Mtr. length GI Pipe = 30 Mtr pipes or 1.0 M length pipes 30 Nos.) |
| 205 | Fitting and fixing of following materials:- 100mm x 100mm x 100mm x MS Tee |
| 206 | 100mm dia MS flange 10 mm thick |
| 207 | 100mm dia MS Bend |
| 208 | 100mm C.I. NR Valve |
| 209 | 100mm C.I. Sluice Valve Valve |
| 210 | Fitting and fixing of 25 mm dia C.I Air valve |
| 211 | 100mm C.I. Duck foot Bend |
| 212 | 100mm dia G.I. Socket |
| 213 | 100mm x 75mm dia G.I. R/S |
| 214 | 75 mm dia G.I. Nipple |
| 215 | Distribution Line-a) Labour:- Earth work in excavation in pipe line trenches within 50.0 mtriniial lead and 1.50 mtr initial lit in all kind of soilinclding rough dressing and breaking the clods maximum 5cm to 7cm and laying in layers not exceeding 0.30 mtr in depth and as per direction of Engineer-in-charge. |
| 216 | Laying in trenches centrifungally cast (Spun) Ductile iron socket and spigot pipeof the following nominal diameter as per specification and direction of Engineer -in- charge including supplying of all labour, materials,tools & plants required to perform the work (Earth work work in trenches, jointing of pipes, specials & fittings to be measured and paid seperately, including carriage) 100 mm dia Class K-7 D.I. Socket & Spigot pipe |
| 217 | 150 mm dia Class K-7 D.I. Socket & Spigot pipe |
| 218 | 200 mm dia Class K-7 D.I. Socket & Spigot pipe |
| 219 | Supplying all labour, materials T&P and making Push-on joints using rubber rings or push on joints to centrifungally (Spun) D.I. pipes using rubber gasketsof SBR (Styrevebutadine-Rubber) quality of the following nominal dia including testing of the joints but including the cost of rubber rings as per specification complete. 100 mm dia Class K-7 D.I. pipe |
| 220 | 150 mm dia Class K-7 D.I. pipe |
| 221 | 200 mm dia Class K-7 D.I. pipe |
| 222 | Supplying all labour, materials T&P and providing flanged jointsto flanged D.I pipes and fittings of the following nominal dia including testing of the joints, cost of bolts & nuts & rubber insertion as per specification complete., 100 mm dia |
| 223 | 150 mm dia |
| 224 | 200 mm dia |
| 225 | Providing and fixing ofDI Mechanical joint socket to flanged ends of DI pipes including supply of all materials, labour, tools & plantsand testing of joints etc. all complete as per specification and direction of E.I.C. including supplying of all labour,materials,tools & Plants required to perform the work, 100 mm dia |
| 226 | 150 mm dia |
| 227 | 200 mm dia |
| 228 | Supplying all labour, materials T&P and Providing laying of MS pipe of all classesconforming to IS:3589 & IS:3601 of the following outer diameter with internal cement lining etc. all complete as per specification & direction of E.I.C. including supply of all labour, materials T & P reported to perform the work (Earth work will be measured separately)., 100.0mm outside dia & 4.0 mm thick |
| 229 | 100 mm dia x 90 0 bend |
| 230 | MS Flange 100mm dia, 10mm thick |
| 231 | 168.30 mm outside dia & 4.50 mm thick |
| 232 | 150 mm dia x 90 0 bend |
| 233 | MS Flange 150 mm dia 10mm thick. |
| 234 | Flame cutting and facing the MS plate or pipe up to 8mm thick including supply of all labour materials T & P for following plate thickness all complete as per specification and direction of Engineer-in- Charge |
| 235 | Providing joint by welding with two welding beads/Pass conforming to (Fillet weld) to MS pipe and fittings at site by using welding generator including testing of joints, as per specification complete including supplying of all labour, materials, tools & plants required to perform the work |
| 236 | Supplying all labour, T&P for filling in foundation and plinth and pipe trench with excaveted materials including watering and ramming as directed by the Engineer-in-charge. |
| 237 | Supplying all materials, labour T&Pfor Cutting of C.C road Surface (manually) etc. for laying of pipe line including conveyence of all materials etc.all complete as per approved specification and direction of the E.I.C. |
| 238 | Supplying all materials, labour T&Pand filling in F & P with river sand well watered and rammed including conveyence of all materials etc.all complete as per approved specification and direction of the E.I.C. |
| 239 | Supplying all materials, labour T&P and providing C.C. (1:3:6) using 40mm hg metal including curing including conveyence of all materials to work site payment of royalty taxes etc.all complete as per approved specification and direction of the E.I.C. |
| 240 | Supplying all materials, labour T&P and providing C.C. (1:2:4) using 12mm hg chipse including curing including conveyence of all materials to work site payment of royalty taxes etc.all complete as per approved specification and direction of the E.I.C. |
| 241 | Supply, installation & Testing of Cast Iron Sluice valve of RATING PN -1.0 (IS 14846) with double flanged ends for water works purpose conforming to IS: 2685 for the following rating and nominal diameters as per specification complete including supplying of all labour, materials, T & P required to perform the work (including cost of Nut bolts & washer, Rubber insertion sheet etc.) 100 mmdia C.I. S. Valve (PN-1.0) with wheel |
| 242 | 150 mmdia C.I. S. Valve (PN-1.0) with wheel |
| 243 | 200 mmdia C.I. S. Valve (PN-1.0) with wheel |
| 244 | Supply, installation & Testing of Single Air relivevalve conforming to IS: 14845for water works purpose for the following diameter including drilling the water main (Cast iron pipe with metal straps)as per specification complete including supply ofing of all labour, materials,T & P required to perform the work (including cost of Nut bolts & washer, Rubber insertion sheet etc.), 25mm dia C.I. Single Air Valve |
| 245 | Suppying all labour T&P for cutting C.I./ D.I. pipes and inserting specials for jointing, Cutting and welding pipe lines fixing of valves etc. all complete as per direction of Engineer-in- charge.150mm/100 mm dia pipe |
| 246 | Construction of sluice valve chamber of the following nominal size and Specification withprovision for earthwork in excavation in all kinds of Soil, filling sand 0.10 m thick, 0.15 m thick PCC (1:3:6) over wall top, B/W in F & P in CM (1:4), 0.10 m thick RCC (1:1.5:3) in cover slab, 12 mm thick CP in CM (1:4) on outside and top of the wall portion etc. all complete.as per specification for different size of sluice valve.Size 0.91m x 0.91m x 1.20 mtr inside |
| 247 | Transportation of surplus earth and debris by mechanical means & disposing it within a distance of all labour, T & P complete as per direction of Engineer -in-charge |
| 248 | Providing laying, fixing & testing of D.I. specials, bends, etc. in trenchesall complete as per specification and direction of Engineer-in- charge in cluding supplying of all labour,materials, t & P required to perform the work (Excluding E/W) |
| 249 | New W/S Service Connections-280 Nos:- Supplying all Labour, T & P and Cutting/Dismantling of Concrete Pavement by mechanical means for taking the House Service Connections breaking to pieces not exceeding 0.02 Cum in volume and stock pilling at designated location and disposal of dismantaled materials up to a lead of 1000 mtrs, stacking serviceable and unserviceable materials separately and making good to the damages including cost of alllabour, T & P etc. all complete as per the direction of Engineer-in-charge. |
| 250 | Supplying all Labour, T&P and Earth Work in excavation of all kinds of soil within 50m intial lead and 1.5m initial lift including rough dressing and breaking the clods to maximum 5cm to 7cm and layingin layers not exceeding 0.30m in depth as per direction of Engineer-in-Charge. |
| 251 | Supplying all Labour, T&P and Earth Work in filling with excavated materials in all kinds of soil including watering and ramming not exceeding 0.30 m in depth as per direction of Engineer-in-Charge. |
| 252 | Supplying all materials, labour, T&P and Drilling in DI Pipe, fitting, fixing of Ductile Iron Tapping Saddle using suitable bolts, nuts etc., with lead of all materials to site as per direction of Engineer-in-Charge. |
| 253 | Supplying all materials, labour, T&P and fitting, fixing of Brass Gunmetal Ferrule Cock conformingto IS:2692-1978 using suitable rubber \"O\" ring & Teflon Tape etc., in Saddle with lead of all materials to site as per direction of Engineer-in-Charge. |
| 254 | Supplying all materials, labour, T&P and laying in trenches ASTM (Sch-80) PVC Pipes & fittings of the following nominal bore including testing as per P.H specification except earth work as per direction of Engineer-in-Charge.a) 25mm dia PVC Pipe(Sch-80) |
| 255 | Supplying all materials, labour, T&P and cutting groves in pucca floor and walls for taking P.V.C. pipes and fittings and making good to the damages all complete as per specification & direction of Engineer-in-Charge. |
| 256 | Supplying all material, labour, T&P and fitting & fixing followingwater supply fitting and toilet fixures conforming to I:S specification with lead of all materials to site as per direction of Engineer-in-Charge.a) 15mm dia PVCBib Cock. |
| 257 | Supplying all Labour, T & P and materials for restoration of damaged cutting road with CC (1:2:4) with 12mm size crusher broken including cost of materials with all taxes lead, T&P etc., as per direction of Engineer-in-Charge. |
| 258 | Supplying all labouur , T & P for repair of consumer house connection during excavation of trench for laying of D.I. pipe line including earth work in all kinds of soil, fitting and fixing of necessary pipe and fittings, dewatering & refilling the pit with excavated materials etc. all complete to resume the water supply to consumer as per specification & direction of E.I.C. |
| 259 | Shifting of Consumer House Connections-210nos:- Supplying all Labour, T&P and Earth Work in excavation of all kinds of soil within 50m intial lead and 1.5m initial lift including rough dressing and breaking the clods to maximum 5cm to 7cm and layingin layers not exceeding 0.30m in depth as per direction of Engineer-in-Charge. |
| 260 | Supplying all Labour, T & P and Cutting/Dismantling of Concrete Pavement by mechanical means for taking the House Service Connections breaking to pieces not exceeding 0.02 Cum in volume and stock pilling at designated location and disposal of dismantaled materials up to a lead of 1000 mtrs, stacking serviceable and unserviceable materials separately and making good to the damages including cost of alllabour, T & P etc. all complete as per the direction of Engineer-in-charge. |
| 261 | Dewatering the pipe line trenches |
| 262 | Fixing of 15 mm dia ferruel with metal trap |
| 263 | Fitting & fixing of pipe & fittings a) 25 mm dia HDPE pipe |
| 264 | 25 mm dia G.I. Union |
| 265 | 25 mm dia G.I. short piece |
| 266 | 15 x 25 mm dia G.I. R/S |
| 267 | 15 mm dia G.I. Nipple |
| 268 | 25 mm dia G.I. Bend |
| 269 | 25 mm dia G.I. Socket |
| 270 | 15 mm dia G.I. Union |
| 271 | Supplying all materials, labour T&Pand filling in F & P with river sand well watered and rammed including conveyence of all materials etc.all complete as per approved specification and direction of the E.I.C. |
| 272 | Supplying all materials, labour T&P and providing C.C. (1:3:6) using 40mm hg metal including curing including conveyence of all materials to work site payment of royalty taxes etc.all complete as per approved specification and direction of the E.I.C. |
| 273 | Supplying all materials, labour, T &P and providing C.C (1:2:4) using 12mm h.g. chips for C.C. works including hoisting, laying, watering, curing, conveyance of all materials to worksite, curing, conveyance of all materials to worksite, payment of royalty, taxes etc, all complete as per specification and direction of E.I.C. |
| 274 | Supplying all Labour, T&P and Earth Work in filling with excavated materials in all kinds of soil including watering and ramming not exceeding 0.30 m in depth as per direction of Engineer-in-Charge. |
| 275 | Single under reamed pile foundation with RCC (1:1.5:3) using 12 mm bhg CB chipse including cost of boring and excluding cost of M.S/Tor steel and labour charges for cutting, bending and binding of steel. etc completed and as per direction of EIC. 250 mm dia and 3.5 mtr long single under reamed pile |
| 276 | Supplying all materials, labour, T &P and providing C.C (1:1.5:3) using 12mm h.g. chips for R.C.C. works including hoisting, laying, watering, curing, conveyance of all materials to worksite, curing, conveyance of all materials to worksite, payment of royalty, taxes etc, all complete as per specification and direction of E.I.C. |
| 277 | Supplying all materials, labour, T&P and providing M.S. reinforcement for R.C.C. works including cutting, bending, binding and tying the grills and placing in position including cost of binding wire18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 278 | [SITE DEVELOPMENT ]:- Supplying all materials, labour T&P and filling earth in F&P carriage by mechanical means including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. |
| 279 | Earth work in all kinds of soil in excavation of foundation trenches within 50 m initial lead including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding o.30 in depth and as per direction of EIC.Initial lift upto 1.50m |
| 280 | Supplying all materials, labour T&P and filling in F&P with river sandwell watered and rammed including conveyance of all materials to worksite payment of royalty, taxes etc. all complete as per direction of E.I.C. |
| 281 | Supplying all materials, labour T&Pand providing c.c (1:4:8) using 4cm h.g. metal including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 282 | Supplying all materials, labour T&Pand providing c.c (1:1.5:3) using 12 mm h.g. chips including watering, curing, coveyance of all materials to worksite payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
| 283 | Supplying all materials, labour, T&P and providingrigid & smooth centering & shuttering for R.C.C.works including false work and dismantling them after casting including conveyance of all material, to worksite, payment of royalty, taxes etc. all complete as per specification and direction of E.I.C. |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy