Retrofitting Of Pipe Water Supply Scheme Mohadi Tal Dhule Dist Dhule
Tender Value
1.16 Crore
Estimated cost
Bid Submission
13 Sep 2022
0 days left
EMD
1.16 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
mohadi → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Retrofitting Of Pipe Water Supply Scheme Mohadi Tal Dhule Dist Dhule
BOQ
| Sl. No. | Item Description |
| 1 | SUB WORK 1]RAW WATER PUMPING MACHINARYCAPACITY-17.5 HPProviding, erecting and giving tests of submersible pump set confirming to IS 8034 and motor confirming to IS 9283, with water proof winding and discharge with stainless steel shaft. Mortar suitable for working on 415 V = 10% 3 phase 50 Hz A.C. supply with cable guard, thrush carbon/fible bearing to withstand entire hydraulic thrust with suitable suction strainer, pump should have suitable discharge outlet as per manufacture\"s design. Antithrust streamlined run and 2 pairs of erection clamps 80 mm width non return valve.Submersible pump 150 mm dia (with bronze impeller upto 12 stages). From Proposed source to Existing WTP \"Provide duplicate set of SubmersibleMonoblock Pump capable of discharging 13628 litres/hour against a total head 74 M be driven by 17.5B.H.P. electrical motor directly coupled to it.One pump will be in operation and One pump will be standby. |
| 2 | Providing and Fixing L.T. skeleton panel board upto 17.5 HP. (As per detail sheet attached) |
| 3 | Supplying and erecting flat flexible 3 core 4 sq mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete. |
| 4 | Providing & erecting ISI mark G.I. pipeof followingclassanddia. including all local and central taxes, octroi, inspection charges, transportation to stores, etc. complete 150 mm dia (Medium) on well |
| 5 | Providing, supplying and fixing ISI mark CI D/F Reflux valve (non-return valves of following dia including all taxes (central and local), railway freight, inspection charges, unloading from railway wagon, loading into truck, transportation upto departmental store/site, unloading, stacking etc. complete. Reflux valves as per I.S. 5312 part I (1984)a) Reflux valve - PN - 1(Without bypass) 150 mm dia |
| 6 | Providing and fixing double flanged sluice valve confirming for IS-2096/14846 including worn gear arrangements as per test pressure stainles steel spindle, caps including all taxes transportation etc complete. a) Sluice valve - PN - 1(Without bypass) 150 mm dia |
| 7 | Lowering, laying and jointing in position following C.I.D/F Reflex valves, Butterfly valves and Sluice valves including cost of all labour jointing material, including nut bolts and giving satisfactory hydraulic testing etc. complete. (Rate for all class of valves.) a) Sluice valve - PN - 1(Without bypass) 150MM Dia. |
| 8 | Reflux valve PN - 1(Without bypass), 150 mm dia |
| 9 | Providing and erecting pressure gauge of required capacity complete with syphon tube, isolating cock suitable for 12mm dia GI pipe. Pressure gauge shall be installed as directed, with tapping on rising main pressure gauge (100 mm dia) |
| 10 | Providing earthing with galvanized iron earth plate size 60 x60 x 0.6 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover complete with all materials, testing & recording the results as per specification no. EA-EP.Plate type Electrode (IS 3043)1. For panel board- 1No. |
| 11 | Providing and supplying ISI standard CI Flanged/ S&S specials including all taxes (Central and local), railway freight, insurance, unloading from railway wagon, loading into truck transport to departmental store/site, unloading stacking etc. complete.CI D/F specials i) 80 to 300 mm dia |
| 12 | SUB WORK 2] RAW WATER RISING MAIN Material SectionProviding and supplying in standard lengths Polyethelene Pipes, confirming to IS 4984 / 14151 / 12786 / 13488 with nesessary jointing material like mechanical connector i.e. thread / insert joint / quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials, including transportation and freight charges, inspection charges, loading / unloading charges, conveyance to the departmental stores & stacking the same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI & GOM in all respect etc. complete.110 mm dia6kg/cm2 |
| 13 | 140 mm dia6kg/cm2 |
| 14 | Providing and supplying ISI standard pvc specials & fittings including transportation to stores/ site,loading,unloadingchargesexcludingGSTleviedby GOI & GOM,etc. complete. 5% cost of pipes |
| 15 | Providing D.I.pipes (push on joints pressure pipes of D.I. of following class and diameters confirming to the I.S.specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality) excluding GST levied by GOI & GOM in all respect includingThird party inspection charges of TPI Agency approved by MJP includingTransit insurance,RailwayFreight,Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading,stacking etc.completed as directed by Engineer incharges (IS8329/2000 for pipes and IS 158/1969 and IS12820/1989 or latest edition / revision with amendments for Rubber Gaskets.Road and Nalla Crossing 150mm DI K-9 |
| 16 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete Sluice valves PN-1 without bye-pass arrangement150 mm dia. Sluice valve |
| 17 | Providingandsupplying Air Valvesas per IS-10845and MJP’s standard specificationsdoubleorificetypecombinedwithscrewdownisolatingvalve,small orificeelasticballrestingonagunmetalorificenipple,largeorificevulcaniteball seatingon mouldedseatring,inletfaceanddrilled,includingall taxes(Centraland local), insurance, third party inspection charges, loading, unloding, transportatoin upto departmental stores / site, etc. complete.a) Air Valve Single Ball Flanged Type - PN -1 40 mm dia |
| 18 | Labour Section Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift 0 to 1.5 |
| 19 | Excavationfor foundation/ pipe trenchesin hard murum includingremovingthe excavatedmaterialupto a distanceof 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete. Lift 0 to 1.5 M |
| 20 | Excavationfor foundation/ pipe trenchesin soft rock&old cement& lime masonary foundation,asphaIt raod includingremoving the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 M |
| 21 | Excavation for foundation / pipe trenches in Hard rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 M |
| 22 | Filling inplinth floors murum bedding intrenches with approved murum from excavatedmaterialsfromfoundation15to20cmlayersincludingwateringand compaction complete.Murum selected from excavated stuff |
| 23 | Lowering, Laying and Jointing H. D. P. E./M.D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II110 mm dia6kg/cm2 |
| 24 | 140 mm dia8kg/cm2 |
| 25 | Hydraulic testing of PVC pipe line to specified pressure includingcost of all materials and labour and water for testing for specified length including cutting, placing end cap makingarrangement forfillingsafewaterusingreciprocatingtypepumpswhich shouldbeabletoprovidespecified testpressuregaugesandothernecessary equipments,labour,operationcharges,etc. requiredfor testing.The rate underthis itemshallalsoincludecost ofretesting,ifnecessaryandreinstatingtooriginal position 110 mm dia6kg/cm2 |
| 26 | 140 mm dia6kg/cm2 |
| 27 | Lowering, laying, jointing in positionfollowing CI/DF Reflux, butterfly valves and sluice valves including cost of all labors jointing material including nutbolts and giving satisfactory hydraulic testing etc complete ( Rates for all class of valves )150 mm dia. Reflux valve |
| 28 | Providing and fixing in position air valve shaft including providing and fixing GI Medium Class or 6 mm thick M.S. pipe shaft 2.70 M long over branch flange of air valve tee, providing PCC block of M-150 concrete, 150 mm thick around the air valve tee including encasing of vertical shaft in PCC M-150 as shown in type design together with providing and making flanged joints wherever required and fixing of air valve tee, etc. complete as per type design and as directed by Engineer -in- charge for following diameters of pipe lines (type design attached.)40 MM |
| 29 | ProvidingandlayinginsitufollowinggradesofC.C.of trap/granite/quartzite/gneissmetalforfoundationand bedding including dewatering,form work, compacting and curing, finishing etc. complete.b) 1:2:4 (M-150) grade for encasing |
| 30 | Refillingthetrenches withavailableexcavated stuffwithsoftmaterialfirstover pipelineandthenhardmaterialin15cmlayerswithallleadsandliftsincluding consolidation, surcharging,etc. complete. |
| 31 | ProvidingandconstructingB.B.masonryvalvechamberwith15cmthick1:2:4 proportionPCCbedding,excludingexcavation,B.B. masonryin C.M. 1:5 Proportion precast RCC frame and cover, etc. complete as directed by Engineer-in-charge.As above of 60x45cm internal size and depth upto 0.9 m with precast R.C.C slab and cover. |
| 32 | SUB WORK 3]RCC ESRThe rates are applicable for staging heightof 12 M. Theseratesshallbe increasedor decreasedfor per metre variation in this staging height as below:Following rates are for seismic zone III. For zone IV, these rates shall be increased by 5% and for zone II, these rates shall be decreased by 5%. Concerned Executive Engineer shall confirm the seismic zone for the scheme from seismic zones plan before estimation and adopt appropriate rates as per actual seismic zones. (Seismic maps attached in this CSR).RCC ESR 25000 LITRES STAGING HEIGHT 12 M Capacity of ESR-25000 |
| 33 | Providing & supplying ISI standard CI double flanged pipes excluding GST levied by GOI & GOM in all respect including railway freight, insurance , unloading from railway wagon, loading into truck transport to stores, unloading etc. complete as directed by Engineer-in-charge. Inlet 100 mm dia.CI.D./F pipes |
| 34 | Outlet 100 mm dia.CI.D./F pipes |
| 35 | Overflow 100 mm dia.CI.D./F pipes |
| 36 | Washout 100 mm dia.CI.D./F pipes |
| 37 | Providing and supplying ISI standard D. I. specials & fitting with sealing rubber gasket of S.B.R,complete with cast iron follower gland and M.S. nut holts coated or otherwise protected from rusting and suitable for D.l.pipes including cost of labour, materials, and transpoffation to stores, loading and unloading excluding GST levied by GOI & GOM in allrespect etc. complete as per IS-9523.80 mm to 300 mm dia |
| 38 | Providing double flange sluice valve confirming for IS- 14846 including worn gear arrangements as per test pressure, stainless steel spindle, caps, including inspection charges, transportation upto departmental store, unloading, stacking excluding GST levied by GOt & GOM in all respect etc. complete Sluice valves PN-1 without bye-pass arrangement100 mm dia. Sluice valve - Outlet/Distribution |
| 39 | 100 mm dia. Sluice valve - Inlet/Bypass |
| 40 | 100 mm dia. Sluice valve - Washout |
| 41 | SUB WORK 4] DISTRIBUTION SYSTEM MATERIAL Providing and supplying in standard lengths ISI mark rigid unplasticised PVC pipes suitable for potable water with solvent cement joints including cost of couplers, as per IS specification no. 4985 / 1988 excluding GST levied by GOI and GOM in all respect, including transportation, freight charges, inspection charges, loading, unloading, conveyance to the departmental stores and stacking the same inclosed shed duly protected from sun rays and rains including cost of jointing material i.e.solvent cement, etc. complete (self fit type to be jointed with cement solvent).75 mm dia4kg/cm2 |
| 42 | 90 mm dia4kg/cm2 |
| 43 | 110 mm dia4kg/cm2 |
| 44 | 140 mm dia4kg/cm2 |
| 45 | 160 mm dia4kg/cm2 |
| 46 | Providing and supplying ISI standard PVC & GI specials and fittings including transportation to stores/site, loading, unloading charges excluding GST levied by GOI & GOM, etc. complete.10% of cost of pipes |
| 47 | Providing ISI mark G.I. pipe of following class and dia. excluding GST levied by GOI & GOM in all respect, inspection charges, transportation to stores, etc. complete as per IS-1239/2004.Note : One coupler shall be provided with each full length of pipe cost of which is included in rates below. 80 mm dia. GI PIPE C class |
| 48 | 10% of cost of pipes |
| 49 | 80 mm sluice valve |
| 50 | 100 mm sluice valve |
| 51 | 150 mm sluice valve |
| 52 | LABOUR Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 |
| 53 | Excavation for foundation / pipe trenches in hard murum including removing the excavated material upto a distace of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.Lift 0 to 1.5 |
| 54 | Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 M beyond area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. Lift 0 to 1.5 |
| 55 | Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete.Murum selected from excavated stuff |
| 56 | Lowering Laying and jointing with P.V.C pipes and specials of following class and diameter including cost of conveyance from source to site of works including cost of all labour,material,except cement solvent,rubber ring,as per IS code etc.complete (with cement solvent joint/ring fit joint) Working Pressure 4 kg/cm2 75 mm dia 4kg/cm2 |
| 57 | 90 mm dia4kg/cm2 |
| 58 | 110 mm dia4kg/cm2 |
| 59 | 140 mm dia4kg/cm2 |
| 60 | 160 mm dia4kg/cm2 |
| 61 | Hydraulic testing of PVC pipe line to specified pressure includingcost of all materials and labour and water for testing for specified length including cutting, placing end cap makingarrangement forfillingsafewaterusingreciprocatingtypepumpswhich shouldbeabletoprovidespecified testpressuregaugesandothernecessary equipments,labour,operationcharges,etc. requiredfor testing.The rate underthis itemshallalsoincludecostofretesting,ifnecessaryandreinstatingtooriginal position75 mm dia 4kg/cm2 |
| 62 | 90 mm dia4kg/cm2 |
| 63 | 110 mm dia4kg/cm2 |
| 64 | 140 mm dia4kg/cm2 |
| 65 | 160 mm dia4kg/cm2 |
| 66 | Lowering, laying and jointing G. I. pipes and specials of following class and diameter including conveyance from stores to site of works, all labour, etc. complete either underground or in vertical position, as directed by Engineer-in-charge. 80 mm dia. GI PIPE C class |
| 67 | Hydraulic testing of G. I. pipe line to specified pressure including cost of all materials and labour and water for testing for the length upto 1km using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour operation charges etc. required for testing, The rates under this item shall also include cost of retesting if necessaryand reinstating to original postion.80 mm dia. GI PIPE C class |
| 68 | 80 mm sluice valve |
| 69 | 100 mm sluice valve |
| 70 | 150 mm sluice valve |
| 71 | Providing and fixing C.I. road box including loading, unloading and carting to site of work including all necessary excavation in all types of strata and fixing in murum packing, etc. complete 100 mm x 225 mm (20 kg) |
| 72 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 73 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags / cum) For Road Reconstruction PCC M150 |
| 74 | Providing dry trap/ granite/ quartzite/ gneiss,rubble stone soling in 15 cm to 20 cm thick layers including handpacking and compacting, etc. complete. (Bd-A-12/264) SolingPCC |
| 75 | Making cross connection to existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-incharge for following diameters of existing pipeline, irrespective of diameter of branch line. (The number of joints involved will be paid separately depending upon the nature of joints and required pipes, valves and specials will be supplied free of cost at stores.)80mm |
| 76 | 100mm |
| 77 | Disposal of excavated stuff not necessary for otherworksasdirectedbyEngineer-in-charge includingleads and lift involed for disposal off Lead upto 5km |
| 78 | SUB WORK 5]ELECTRO CHLORINATION SYSTEMA- EC- ELECTRO CHLORINATION SYSTEMProviding, erecting, commissioning & giving test & trial for a periodof one month including one year free maintenanceafter commissioning ofElectro chlorinator capable ofgenerating chlorine form common salt by electrolysis usingEC electrodes in form ofsodium hypochlorite solution containing 6-8gmsllit of available chlorinein batch or continuousprocessand capable of providing8 hrsstorageof hypochlorite in case of power failure & nffn llnminr T a) Electrolytic cell consisting dimensionally stable electrodes made from Gr I Titanium sheet with multi metal Oxide coating.b) Electolyzer tank made from PVC -FRP or Acrylic.c) Power pack consisting of transformerrectifier for generating suitable DC current from AC supply along with the control switch for dosing pu.m.ps,etc throughMCB\"s contacts, relays and d) Controlpanelfortheelectrochlorinator consisting of DC voltage and current display incomephasestatus uniton-off switchesfusese) Dosing tank of suitable capacity made from PVCI FRP. f) Dosing pumps of special quality (IW+lS) suitable to handle hypo chlorite solution. g) Entirechlorine solution pipeline shallbe of Chlorine test kit suitable to measure residual chlorine up to 5ppm.h) Chlorine Demand - mg/lit-5 i) Daily Demand-MLD-0.529024 j) Demand in Litres-529024k) Total Chlorine Demand-mg-2645120 l) Pumping Hours-Hrs-12m) Total Chlorine Demand-gms/hr-220.43n) Say 250gms/hr |
| 79 | SUB WORK 6] TRIAL & RUNCommisioning running and maintaining the scheme to quantities, rate capacity, including manning necessory personnel such as operator, valveman, etc, as pr requirements of the scheme and who should also administer chemical dose for a period of one month for individual scheme together with training of personnel spared by MJP/ Local Body and handling over the scheme to Local Body after completion of the above period as directed by Engineer - in charge.For single village (1 Month) |
AI Tender Summary
Tender Timeline
Aug 29, 2022
11:30 IST
Tender Published
Tender notice published.
CompletedSep 13, 2022
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedSep 15, 2022
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender